The LHC public buildings framework is the Public Buildings Construction and Infrastructure (PB3) framework. It gives eligible public-sector organisations a pre-procured route to appoint contractors for new buildings, refurbishment and specified civil-infrastructure work. LHC appoints suppliers after a competitive tender; an authority then selects the appropriate workstream, regional lot and value band, runs the required call-off process and signs a project contract directly with the appointed company.
PB3 is currently stated to run until 30 April 2027. Its terms, scope and value bands should be checked in the latest framework documents before starting a procurement, particularly as LHC has announced a forthcoming successor, PB4.
As an Amazon Associate I earn from qualifying purchases.
What PB3 is—and what it is not
PB3 is an umbrella procurement agreement. It sets the terms under which individual project contracts, known as call-offs, can be awarded during the framework period. Those terms cover matters such as the required works, quality standards, pricing information and contractual conditions.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
“Frameworks are umbrella agreements that set out the terms, that include specification, quality, price, quantity, under which individual contracts (call offs) can be made during the lifetime of the framework (normally 4 years).” — LHC Midlands, London and South East, Public Sector Procurement Frameworks guidance.
#1 Best Overall
SaleNicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
LHC first appoints suppliers through an open tender. The tender documentation sets out the work requirements and asks bidders to submit technical-quality and pricing information. Once appointed, those companies can be considered for projects covered by their lot and workstream.
PB3 is not a construction contract with LHC. For each project, the public body contracts directly with the appointed company under the call-off terms. LHC can support the procurement and monitor delivery, but it is not the party carrying out the building works.
Who can use PB3?
LHC identifies the framework as available to:
- local authorities;
- housing associations; and
- other eligible public-sector bodies.
The organisation still has to confirm that it is an eligible contracting body and that its project falls within the framework scope. PB3 should not be treated as a general-purpose route for any private construction client.
Do these 3 things before closing this tab:
1Fix the driver behind crashes, sound loss and screen glitches2Clear out junk files and repair common Windows errors3Scan for outdated or missing drivers - takes under a minuteWhat work does the framework cover?
PB3 is designed for public-building projects and related infrastructure. Listed project types include:
- education buildings;
- healthcare facilities;
- emergency-services buildings;
- community and social-infrastructure buildings;
- residential properties within mixed-use developments;
- commercial-to-residential conversions;
- student accommodation;
- associated building works; and
- civil infrastructure such as bridges, retaining walls, drainage and roads.
The correct route depends on whether the project is new construction, refurbishment, a combination of both, or infrastructure. The four PB3 workstreams divide those choices and the available project values.
Rank #2
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
PB3 workstreams and value bands
The current PB3 page and framework guide list the following structure. The figures are PB3 terms and should be checked against the current procurement documents before a project is launched.
| Workstream | Permitted scope | Listed value band |
|---|---|---|
| Workstream 1 | New build only | £0–£2 million |
| Workstream 2 | Refurbishment only | £0–£2 million |
| Workstream 3 | New build and/or refurbishment, with associated infrastructure where needed | £2–£7 million |
| Workstream 4 | New build, refurbishment and infrastructure, including standalone infrastructure projects | £7–£14 million; £14–£25 million; and over £25 million |
Workstream 1: new build
Use Workstream 1 when the requirement is new construction only and the estimated project value falls within the listed £0–£2 million band. If the scheme also contains substantial refurbishment or infrastructure, check whether another workstream is required rather than forcing the project into this category.
Workstream 2: refurbishment
Workstream 2 is for refurbishment-only projects in the £0–£2 million band. Define the existing building, the condition issues and the planned alterations clearly so suppliers price the same scope.
Workstream 3: combined building work
Workstream 3 covers projects valued at £2–£7 million that involve new build, refurbishment or both. It can include associated infrastructure when that infrastructure is part of the building project.
Workstream 4: larger projects and standalone infrastructure
Workstream 4 covers the higher bands—£7–£14 million, £14–£25 million and over £25 million—and also permits standalone infrastructure. A bridge, retaining wall, drainage scheme or road project that is not attached to a building project therefore needs particular attention at the workstream-selection stage.
