DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan Now×
Skip to content
Bettesworth Construction
B3 Arch Bridge

IRF Delegation Visits B3 Arch Bridge on Georgia’s North–South Corridor

Delegates from the 2026 IRF Europe and Central Asia Congress visited Georgia’s B3 Arch Bridge site. Here are the reported dimensions, construction details and project context.

By Bettesworth Construction Team 3 min read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Georgia’s Roads Department led delegates from the 4th International Road Federation (IRF) Europe and Central Asia Regional Congress to the B3 Arch Bridge construction site on October 2, 2026. The bridge is part of the Kvesheti–Kobi section of Georgia’s North–South Corridor. China Railway 23rd Bureau Group, the contractor, said delegates reviewed construction progress and heard about the project’s management and technical measures; its account is the available source for details of the visit and on-site work.

What did the IRF delegation see at the B3 site?

The congress ran in Tbilisi from September 30 through October 2, 2026. According to China Railway 23rd Bureau Group’s October 2 release, the Roads Department of Georgia led participants to the bridge site on the final day. Delegates inspected progress and asked about arch alignment and stress control, construction procedures, winter safety, lifecycle maintenance, and how future work would be organized. No independent account of the visit was identified.

The contractor said it explained its use of European standards, FIDIC contract management, precision control for closing the twin-rib arch, intelligent monitoring, and wind-tunnel test verification. These are measures reported by the company, not an independent assessment of performance. Project manager Han Shuai described the company’s overseas business philosophy as “Quality Delivery, Safety First, Standards Alignment and Local Integration.”

What is the B3 Arch Bridge, and how large is it?

B3 is a deck-type reinforced-concrete arch made of two separated box ribs, according to China Railway 23rd Bureau Group. The company says construction uses cantilever casting with cable-stayed anchoring: concrete sections are cast outward from the supports, while stays help hold the advancing structure in position.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Sale
Thames & Kosmos Structural Eng: Bridges & Skyscrapers | Engineering Set
  • Build 20 different models that each teach about force, load, compression, tension and more
  • Over 285 interchangeable building pieces
  • Includes 36-page, illustrated experiment manual and Assembly guide
  • Skill level: Intermediate

The contractor’s October 2026 release gives the bridge a total length of 437.875 meters, a 286-meter main-arch net span, and a 164-meter vertical difference between the deck and the valley floor. These figures distinguish the full bridge length from the arch’s span and from the bridge’s height above the valley.

Why do published dimensions differ?

The Kvesheti-Kobi project website’s FAQ describes an arch bridge 426 meters long and an arch 285 meters long. Those figures do not match the contractor’s 437.875-meter total length and 286-meter main-arch net span. The published descriptions may reflect different design versions, rounding, or measurement definitions; neither source, as cited here, resolves the difference. They should therefore be read as separate source-specific descriptions, not combined into a single definitive specification.

Rank #2
ROBOTIME 3D Puzzle Wooden Craft Kits with LED Light DIY Tower Bridge Construction Model Kit to Build for Teens Brain Teaser Puzzle Home Decor Birthday Gifts
  • 【DIY London Tower Bridge Model Kit】This 3D London Tower Bridge wooden puzzle with LED light is one of the iconic buildings in Britain, ancient and elegant. Assemble Size: 14.1x2.9x4.6in.
  • 【Unique Gifts】This Tower Bridge construction model kit is the best gift for teens, friends, family members, architectural enthusiasts around the world or those who love handmade crafts on birthday, Christmas, or another occasion.
  • 【English Instruction】This DIY model Tower Bridge Kit cut with exquisite laser technology and accompany english instruction, the matierial is environmentally friendly, non-toxic, 113 pcs easy to assemble, recommended for over 14 years old. Kids can also assemble with the help of adults.
  • 【Fun Project】This 3D puzzles can greatly stimulate the spatial imagination of players, improve the graphics recognition ability, enhance the player's observation and hand-eye coordination ability, Three-dimensional Puzzles is also a very interactive activity for both children & adults
  • 【Perfect Decoration】Our Big Ben model kit is good for Home decoration. It looks great to show on your table, bookshelf, add it in your collections or hang on the window, wherever you put, it makes your home more exquisite and vintage.

