Halloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run ScanHalloween DealsAmazon USOctober picks are moving - compare before checkoutAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction
construction

How to Choose a Fish Screen for an Irrigation Diversion

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Choose an irrigation-diversion fish screen only after identifying the governing fish-protection authority, the species and life stages to protect, and the diversion’s maximum flow and hydraulic conditions. Screen opening, effective wetted area, approach and sweeping velocities, bypass access, debris handling, cleaning, inspection and monitoring all have to work together. A generic mesh panel or catalog size cannot establish compliance.

Why the “right size” is not a single dimension

An irrigation fish screen is a complete fish-protection system, not simply a piece of mesh placed over an intake. It must exclude the fish covered by the permit while allowing the approved withdrawal, keep flow conditions safe at the screen face, and guide fish to a bypass or return route. A screen that blocks passage but leaves fish in a dead-end pocket can fail its purpose.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Screen dimensions therefore follow from several project values:

  • the maximum diversion flow, including the operating condition used for approval;
  • the fish species and life stages present during each operating season;
  • the applicable opening or slot-size requirement;
  • the effective wetted screen area after structural members and inactive portions are deducted;
  • approach velocity toward and through the screen;
  • sweeping velocity parallel to the screen face;
  • the location and hydraulic accessibility of the bypass;
  • debris, sediment, flood, access and power conditions; and
  • the inspection, cleaning, testing and reporting program required by the responsible authority.

The same nominal screen width can be adequate at one diversion and inadequate at another because flow, submergence, debris loading and fish requirements differ.

#1 Best Overall
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

Identify the governing authority before choosing equipment

Start by asking which agency has jurisdiction over the diversion. Depending on location and project type, that may be a state, federal, tribal, provincial or another fish-protection authority. The agency determines which species, life stages, seasons and screen configurations are regulated.

NOAA Fisheries’ West Coast Region Anadromous Salmonid Passage Design Manual (2022) consolidated West Coast criteria and superseded earlier regional guidance. It is a starting point for that region, not a universal standard. Washington’s fish-protection guidance likewise directs proponents to verify requirements for their particular site or facility. Confirm the applicable edition and obtain a design review before ordering a screen.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Ask the reviewer to identify the controlling permit, design manual, variance process and acceptance tests in writing. If multiple authorities apply, design to the most restrictive compatible requirement unless the agencies approve another approach.

Define the fish you must protect

Opening size and hydraulic criteria depend on the smallest fish and weakest swimming life stage that must be protected, not merely on the largest adult species observed nearby. Request the required protection list from the agency or fisheries biologist and record:

  • species and life stages;
  • dates or flow conditions when each life stage is present;
  • whether eggs, larvae, juveniles, adults or listed species require protection;
  • whether fish must be protected during the full diversion season or only specified windows; and
  • any special behavioral, debris or sediment concerns identified for the site.

Do not substitute a screen opening used at another project without confirming that its target species and life stages match yours. A screen that is acceptable for one fish community can be unsuitable for another.

Collect the site and operating data

A qualified designer needs measured or documented site data before selecting a configuration. The following checklist keeps the design conversation concrete.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Input What to document Why it changes the selection
Design diversion flow Maximum instantaneous withdrawal, normal operating range, start-up and shutdown conditions, and any seasonal limits Sets the required effective wetted area and hydraulic capacity
Water levels Upstream and downstream elevations, minimum and maximum operating levels, flood levels and drawdown Determines submergence, bypass access and whether the screen remains functional
Fish requirements Species, life stages, seasons and agency criteria Controls opening size, velocities and allowable configuration
Channel hydraulics Approach flow direction, turbulence, velocity distribution, bed slope and nearby structures Affects uniformity, sweeping flow and fish guidance
Debris and sediment Leaves, weeds, woody debris, ice, bed load, suspended sediment and flood-borne material Determines screen orientation, cleaning method and maintenance frequency
Access and utilities Safe work access, lifting equipment, electricity, controls, winter access and disposal route for removed debris Limits practical cleaning and inspection options
Return route Bypass entrance, conveyance, outfall, attraction flow and downstream conditions Ensures fish can leave the screen area without injury or delay

Choose a configuration that fits the hydraulics

Configuration is a design decision, not a cosmetic preference. Common examples described by NOAA include angled screens and rotating drum screens; horizontal screens are addressed in detail in the West Coast manual. Your designer should compare alternatives against the same approval and operating criteria.

