Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallThe Arthur Ravenel Jr. Bridge opened to traffic on July 16, 2005, replacing two older Cooper River bridges between Charleston and Mount Pleasant. The Federal Highway Administration says the design-build project was intended to add roadway capacity, improve safety, reduce major-maintenance demands and provide greater clearance for ships serving the Port of Charleston. Its listed cost was $675.2 million.
Why the Ravenel Bridge was built
The Cooper River Bridge Replacement project replaced the Grace Memorial and Pearman bridges on US 17. The Federal Highway Administration describes the earlier crossings as functionally obsolete. Rather than simply replacing them with another crossing of the same capacity, the project aimed to address both road traffic and the needs of vessels navigating the Cooper River.
- Road capacity and safety: FHWA lists increased roadway capacity and improved safety among the project’s intended benefits.
- Ship clearance: The new crossing was designed to increase vertical and horizontal navigational clearances for seafaring vessels serving the Port of Charleston.
- Maintenance: FHWA says the project was intended to reduce how often major bridge maintenance was needed and its cost.
These are benefits stated in the project profile; the available information does not provide a before-and-after study quantifying the results.
How the project was delivered and funded
FHWA identifies the Cooper River Bridge Replacement as a design-build project and lists Palmetto Bridge Constructors as the design-builder. WSP | Parsons Brinckerhoff and T.Y. Lin International/HDR are among the partners named in the project profile.
Recommended Free Tools
#1 Best Overall
| FHWA-listed project funding | Amount |
|---|---|
| Total project cost | $675.2 million |
| SCTIB grant | $325 million |
| SCTIB loan backed by TIFIA | $215 million |
| Federal and state funding | $135.2 million |
The three funding components add to FHWA’s stated total project cost. The agency also describes the project as the largest contract in SCDOT history; that is FHWA’s historical characterization, not a claim about the agency’s current largest contract.
When the bridge opened
The Arthur Ravenel Jr. Bridge opened to traffic on July 16, 2005, according to FHWA’s project profile. It carries US 17 across the Cooper River, connecting Charleston and Mount Pleasant.
Rank #2
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs
- BROOKLYN BRIDGE – 2 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 5.39"L x 0.91"W x 1.97"H (13.7 x 2.3 x 5 cm)
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all
Can you walk or bike across the Ravenel Bridge?
Yes, city transportation-plan material from 2018 describes a separated pedestrian and bicycle path along the bridge called Wonders’ Way. An SCDOT announcement from 2005 also described a bicycle and pedestrian path. These historical descriptions establish that the crossing has a path, but do not confirm present-day hours, closures, parking, or all access points.
Before planning a walk or ride, check current SCDOT or municipal information for access and any temporary restrictions. For driving conditions, the City of Charleston’s Traffic Management Center page says bridge and I-26 cameras monitor traffic and reports 12 cameras continuously monitoring the bridge. Camera monitoring is not a guarantee of real-time access information, so consult current official traffic updates before traveling.
Rank #3
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up.
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs.
- PREMIUM SERIES BROOKLYN BRIDGE - 3 Sheet Model with a challenging difficulty level. Once assembled, dimensions are 10.40" L x 2.20 W x 2.20 H inches. 1:6861 Scale.
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all.
What to know about inspections and traffic impacts
Bridge inspections can bring temporary lane closures. SCDOT’s notice of routine inspections scheduled for August 4–10, 2026, described expected minor traffic impacts; those dates have passed and are not a current closure alert. Check SCDOT’s current notices before setting out.
Quick Recap
Best Value
- THE WOODEN SYDNEY BRIDGE 3D MODEL KIT COMES WITH UNIQUE DESIGN YOU WILL LOVE - Be proud to display your assembled Sydney 3D Bridge Wood Puzzles and share your love for iconic landmarks in Sydney Australia. This wooden 3d puzzle bridge makes a model kit for kids who loves architecture model kits, bridge building kit, and 3D building sets for adults. Ideal for kids to start getting interested in building bridges or young engineers building kit.
- THE SYDNEY 3D BRIDGE WOODEN MODEL KIT PUZZLE IS FOR EVERYONE WHO LOVES ICONIC PUZZLES - The Sydney Bridge 3D wooden puzzles for adults and kids is a craft kit to build for those who love playing mind games. Parents can gift 3D wooden puzzles, or architecture model building like this Sydney Bridge to improve mental speed and problem solving skills of their kids. A good bonding project for family, or as kids architecture kit project for school.
- INCLUDED WITH THE PURCHASE OF THE 3D BRIDGE WOOD PUZZLE KIT - Includes 1 Sydney 3D Bridge Wood Craft Puzzle Decor Model Kit with 55 unfinished natural wood puzzle pieces, manual, and 1 paper for sanding the edges. This DIY puzzle bridge building kit for kids can be painted or colored for a more personalized look. Most parts doesn't require glue as the pieces are interlocking. It measures 16.54Lx4.13Wx5.31H inches. Paint and Glue not included.
- HIGH-QUALITY WOODEN PUZZLES FOR ADULTS AND KIDS - This miniature iconic 3D Puzzle Sydney Bridge Wood Model Kit is made of high-grade 3mm natural wood. All wooden puzzle pieces are laser cut and sanded thoroughly to ensure smooth edges. This bridge building educational 3D puzzle feature realistic details of the Sydney bridge, like its arch and towers. Playfully paint this architecture puzzle toy bridge model kit for kids after assembling.
- IDEAL USE FOR THE SYDNEY 3D BRIDGE ADULTS AND KIDS WOOD BUILDING KITS - Challenge your kids or even yourself to build this DIY 3D wooden puzzle Sydney bridge. A perfect addition to your kids wood project, wooden building kits for adults, or wooden Australia puzzles collection. This architecture model building kit puzzle toy can help kids develop their skills in building wood bridge, raise their IQ, problem solving, and shape recognition.
Rank #4
- Out of Print
- 10 Tracks
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.