What construction conditions does the contractor report?

China Railway 23rd Bureau says work faces Beaufort scale 9 winds, temperatures as low as -20°C, snow accumulation of two meters, and high-intensity seismic conditions. These are contractor-reported conditions; the available material does not independently verify site measurements. The company also describes the future bridge as the Caucasus region’s largest-span reinforced-concrete arch bridge and its span as among the largest worldwide for similar cantilever-cast arch bridges. Those are prospective comparative claims from the contractor, not independently verified rankings.

When is the B3 arch expected to close?

In its October 2, 2026 release, China Railway 23rd Bureau said it would pursue main-arch closure during 2026. That statement is a target, not confirmation that closure has happened. The available account does not establish whether the target was met.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
PATHFINDERS Stem Kit Leonardo Da Vinci Bridge
  • BUILD A REAL DA VINCI INSPIRED BRIDGE Construct a working model based on Leonardo da Vinci’s famous self-supporting bridge design. This hands-on wooden STEM kit demonstrates real engineering principles through an engaging and rewarding building experience.
  • EDUCATIONAL STEM LEARNING EXPERIENCE Explore concepts in engineering, architecture, physics, and history while building. Great for students, hobbyists, makers, homeschool projects, classroom activities, and anyone interested in mechanical design.
  • APPROXIMATELY 1 HOUR BUILD TIME Designed to provide an immersive yet manageable project experience. The completed bridge makes an impressive display piece and conversation starter once assembled.
  • HIGH-QUALITY WOODEN MODEL KIT – AGE 14+
  • Made from durable precision-cut wood components with detailed illustrated instructions. A thoughtful gift idea for teens, adults, engineers, history enthusiasts, and STEM lovers.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How does B3 fit into the Kvesheti–Kobi road project?

The bridge is part of the Kvesheti–Kobi road project, within Georgia’s North–South Corridor. The official project website describes a planned 23-kilometer, two-lane route with five bridges and five tunnels, alongside rehabilitation of one bridge. It identifies Georgia’s Roads Department as commissioning authority and the Asian Development Bank (ADB) and European Bank for Reconstruction and Development as funders.

The project site says the new route is intended to cut the Kvesheti–Kobi journey from about an hour to 15 minutes and shorten the route by 11 kilometers. These are projected benefits, not reported travel results. ADB’s project overview describes about 23 kilometers of two-lane highway and about five kilometers of all-weather access roads; it also includes road-safety awareness and a Khada Valley visitor center in the wider investment.

Rank #4
Fascinations Metal Earth Brooklyn Bridge 3D Metal Model Kit
  • HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up
  • NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs
  • BROOKLYN BRIDGE – 2 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 5.39"L x 0.91"W x 1.97"H (13.7 x 2.3 x 5 cm)
  • FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
  • HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all

Why build a new route?

Official project materials say the existing route is exposed to difficult winter weather, heavy snow, and avalanche risk that can interrupt traffic. The new road is intended to provide more reliable year-round access and safer travel, while improving connectivity for trade, tourism, and economic corridors. Those are project aims, not evidence that the intended outcomes have already been achieved.

Quick Recap

SaleBestseller No. 1
Thames & Kosmos Structural Eng: Bridges & Skyscrapers | Engineering Set
Thames & Kosmos Structural Eng: Bridges & Skyscrapers | Engineering Set
Build 20 different models that each teach about force, load, compression, tension and more
$45.95
Bestseller No. 3
PATHFINDERS Stem Kit Leonardo Da Vinci Bridge
PATHFINDERS Stem Kit Leonardo Da Vinci Bridge
HIGH-QUALITY WOODEN MODEL KIT – AGE 14+
$21.99

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
Windows Errors? Fix Them Before They SpreadFree repair scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.