Configuration question What to evaluate
Horizontal screen Whether the channel can provide the required uniform approach flow and sweeping flow, how submergence changes usable area, and whether automated cleaning is needed
Angled screen Whether the angle guides fish toward a bypass, maintains safe velocities across the full face and remains clear under local debris loads
Rotating drum screen Whether rotation, seals, drive equipment, cleaning and flood conditions are suitable, and whether the bypass remains accessible at all operating levels

These are examples, not a recommendation for an unspecified site. The approved configuration must be checked against species, flow, sediment, debris, access and agency review.

Size effective wetted area for the maximum diversion flow

Use the area that actually passes water at the approved velocity, not the screen’s outside dimensions. Frames, stiffeners, seals, inactive edges, blocked panels and portions above the waterline reduce effective wetted area. A designer should document the net open area and the calculation for the maximum diversion flow.

Rank #2
Sale
DEWALT 20V MAX Drill and Impact Driver (DCK240C2) | Includes 2 Batteries, Charger and Bag (
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

Submergence is especially important. A screen can have a large nominal surface but too little usable area when water level falls, when a section is blocked, or when the intake operates at a different elevation than assumed. Check the minimum and maximum water levels, not only the design drawing’s typical level.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Velocity should be evaluated across the screen, because a compliant average can conceal a high-velocity corner or a blocked panel. NOAA’s technical manual discusses near-screen hydraulic evaluation and calls for uniform approach velocity. Require the design to show how structural components and expected fouling are included in the area calculation.

Apply approach and sweeping velocity criteria in context

Approach velocity

Approach velocity is the component of water movement toward and through the screen. It must remain within the criterion adopted by the responsible authority and must be reasonably uniform over the active face. Excessive or uneven approach flow can press fish against the screen or draw them into openings.

For a horizontal-screen criterion in NOAA Fisheries’ 2022 West Coast manual, approach velocity should be less than 0.25 ft/s. The same section states that a horizontal screen with an automated mechanical cleaner should have approach velocity less than 0.4 ft/s. Those figures belong to that manual and screen context; they are not universal values for every diversion or jurisdiction.

Sweeping velocity

Sweeping velocity is the component parallel to the screen face. It should move fish toward a bypass rather than allowing them to linger against the screen. NOAA’s horizontal-screen section states: “Sweeping velocity should never be less than 2.5 ft/s or an alternate minimum velocity approved by NMFS that is based on an assessment of sediment load in the water diversion system.” Treat the 2.5 ft/s value as the cited criterion for that manual and configuration, not as a general rule outside it.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Have the hydraulic model or field measurements show velocity direction and magnitude at the screen entrance, along the full face and at the bypass. A bypass that works only at one operating level is not a complete solution.

Canadian criteria are separate

Fisheries and Oceans Canada’s end-of-pipe screen standard uses its own approach-velocity framework. Where fish-community or habitat information is unavailable, it gives a default maximum design approach velocity of 0.055 m/s, with up to 0.12 m/s when ambient flow is at least twice the design approach velocity under the standard’s stated condition. These values must not be substituted for United States or other local criteria.

Specify openings, porosity and materials

Openings must be small enough to prevent the protected fish from passing through or becoming wedged, while retaining enough porosity to pass the required withdrawal without exceeding velocity limits. Specify the opening or slot dimension in the agency-approved orientation and account for manufacturing tolerances, wear and fouling.

