Halloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan NowHalloween DealsAmazon USOctober picks are moving - compare before checkoutAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction
construction tenders

Peterborough City Council framework 2027–31: lots, value and how to bid

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Peterborough City Council is procuring an open, six-lot professional-services framework for its corporate property portfolio. It covers design, surveying, engineering, compliance and project support, with an estimated value of £30 million excluding VAT. Suppliers must submit electronically through ProContract, and the indexed notice sets the tender deadline at noon on 30 November 2026.

What is the Peterborough City Council framework?

This is a multi-disciplinary consultancy framework under procurement reference 100669-2026, using CPV 71000000 for architectural, construction, engineering and inspection services. Delivery is associated with the East of England (UKH11), and the notice describes the opportunity as suitable for small and medium-sized enterprises.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

A framework establishes suppliers the council can call on for future commissions across its corporate property stock. The published figure is an estimated total framework value rather than a promise that every pound will be spent. Lot estimates are indexed notice figures and should be checked against the current ProContract tender documents.

What are the six lots and their estimated values?

The council has separated the work by discipline, while retaining one broad lot for firms able to provide several services.

Popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
Lot Indicative value (excluding VAT) Main services
1. Multi-disciplinary consultancy £18.0 million Building surveying; architecture; quantity surveying and cost consultancy; structural, mechanical and electrical engineering; heritage and conservation; sustainability, ESG and energy consultancy; project and programme management; accredited NEC supervisors and NEC project managers; planning consultancy; CDM coordination and advice; and Building Regulations Principal Designer services.
2. Structural engineering £1.8 million Structural and civil design and analysis; surveys and assessments; remedial design; temporary works; and structural or civil due diligence.
3. Building surveying £4.2 million Property inspection and diagnosis; dilapidations; technical reports, drawings, specifications and contract documents; accredited NEC supervisors and NEC project managers; and Building Regulations Principal Designer services.
4. Mechanical, electrical and public health £1.2 million Mechanical and electrical design and analysis; surveys, assessments and remedial design; and mechanical or electrical due diligence.
5. CDM and health and safety £1.2 million CDM services, wider health and safety services, and DSEAR services concerning hazardous substances.
6. Fire engineering and building safety £3.0 million Retrospective fire strategies across the asset portfolio; identification of deficiencies and required works; Regulation 38 document reviews; external-wall-system reviews and risk management; and advice or design for construction works.

The wider description also refers to disrepair surveying, retrofit assessment and coordination, party-wall surveying, stock-condition surveying, heritage consultancy, dilapidation surveying, quantity surveying, architect services, and project or programme management. Those activities may sit within relevant lot requirements, so bidders should map them to the specification rather than assume they are separate lots.

When are the key dates?

Milestone Date or timing
Notice published 23 October 2026
Enquiries and clarification activity 20 November 2026
Tender submission deadline 30 November 2026 at 12:00
Expected award decision 16 February 2027
Expected framework end 31 March 2031

Indexed records disagree on the start date: one lists 31 March 2027, while two list 1 April 2027. Treat the ProContract documents as controlling and verify the commencement date, term and any call-off arrangements before submitting.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How do I bid for the framework?

Use the council’s ProContract e-tendering portal. The procedure is open, electronic submission is permitted, and English is the stated submission language.

Also popular on Amazon
Sale
DEWALT 20V MAX Drill and Impact Driver (DCK240C2) | Includes 2 Batteries, Charger and Bag (
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
  1. Obtain the complete tender pack. Download the instructions, specification, pricing schedules, draft framework agreement, selection questions and every lot-specific appendix from ProContract.
  2. Select the lots you can resource. Compare the required disciplines, professional registrations, NEC capability, Building Regulations Principal Designer duties, CDM competence and fire or DSEAR experience with your own staff and approved specialists.
  3. Build evidence for quality questions. Prepare named personnel, availability, relevant property-portfolio examples, delivery methods, reporting templates, mobilisation arrangements and stakeholder-communication procedures.
  4. Resolve uncertainties through the portal. Submit clarification questions before the published enquiry cut-off and rely on the formal answers issued to all bidders, not informal interpretations.
  5. Complete the commercial response. Check that rates, assumptions, exclusions, subcontractor details and any lot-specific pricing follow the supplied schedules.
  6. Submit and confirm receipt. Upload the final response in ProContract well before the closing time, allow for portal validation, and retain the electronic submission confirmation.

The indexed procurement contact is [email protected]. Use the portal for the formal tender response and clarification record.