Rank #3
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
Regional lots and appointed suppliers
The PB3 guide records 25 appointed suppliers across 11 regional lots, as reported by LHC Midlands, London and South East in 2021. A project must be matched to the relevant regional lot as well as to the workstream and value band. The supplier list, lot boundaries and appointment status should be verified in the current framework documents; an appointment recorded in an older guide is not, by itself, proof that a company remains available for a new call-off.
Recommended Free Tools
How the PB3 procurement route works
- Define the project. Set out the building or infrastructure scope, estimated value, location, programme, performance requirements and any associated works. Separate new build, refurbishment and standalone infrastructure elements before choosing a workstream.
- Confirm eligibility. Check that the commissioning organisation is an eligible public body and that the proposed works are within PB3’s stated scope.
- Select the workstream, value band and regional lot. Use the project type and estimated value to identify the appropriate PB3 route. For infrastructure, establish whether it is associated with building works or needs the standalone-infrastructure route in Workstream 4.
- Read the current framework documents. The framework guide and tender documentation contain the applicable specifications, quality requirements, pricing information and call-off terms. Check the latest version rather than relying on a historic band, supplier list or template.
- Engage LHC for procurement support. LHC says it can advise on the procurement route, manage expressions of interest and verify prices. Agree what information must be supplied, which suppliers can be approached and what timetable applies.
- Run the call-off process. Invite and assess appointed companies in accordance with the PB3 terms for the selected lot and workstream. Use the stated quality and price requirements and retain an auditable record of the process.
- Award the project contract. The public body enters the individual contract directly with the successful appointed company. The call-off contract—not the umbrella framework alone—controls the project’s detailed obligations, price and programme.
- Manage delivery and close-out. The authority and contractor deliver the works under the call-off. LHC says it continues to monitor projects and liaise with the parties to help resolve delivery issues.
What the tender and call-off documents do
The original supplier tender establishes who is eligible to receive call-offs. It includes the technical-quality and pricing documents and the terms that govern later contracts. A project call-off then applies those terms to a defined site and scope.
This distinction matters. A supplier’s framework appointment does not set the final price for your project, guarantee capacity on your preferred dates or remove the need for a project-specific specification. The authority must still provide the information needed for a comparable response and evaluate the submissions using the procedure stated in the framework documents.
Because the exact call-off mechanics are controlled by the current PB3 documentation, do not assume that every project uses the same award method. Confirm whether the relevant lot requires a particular expression-of-interest, invitation, evaluation or approval sequence before issuing project information.
Who is responsible for what?
| Party | Practical responsibility |
|---|---|
| LHC | Maintains the framework, appoints suppliers through the framework tender, provides procurement support, can manage expressions of interest and verify prices, and monitors projects. |
| Public authority or other eligible client | Defines the project, confirms eligibility and the correct lot, conducts the call-off in line with the framework terms, awards the project and manages its client-side obligations. |
| Appointed company | Responds to the call-off and, if selected, enters the direct project contract with the public client and delivers the agreed works. |
Does using PB3 cost anything?
LHC says its frameworks are free for eligible public bodies to use. “Free to use” means there is no stated framework-access charge; it does not mean that design, construction, professional services, surveys, statutory approvals or other project costs are free. The authority pays the appointed contractor under the individual call-off contract.
Quick wins for a faster PC:
Scan for outdated or missing drivers - takes under a minuteDriver Scan →Repair Windows errors before they cause bigger problemsFix Now →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Rank #4
- Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
- Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
- Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
- Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
- Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed
LHC’s general framework guidance says the not-for-profit group rebates excess revenue generated through levy income to clients annually, based on project invoice value. It says these rebates typically focus on local community social-value projects. The published material does not establish a standard rebate percentage or guarantee that a particular project will receive a payment, so the authority should treat any rebate as a framework-policy matter to be confirmed rather than as part of its construction budget.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Social value and community benefits
The PB3 page describes LHC Lifetime Values and says LHC works with clients and appointed companies to promote, identify, implement and monitor social-value and community-benefit activity. In practice, a client should define measurable outcomes—such as local employment, skills activity or community improvements—within the project requirements and then agree how delivery will be recorded. The framework description supports the opportunity to pursue those outcomes, but it does not promise a specific benefit or result for every call-off.
