October DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix NowOctober DealsAmazon USDeal season is back - check today's better picksAmazon US: current deals, useful picks and tech finds.See Picks×
Skip to content
Bettesworth Construction
elevated corridor

KBR Elevated Corridor: GHMC Committee Approves Revised Proposal; Route and Cost Still Unsettled

GHMC’s Standing Committee approved a revised H-CITI elevated-corridor proposal around KBR Park. The reported 4.3 km route and Rs 1,090 crore cost are not yet reconciled with differing accounts of the alignment and project scope.

By Bettesworth Construction Team 4 min read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

GHMC’s Standing Committee has approved a revised elevated-corridor proposal linked to the H-CITI works around KBR Park, but this is not yet final government sanction or a confirmed construction plan. Hyderabad Mail reported on 5 October 2026 that the corridor would be 4.3 km long and cost Rs 1,090 crore; other reports describe the route and the status of the cost differently. The final alignment, design and project cost therefore remain unclear in the available accounts.

What did GHMC approve?

The approval reported in early October 2026 was by GHMC’s Standing Committee. Telangana Today said the committee approved a single elevated corridor under H-CITI, described as running from NFCL Junction near Punjagutta to Jubilee Hills Check Post. It also reported that Special Chief Secretary Jayesh Ranjan chaired the committee and directed officials to prepare new designs and cost estimates. Telangana Today

The New Indian Express described the decision as approval of a reworked plan, with further steps still ahead: state government consideration, followed by EPC Committee-III and GHMC General Body consideration. It reported that MEIL was proposed to undertake the revised works. The New Indian Express

So, “approved” refers to the Standing Committee’s approval of a proposal—not confirmation that every design, cost, government approval or construction schedule is settled.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
Mould King 19023 Motor Grader Building Set, 1109 PCS Road Grader Construction Vehicle Model Kit, 1:14 Scale Construction Heavy Equipment for Adults, STEM Engineering Building Blocks for Age 14+
  • Realistic 1:14 Scale Motor Grader -- Build an authentic engineering machine with the Mould King 19023 Motor Grader. Designed in a detailed 1:14 scale, this construction vehicle model recreates the appearance and mechanical structure of a real road grader, making it an impressive display piece for engineering enthusiasts.
  • 1109 Pieces Challenging Building Experience -- Featuring 1109 precision building blocks, this engineering construction set delivers an engaging and rewarding assembly experience. Ideal for adults, teens, and advanced builders who enjoy construction vehicle models and mechanical building projects.
  • Functional Steering & Adjustable Blade -- The motor grader model includes realistic mechanical functions such as articulated steering, blade lifting, blade angle adjustment, and transmission components. Explore how heavy construction equipment works while enjoying hands-on building fun.
  • Premium Quality Building Bricks -- Made from durable ABS materials, the pieces fit securely and consistently for a smooth building experience. Compatible with most major building brick brands, allowing builders to expand their engineering vehicle collection.
  • Perfect Gift for Construction Equipment Fans -- Whether for birthdays, holidays, Father's Day, Christmas, or special occasions, this motor grader building kit is an excellent gift for construction machinery enthusiasts, collectors, engineers, and building block fans.

Where is the proposed corridor, and why do reports differ?

The broad area is consistent across accounts: the proposal concerns an elevated connection around KBR Park between the Jubilee Hills Check Post area and NFCL Junction. The reported endpoints and intermediate sections, however, are not fully reconciled.

  • Telangana Today described a single corridor from NFCL Junction near Punjagutta to Jubilee Hills Check Post.
  • The New Indian Express described steel flyover sections from Jubilee Hills Check Post Junction to Mugdha Junction, then Mugdha Junction to Muffakham Jah College, plus a connecting ramp to Banjara Hills Road No. 1.
  • Hyderabad Mail’s 5 October report gave a 4.3 km route from Jubilee Hills Check Post to NFCL Junction and described the scheme as a six-lane, bidirectional corridor.

Because these descriptions do not line up into one clearly documented alignment, the 4.3 km figure and the detailed section-by-section route should be attributed to Hyderabad Mail’s 5 October account, rather than treated as a confirmed final design. The reports reviewed do not provide a primary design drawing that resolves the differences.

Rank #2
Revell 1970 Plymouth Road Runner Plastic Car Model Building Kit 1:24 Scale
  • Revell Model Kit #14531, Skill Level 5, Contains 77-Parts, Recommended for ages 13 and up
  • Detailed 440+6 V-8 engine, hood scoop that can be positioned open or closed
  • Detailed interior with separate side panels and a front bench seat
  • Molded in white and clear with chrome plated parts and black vinyl tires
  • Illustrated assembly instructions. Requires paint and glue. (not included)

What is the reported cost?

Hyderabad Mail reported a Rs 1,090 crore total for the proposed project and broke it into two EPC packages. These figures are that report’s account, not confirmation of a finalized estimate.