Porosity is the fraction of the screen area available for flow. A panel with a high gross open percentage may have a lower effective porosity after frames, support bars, seals or accumulated debris are included. Material selection also affects durability, corrosion, abrasion, biological growth and cleanability. The Canadian standard expressly considers screen or slot size, porosity, effective area and material; equivalent considerations should be documented wherever your local program requires them.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
Sale
Push to Unlock,Katerk 6pcs 1/4 inch Hex Shank Aluminum Alloy Screwdriver Bit Holder Light-Weight Quick-Change Extension Bar Keychain Drill Screw Adapter Portable,Black Carabiner,Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

Ask for drawings identifying clear opening, wire or bar dimensions, structural members, seals, attachment details and the condition used for hydraulic calculations. “Fine mesh” is not a sufficient specification.

Design the bypass as part of the screen

The bypass is the route that returns fish from the screen face to the river or canal reach approved by the agency. Its entrance must be located where fish can find it under the full operating range, and its conveyance and outfall must avoid drops, impacts, predation concentration and damaging turbulence.

NOAA’s plain-language guidance warns that “Dead ends where fish cannot find their way back to the river are almost as bad as no screen at all.” Use that principle during layout review: trace a fish’s path from the first contact with the screen to the return point, including low-flow, high-flow, shutdown and partially fouled conditions. Confirm attraction flow, entrance geometry, capacity, outfall location and downstream water levels with the designer and agency.

Select passive or automated cleaning

Cleaning must be matched to the debris and sediment actually reaching the intake. A passive screen may be appropriate where the site has manageable debris, stable hydraulics, safe access and an operating program that can inspect and clear it as required. Automated mechanical cleaning is more appropriate where debris arrives continuously, access is hazardous, the diversion must run unattended, or fouling would quickly reduce effective area.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Do not treat automation as a substitute for maintenance. Drives, brushes, seals, sensors and controls can fail, and a stopped cleaner can turn a compliant screen into a high-velocity or blocked screen. Specify alarm states, manual override, safe isolation, spare parts, debris disposal and a response time.

NOAA’s manual limits passive screens to specific conditions and requires inspection and maintenance consistent with its criteria. Ask the reviewer to state the required inspection interval, cleaning trigger, records and corrective-action deadline for your project.

Use a step-by-step selection process

  1. Map jurisdiction. Identify every agency with authority over fish passage, water diversion, habitat, listed species and construction. Obtain the current design manual, permit conditions and review contact.
  2. List protected fish. Record species, life stages, seasons and any site-specific biological findings supplied by the agency or qualified biologist.
  3. Confirm the maximum design flow. Include the largest permitted withdrawal and operating transients. Do not size only for the average flow.
  4. Survey hydraulics. Measure or model water levels, approach direction, turbulence, sediment movement, flood conditions and available bypass alignment.
  5. Screen configurations. Compare horizontal, angled, drum or other approved options for effective area, opening, velocity, bypass, debris behavior, cleaning and access.
  6. Calculate effective area. Deduct frames, supports, seals, inactive portions and expected fouling. Check minimum submergence and the full operating range.
  7. Verify velocities. Demonstrate approach-velocity limits, uniformity and required sweeping flow at the screen and bypass. Keep jurisdiction-specific units and criteria together with the calculation.
  8. Detail the bypass. Show entrance, conveyance, outfall, attraction flow and fish-safe conditions at low, normal and high water levels.
  9. Write the maintenance plan. Define cleaning method, inspection frequency, debris and sediment response, access, safety, spare parts, alarms and recordkeeping.
  10. Submit for review before purchase. Provide drawings, calculations, materials, operating rules and monitoring commitments. Wait for written agency acceptance where required.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Plan construction, testing and monitoring

Construction acceptance should verify that the installed system matches the approved design. Check clear openings, panel alignment, seals, structural members, bypass geometry, elevations, controls and access before commissioning.

