Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Construction of the new pediatric campus in Dallas reached a major structural milestone on Sept. 29, 2026, when crews placed the final beam on the 12-story frame that will become Moody Children’s Hospital. The topping-out ceremony signals that the main structure has reached its planned height; it is not the hospital’s opening. Children’s Health and UT Southwestern Medical Center project the hospital to open in 2031.
What happened at the topping-out ceremony?
Children’s Health and UT Southwestern Medical Center marked completion of the structural frame with a ceremony attended by pediatric patients, care teams and project leaders. Children’s Health CEO Christopher J. Durovich and UT Southwestern President Daniel K. Podolsky signed the beam before it was placed atop the building.
As an Amazon Associate I earn from qualifying purchases.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
The official photos also show patients and leaders celebrating, care teams being recognized and Andrew Koh, M.D., playing guitar while Suzanne Bouvier and Children’s Health patients sing. These moments presented the milestone as a community event as well as a construction achievement.
What topping out means—and what it does not
“Topping out” traditionally marks installation of the highest structural member of a building. For this project, the final beam completed the 12-story structural frame. Interior construction, building systems, finishes, commissioning and clinical preparations still remain before the facility can receive patients.
Popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
The ceremony took place about two years after work began. Moody Children’s Hospital is projected to open in 2031, so the topping-out date should not be read as an opening date.
Where the campus is being built
The campus is rising in Dallas’ Southwestern Medical District, across Harry Hines Boulevard from William P. Clements Jr. University Hospital. Moody Children’s Hospital will be the centerpiece of the new pediatric development.
Also popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
Project scale at a glance
| Measure | Planned or reported figure |
|---|---|
| Total campus area | More than 5 million square feet |
| Hospital towers | Three |
| Total planned beds | 552 |
| Project value | $5 billion |
| Structural frame reached at ceremony | 12 stories |
| Projected hospital opening | 2031 |
The figures describe the planned campus, not an operating hospital. Bed capacity, square footage and opening timing can change as design, construction and regulatory work progress.
Construction activity behind the milestone
UT Southwestern reported the following project activity figures in 2026:
Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
| Construction activity | Reported amount | Attribution |
|---|---|---|
| Dirt removed | 60,000 truckloads | UT Southwestern, 2026 |
| Water diverted | 88 million gallons | UT Southwestern, 2026 |
| Rebar planned | 37,000 tons | UT Southwestern, 2026 |
| Workers on site | Approximately 1,700 daily | UT Southwestern, 2026 |
These numbers illustrate the logistical scale of the campus build. The rebar figure is a planned quantity, while the worker count is an approximate daily presence; neither should be interpreted as a final project total.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Family-centered features planned for Moody Children’s Hospital
Design plans emphasize an environment intended to support children and the people caring for them. Planned features include:
Also popular on Amazon
- Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
- Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
- Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
- Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
- Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed
- Patient rooms that can accommodate two caregivers
- Personalized room technology
- Adaptable lighting
- Playrooms
- A music therapy suite
- A broadcast studio
- A multifaith chapel
- Spaces for schoolwork
Cameron Strother, who oversees Risk and Environmental, Health and Safety for Children’s Health on the project, said: “This hospital is being built with thought and intention behind every detail.”
What to watch between topping out and opening
The completed frame is one stage in a longer healthcare construction sequence. Subsequent work will include enclosing the building, installing mechanical, electrical and plumbing systems, completing patient and family spaces, fitting clinical areas, testing building systems and preparing the facility for safe operation. The 2031 projection remains the relevant public target for opening, rather than the 2026 ceremony date.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