Reported package Reported estimate Scope described by Hyderabad Mail
Jubilee Hills Check Post to Mugdha Junction Rs 580 crore First of two EPC packages
Mugdha Junction to Muffakham Jah College Rs 510 crore Includes a ramp to Banjara Hills Road No. 1
Total reported by Hyderabad Mail Rs 1,090 crore Two packages; its report describes a 4.3 km, six-lane, bidirectional corridor

There is a material qualification: Telangana Today and The New Indian Express also reported Rs 1,090 crore in connection with the KBR-area works or revised estimate, while Hyderabad Mail’s 4 October report said cost and other details would be finalized after designs. The reports do not establish whether every use of Rs 1,090 crore refers to precisely the same project scope.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
Revell 85-2627 Peterbilt 359 1:25 Scale 302-Piece Skill Level 5 Model Car Building Kit
  • Revell Model Kit #85-2627, Skill Level 5, Contains 302-Parts, Recommended for ages 13 and up
  • Turning front wheels. Opening doors.
  • Lift-off roof with full sleeper interior.
  • Chains and hoses included. Opening hood with twin turbo diesel engine.
  • Molded in white and clear with chrome plated parts and soft black tires. Requires paint and glue. (not included)

How does the revised proposal relate to the earlier KBR works?

The New Indian Express reported that the state sanctioned an earlier plan for multi-directional flyovers and underpasses in October 2024 at an estimated Rs 826 crore, later revised to Rs 1,090 crore. It said the revised proposal replaces several junction-level structures with longer elevated sections. This is the newspaper’s account of the project history; the underlying sanction and design documents are not included in the accounts cited here.

Telangana Today reported that GHMC had taken up KBR-area flyover and underpass works worth Rs 1,090 crore, with a planned completion period of two years, but said the status of those works was unclear. That two-year period was reported for the earlier works, not confirmed as a schedule for the revised corridor.

Rank #4
Revell 1:25 ’79 GMC C-35 Dually Pickup Model Kit 14593 – “El Jefe” Custom Big Rig Style Truck, Diesel Engine, Opening Hood, 41 Parts, Skill Level 4 Advanced Build for Adults & Teens (12+)
  • ICONIC “EL JEFE” CUSTOM DUALLY TRUCK - Build the legendary 1979 GMC C-35 squarebody pickup reimagined with bold big-rig styling for a truly unique display piece.
  • DIESEL ENGINE DETAIL WITH OPENING HOOD - Features a detailed turbo-diesel engine under an opening hood, showcasing power and realism in every build.
  • BIG-RIG STYLE CUSTOM FEATURES - Includes sky-high exhaust stacks, air horns, mud flaps, step bumper, and sleeper compartment for a semi-inspired custom look.
  • HEAVY-DUTY DUALLY CHASSIS DESIGN - Detailed chassis rides on big-rig style wheels with six tires, giving the model an aggressive stance and realistic presence.
  • PREMIUM MATERIALS & FINISH OPTIONS - Molded in white and clear with chrome-plated parts and soft black tires for enhanced realism and customization.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What remains before construction can be treated as settled?

Officials were reported to be preparing revised designs and cost estimates, and The New Indian Express said additional state and GHMC-level consideration remained after the Standing Committee decision. The available reports do not establish a final alignment, a completed detailed design, a settled project-wide cost or a confirmed construction completion date.

The New Indian Express also reported that a stay order restrained tree-felling within an Eco-Sensitive Zone around KBR Park and that felling and translocation had been put on hold. The reports reviewed do not include the underlying court order or environmental record, so this should be understood as reported project context rather than a complete account of the legal or environmental position.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Best Value
Jixin Xyzhi Construction Kits Stem Metal 3D Puzzle Machine Vehicle Model Car Construction Set Toy Parent-Child Interaction Play Sets Gifts for Children Age 4-16 Years
  • 6-in-1 Multi-Functional Design】:This construction vehicle building set includes 6 assembly options, allowing kids to create model cars and construction vehicles like excavators, bulldozers, and cranes. Assemble one model at a time, with the flexibility to disassemble and rebuild for endless fun. Perfect for boys and girls aged 4-6-16 and a great STEM toy for kids aged 4-6-12-16.
  • 【Inspires Creativity and Hands-On Skills】:With 6 unique building set options, this construction vehicle building set encourages creativity and problem-solving. Kids can enhance logical thinking, focus, and fine motor skills through assembling and reassembling. A great screen-free activity for kids who love cars and toys.
  • 【Perfect for Parent-Child Bonding】:The 1-2 hour assembly process makes this construction vehicle building set an ideal parent-child bonding toy. Building together creates lasting memories and strengthens family bonds. A fun indoor activity for family fun and group play, especially for boys who enjoy building sets
  • 【Ideal Gift for Any Occasion】:Combining fun and educational value, this construction vehicle building set keeps kids engaged while reducing screen time. It’s the perfect birthday gift, Christmas toy, or holiday gift for boys and girls aged 6-16, offering both enjoyment and a sense of accomplishment. A great choice for kids who love building kits.
  • High-Quality and Safe Materials】:Made from eco-friendly materials with smooth edges, this construction vehicle building set ensures a safe building experience for kids. Suitable for children aged 6-16, it’s a trusted choice for parents seeking a safe and educational toy. The metal and plastic parts are durable and designed for long-lasting play.

What does the proposal mean for traffic around KBR Park?

Congestion relief and more direct travel are intended benefits of an elevated route, but the reports reviewed provide no named traffic study or measured benefit figures. Claims about shorter journeys, queues, fuel use or savings should not be read as demonstrated results.

The New Indian Express reported that Hyderabad Traffic Police introduced a clockwise one-way arrangement around KBR Park in August 2026 to facilitate construction and manage traffic, with officials considering whether to make it permanent. That is reported context, not a verified current route instruction; check current traffic-police notices before travelling.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.