DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowHalloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan Now×
BETTESWORTHConstruction
Pooler GA

Third Lake Development and Third Lake Construction Break Ground on Centro Storage in Pooler, Georgia

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Third Lake Development and Third Lake Construction have broken ground on Centro Storage at Pooler Parkway, a planned climate-controlled self-storage facility in Pooler, Georgia. Announced October 15, 2026, the project is designed to provide approximately 88,579 square feet of rentable space across 772 units for customers in Pooler and the wider Savannah metropolitan area.

What is Centro Storage at Pooler Parkway?

Centro Storage at Pooler Parkway is a new self-storage development with climate-controlled units intended to help protect stored belongings from temperature and humidity fluctuations. The announced unit mix ranges from compact 5-by-5-foot spaces to larger 10-by-36-foot units, allowing the facility to serve needs ranging from household storage to larger furniture, business inventory or equipment requirements.

As an Amazon Associate I earn from qualifying purchases.

Third Lake Development announced the groundbreaking on October 15, 2026. The announcement identifies the project as part of the company’s expanding self-storage portfolio across the Southeast.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How large will the new Pooler storage facility be?

Planned feature Announced detail
Rentable area Approximately 88,579 square feet
Number of units 772
Unit sizes From 5-by-5 feet to 10-by-36 feet
Storage environment Climate-controlled units

The square-footage and unit totals are project plans announced by Third Lake Development in 2026. A final unit schedule, building layout and customer pricing have not been published.

Where is the project located?

The facility will front Pooler Parkway on a site between Interstate 80 and Interstate 16. That position gives the project direct visibility from a major Pooler arterial and convenient connections toward communities throughout the Savannah metropolitan area. Third Lake Development also cites the site’s proximity to residential neighborhoods and dining destinations as part of the location rationale.

For storage customers, access from both interstate corridors could make the facility practical for residents moving within the region, households needing temporary space and local businesses seeking nearby inventory storage. The announcement does not specify operating hours, access technology or the number of vehicle-access lanes.

Who is building Centro Storage?

Role Company
Developer Third Lake Development
General contractor Third Lake Construction
Architect JMN Architecture P.C.
Civil engineer Kimley-Horn

Third Lake Development describes itself as a Tampa-based developer focused on multifamily, build-to-rent and self-storage communities across the Southeast. Its portfolio identifies Centro Storage at Pooler Parkway as one of its self-storage projects.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Why Third Lake says Pooler needs more storage

Luke Thomas, chief executive officer of Third Lake Development, said that as communities grow, demand for well-located and professionally managed storage grows with them. Pooler has expanded as part of the Savannah-area market, and the project team is positioning the facility to serve that growth from a highly visible, accessible site.

Mike Vahle, president of self-storage at Third Lake Development, called the groundbreaking an important milestone in the company’s continued expansion of its self-storage portfolio throughout the Southeast.

What has not been announced yet

The October 15 announcement confirms the groundbreaking, planned size, unit count, location and project team, but it does not provide several details prospective customers and nearby residents may want:

  • No opening date or construction-completion schedule has been stated.
  • Project cost, financing and overall development budget have not been disclosed.
  • The future operating company or facility manager has not been named.
  • Rental rates, reservation timing, access hours and move-in policies are not available.
  • Specific security systems, insurance requirements, parking arrangements and ancillary services have not been described beyond the planned climate-controlled, secure units.

Those details may emerge in later construction updates or leasing materials. Until then, the project should be treated as planned capacity rather than an operating storage option.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

When will Centro Storage at Pooler Parkway open?

Third Lake Development has not announced an opening date for Centro Storage at Pooler Parkway. Breaking ground marks the start of construction, but the available announcement does not establish a delivery quarter or year. Customers seeking storage now will need to use an existing facility; availability, pricing and a move-in schedule for Centro Storage cannot yet be confirmed.

The Bottom Line

Centro Storage at Pooler Parkway is a 772-unit, approximately 88,579-square-foot climate-controlled self-storage project that broke ground in Pooler on October 15, 2026. It will front Pooler Parkway between I-80 and I-16, with Third Lake Development as developer and Third Lake Construction as general contractor. No opening date, operator or project economics have been announced.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.