PB3’s current status and the PB4 transition
The current PB3 page states an expiry date of 30 April 2027. The 2021 framework guide gives the term as 1 October 2021 to 30 April 2027. Authorities planning a procurement close to that date should confirm that the intended call-off can be awarded and completed under the applicable terms, rather than assuming that a project started near expiry can automatically continue afterward.
In an article published on 19 April 2026, LHC described PB4 as the forthcoming fourth iteration. That announcement says its planned scope includes public-building construction and refurbishment and associated civil infrastructure across England, Scotland, Wales and Northern Ireland. It also describes a dedicated hard-facilities-management workstream and broader eligibility for community organisations and other groups receiving public or charitable funding.
Those PB4 characteristics were presented as plans, not final operating terms. The announcement does not establish PB4’s final launch date, supplier appointments, value bands, call-off rules or eligibility wording. Until LHC publishes and confirms the procurement documents, PB3 users should continue to rely on the current PB3 terms and verify any transition advice directly with LHC.
Best Value
- Milwaukee Ink all Fine Point Marker, Black, 4 Per Pack
- 4 per pack Features Clog Resistant Marker Tip Writes through Dusty, Wet and Oily Surfaces Durable Marker Tip for Writing on Concrete, OSB and Rough Surfaces
- Clog resistant tip writes on dusty, wet and oily surfaces and is optimized for rough surfaces such as OSB, cinderblock and concrete
- Hard hat clip- attaches for easy access
- Quick dry time with reduced smearing and marking
Common mistakes and how to avoid them
Calling every LHC route “the public buildings framework”
LHC operates more than one framework. Use the specific name PB3 in approvals, market notices and internal records so it is not confused with another LHC route or with PB4.
Choosing a workstream by budget alone
The value band is only one test. A £1.5 million project that combines refurbishment and new infrastructure may not fit the same route as a £1.5 million new build. Classify the scope first, then check the corresponding band.
Treating historic figures as permanent
The supplier count, regional lots and bands cited in the 2021 guide describe PB3 at that point. Check current documents for amendments, expiry arrangements, supplier status and any changes to lot coverage before procurement.
Free tools Windows power users keep installed
One-click scans. No signup required.
Assuming LHC signs the building contract
The client contracts directly with the appointed company. Make sure internal governance, insurance, payment, variations and dispute procedures are allocated in the call-off contract between those parties.
Assuming framework access makes the project free
There is no stated framework-access charge for eligible public bodies, but the construction project remains a paid contract. Budget for the full project and treat any potential social-value rebate separately.
Leaving infrastructure classification until late
Decide early whether bridges, retaining walls, drainage or roads are associated with the building works or constitute a standalone infrastructure project. That decision can change the appropriate workstream and value band.
A practical PB3 readiness checklist
- Confirm the client is an eligible public-sector body.
- Describe the project as new build, refurbishment, combined work or standalone infrastructure.
- Estimate the value using the basis required by the current framework documents.
- Identify the correct regional lot and check appointed-supplier availability.
- Verify that the selected workstream and band are current.
- Obtain the latest PB3 call-off terms, technical requirements and pricing documents.
- Ask LHC to confirm the expression-of-interest and call-off procedure for the project.
- Build quality, price, programme and social-value requirements into the project information.
- Record the evaluation and award decision for the authority’s audit trail.
- Check the 30 April 2027 expiry and any published transition instructions before committing to a long programme.
Bottom line for public clients
PB3 is a structured route for eligible public bodies to procure construction, refurbishment and specified infrastructure from suppliers already appointed through an LHC tender. Its usefulness comes from the pre-agreed framework terms and the ability to call off a project without creating an entirely new supplier market. The client must still match the project to the right scope, workstream, value band and regional lot, follow the current call-off procedure and contract directly with the appointed company. With PB3 due to expire on 30 April 2027 and PB4 still described as forthcoming, checking the latest LHC documents is essential for every live procurement.