NOAA’s horizontal-screen criteria call for post-construction velocity testing, daily inspection and maintenance when required, and at least one year of post-construction monitoring for new horizontal-screen facilities. Confirm whether those obligations apply to your project and what test method, reporting format and corrective limits the reviewer will use.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Velocity testing should cover representative operating flows and identify localized high-velocity areas, blocked sections and nonuniform approach conditions. Monitoring records should connect observations to actions: debris removed, panels repaired, cleaner faults reset, bypass conditions checked and agency notifications made when thresholds are exceeded.

Rank #4
Sale
2 Pack Carpenter Pencils Mechanical Pencils with 12 Refills, (2 Colors) | Construction Pencils with Built-in Sharpener, Long Nib Deep Hole Pencil Marker, Heavy Duty Woodworking Pencil for Architect
  • Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
  • Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
  • Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
  • Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
  • Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed

Common selection and installation failures

Ordering by pipe or intake diameter alone

Pipe diameter describes the conveyance, not the fish-safe screen area. Recalculate effective area for maximum diversion flow and the approved velocity criterion.

Using a neighboring project’s opening size

Different species, life stages and agencies can require different openings. Obtain a site-specific approval instead of copying a nearby installation.

Checking average velocity only

Average values can hide a high-velocity corner, a blocked panel or a dead zone that prevents fish from reaching the bypass. Require a distribution check across the full active face.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Ignoring water-level variation

Insufficient submergence can reduce active area or strand the bypass entrance. Evaluate minimum, normal, flood and shutdown levels.

Putting the bypass at a hydraulic dead end

Fish need a continuous, findable route away from the screen. Recheck entrance location, attraction flow and return conditions under every operating mode.

Assuming a cleaner eliminates inspections

Mechanical equipment can fail or overload. Keep manual inspection, alarms, safe access and a contingency procedure.

Buying before agency review

A physically attractive product can still have the wrong opening, area, material, configuration or maintenance requirements. Submit the complete design package before committing to fabrication or installation.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Questions to take to the designer and agency

  • Which state, federal, tribal, provincial or other authority governs this diversion?
  • Which species and life stages must be protected, and during what operating seasons?
  • What is the maximum diversion flow, including start-up, shutdown and seasonal conditions?
  • What effective wetted area is required under the applicable approach-velocity criterion?
  • Which screen configuration and opening size are approved for this location?
  • How are frame members, supports, seals, fouling and submergence included in the area calculation?
  • What approach-velocity limit, uniformity test and sweeping-flow requirement apply?
  • Where does the bypass return fish, and can fish reach that exit across the full operating range?
  • What debris and sediment loads occur, and is automated cleaning required?
  • What inspections, maintenance logs, velocity testing and post-construction monitoring must be completed?
  • What happens if the screen clogs, the cleaner fails, water levels fall or the bypass is unavailable?

Decision checklist before specifying a screen

  • Jurisdiction and current approval criteria are identified.
  • Protected species, life stages and operating seasons are documented.
  • Maximum diversion flow and water-level range are established.
  • Effective wetted area, clear opening and porosity are calculated for the approved condition.
  • Approach and sweeping velocities are demonstrated across the screen face.
  • Bypass entrance, conveyance and outfall are fish-accessible and agency-approved.
  • Debris, sediment, flood and ice conditions are addressed.
  • Cleaning, inspection, alarms, access and spare parts are practical for the site.
  • Construction testing and monitoring obligations are included in the project budget and schedule.
  • Written agency or design-review acceptance is obtained before purchase.

Bottom line

The correct fish screen is the one that an approved hydraulic and biological design shows will protect the required fish at the diversion’s maximum operating flow, while reliably guiding them to a safe bypass. Start with jurisdiction and species, then size effective area, openings and velocities for the actual site. Treat cleaning, inspection, testing and monitoring as part of the screen—not as optional accessories—and verify the complete installation with the responsible agency.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.