How will bids be evaluated?

Price is important, but 60% of the published score concerns how the team will perform the work. A low rate without credible resources, mobilisation and reporting evidence will therefore leave substantial points available to competitors.

Criterion Weight What to demonstrate
Price 40% Clear, compliant and competitive rates using the council’s pricing format.
Resource 17.14% Competent named staff, capacity, qualifications, role coverage and access to specialists.
Delivery and capacity 17.14% A practical method for managing commissions, programmes, risk, quality and workload peaks.
Reporting 8.58% Accurate, timely reports, document control, performance information and escalation routes.
Implementation 8.57% A credible mobilisation plan for moving from award to live call-offs.
Communication and engagement 8.57% Clear engagement with council officers, occupants, contractors and other consultants.

Which lot should a construction or property consultancy choose?

Single-discipline practices

Structural, building-surveying, MEP, CDM or fire specialists can target the lot that matches their established accreditations and technical evidence. Concentrating on one lot can reduce delivery risk, but the response still needs enough personnel and back-up capacity for concurrent instructions.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
Push to Unlock,Katerk 6pcs 1/4 inch Hex Shank Aluminum Alloy Screwdriver Bit Holder Light-Weight Quick-Change Extension Bar Keychain Drill Screw Adapter Portable,Black Carabiner,Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

Multi-disciplinary firms

Lot 1 suits organisations that already coordinate several professional disciplines and can provide the NEC, planning, sustainability, heritage and principal-designer functions listed in the scope. Show how interfaces are controlled; listing disciplines without a workable single-team governance model will weaken the delivery case.

Consortia and specialist subcontractors

Where a bidder lacks a required capability, a consortium or named specialist subcontractor may provide a route to the relevant lot, subject to the tender’s conditions. Define the lead organisation, responsibilities, availability, professional indemnity arrangements, quality assurance and escalation process before completing the response.

Choosing by evaluation burden

Every lot carries the same published scoring structure, but the evidence burden differs. Fire, building-safety, CDM and principal-designer submissions must make regulatory competence particularly explicit, while surveying and engineering bids should connect inspection or design outputs to buildable, costed remedial work.

Also popular on Amazon
Sale
2 Pack Carpenter Pencils Mechanical Pencils with 12 Refills, (2 Colors) | Construction Pencils with Built-in Sharpener, Long Nib Deep Hole Pencil Marker, Heavy Duty Woodworking Pencil for Architect
  • Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
  • Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
  • Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
  • Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
  • Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What risks and uncertainties should bidders check?

  • Regulatory change: legislation, building-safety requirements or professional standards may change during the framework term. Explain how competence, advice and templates will be kept current.
  • Operational and technology change: revised council processes, IT systems or delivery standards may require changes to reporting and document exchange.
  • Variable workload: council budgets, property volumes and exceptional events can alter the number and urgency of commissions. Demonstrate scalable resourcing rather than a fixed single-project team.
  • External conditions: political impacts and indexation costs are identified risk areas. Check the draft agreement for allocation, adjustment mechanisms and notice requirements.
  • Procurement status: the opportunity was still at tender stage in the indexed history, with no published award or contract. Do not treat any supplier as appointed until an official result is issued.

Before pricing, reconcile every lot estimate, commencement date, qualification rule, insurance requirement and call-off mechanism with the final ProContract pack. The notice figures provide orientation; the contract documents determine the obligations.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Frequently Asked Questions

Is the £30 million framework value guaranteed to suppliers?

No. It is an estimated aggregate value for the framework, not a commitment to place work or to spend a fixed amount with any appointed supplier. Actual commissions will depend on the council’s requirements, budgets and subsequent call-offs.

Can a small specialist firm bid without offering every discipline?

Yes, the opportunity is identified as suitable for SMEs and is divided into specialist lots. A firm should bid only where it can satisfy the relevant technical, capacity, insurance and quality requirements, using an eligible consortium or subcontractor arrangement if the tender permits.

Where will official clarification answers appear?

The formal clarification trail is handled through ProContract, where answers and amendments are made available to bidders. Check the portal notice and addenda regularly; an email conversation that is not incorporated into the tender record should not be treated as a change to the requirement.

What should a bidder do if its key engineer or surveyor leaves before award?

Maintain a replacement and succession plan that preserves equivalent qualifications, availability and approval status. Any proposed substitution must follow the tender’s rules and should be disclosed promptly rather than leaving a resource gap at mobilisation.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.