Driver FixRecommendedSound, Wi-Fi or graphics acting up? Check drivers firstFind missing or outdated drivers fast.Check DriversHalloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsPC HealthRecommendedCrashes, freezes, slowdowns? Check your PC nowSpot repairable issues before they interrupt work.Check PC×
BETTESWORTHConstruction
construction-site theft

Culpeper Data Center Construction Site Hit by Three Thefts in One Month

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

A data-center construction site near Germanna Highway in Culpeper County was burglarized three times between Sept. 22 and Oct. 22, 2026, the Culpeper County Sheriff’s Office says. The first theft involved copper piping valued by the sheriff’s office at more than $200,000; a separate theft-alert record lists the reported loss as $230,000. Power tools were taken during a later break-in, and investigators believe the same two men returned for the October incidents.

How many times was the Culpeper construction site hit?

Investigators reported three overnight thefts at the site during a one-month period, from Sept. 22 through Oct. 22, 2026. The incidents involved a copper-pipe theft followed by two break-ins in October.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Sept. 22–23: copper piping taken

During the first incident, someone cut the front-gate padlock and removed a large quantity of copper piping from locked storage. The sheriff’s office valued the copper at more than $200,000. A separate theft-alert record lists the reported Type L copper-pipe loss at $230,000; the two figures are reported differently and should not be treated as identical.

Oct. 18–19: power tools taken

In the second incident, intruders cut through fencing on the east side of the property, then cut padlocks securing a storage area. A large number of power tools were stolen. Security cameras captured two masked, gloved males.

Popular on Amazon
Sale
ANNKE 3K Lite Wired Security Camera System Outdoor, 8x 2MP Cameras, 1TB HDD | AI Human/Vehicle Detection, 8CH H.265+ Surveillance DVR and IP67-Rated Home CCTV Camera, IR Night Vision, 24/7 Recording
  • AI Motion Detection 2.0 – Driving AI to the next level, human&vehicle detection and flexible detection area are more accurate than before. For quicker locating in crucial moments, human&vehicle smart searching in recordings offers you great help.
  • Tried-and-True Safe Guard – This one-stop security solution can work with TVI, AHD, CVI, CVBS & IP cameras, the kit includes 1080P cams. The 8CH 3K lite DVR can hook up with 1080P@30fps or 3K/5MP@20fps cams. Therefore, you can also DIY it with other cameras in your home.
  • Reliable 24/7 Continuous Recording – With a pre-installed 1TB HDD(Support up to 10TB HDD), providing 24/7 surveillance recording for you. Upgraded H.265+ saves more storage space and uses less bandwidth, recording videos longer and smoother viewing.
  • Remote Access Anytime, Anywhere – Stay connected through the ANNKE Vision app. View live footage, play back recordings remotely, and check in on your property anytime, anywhere for convenient home security and greater peace of mind.
  • Clear Night Vision and IP67 Weatherproof Protection – Built-in IR LEDs provide black-and-white night vision up to 100ft. With an IP67-rated design, these wired security cameras are built to withstand rain, dust, and changing weather conditions for reliable outdoor surveillance.

Oct. 21–22: another entry through the fence

A third theft occurred overnight just days later. Newly installed cameras recorded people investigators believed were the same two men, apparently entering through the same fence opening used in the prior October break-in.

Who stole the copper and tools, and have the suspects been arrested?

The suspects had not been identified in the latest reports, and no arrest was reported. Investigators believe the same two men were involved in the October incidents; the sheriff’s office has not publicly named them.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
aosu D1 Classic 4-Cam Kit, Security Cameras Wireless Outdoor, Solar Powered | No Subscription Required, 32GB Built-in Storage, 360° Auto Tracking, 2K (3MP) Full-Color Night Vision, Easy Install
  • One Unified Security System, Powered by 1st-Gen aosuBase: 32GB of local storage comes ready to use, holding about 120 days of loop recording. No subscription required. Connect up to 4 cameras to one base with a stable wireless connection and centralized local storage. Recordings saved to aosuBase are event-based, triggered by detected activity.
  • Multi-Cam Live View for All-at-Once Monitoring: Watch up to four live camera feeds simultaneously in the aosu app and monitor multiple areas on one screen without opening each camera individually. Live View is available through the aosu app only; the base does not support HDMI or TV output.
  • 360° Coverage with Pan, Tilt, and Smart Auto Tracking: Pan and tilt to see all around your property. When activity is detected, the camera automatically follows people and other movement to keep the action in view while recording, giving you a more complete view of what happens around your home.
  • 2K (3MP) Clarity with Full-Color Night Vision: Capture clear details in 2K and zoom in up to 6x for a closer look. Built-in spotlights enable full-color night vision, helping you see important color details like clothing and vehicles after dark. For more discreet monitoring, switch to infrared mode for black-and-white night vision without visible lighting.
  • Quick Setup with a Pre-Paired System: Connect aosuBase to your router's LAN port with the included Ethernet cable. Cameras connect wirelessly to aosuBase instead of your home Wi-Fi. The system comes pre-paired, so simply power on the cameras and complete setup in the app without pairing each camera one by one. The cameras are designed to work with the included aosuBase, and add-on cameras connect through the base as well.

The reported activity window was approximately 10 p.m. to 2 a.m. Investigators believe the heavy copper required at least one large vehicle, or multiple vehicles, to remove it. Sheriff Timothy Chilton said, “These are not random hits. The same two people have come back three times in a month, and they know how to get in and out.”

How can you report information about the Culpeper thefts?

Anyone who recognizes the men or their clothing, or who has been offered copper or a large lot of power tools at an unusually low price, can contact lead investigator Detective Millson through the sheriff’s office:

Also popular on Amazon
Sale
Blink Outdoor 4 – Wireless smart security camera, two-year battery life, 1080p HD day and infrared night live view, two-way talk. Sync Module Core included – 3 camera system
  • Outdoor 4 is our most affordable wireless smart security camera yet, offering up to two-year battery life for around-the-clock peace of mind. Local storage not included with Sync Module Core.
  • See and speak from the Blink app — Experience 1080p HD live view, infrared night vision, and crisp two-way audio.
  • Two-year battery life — Set up in minutes and get up to two years of power with the included AA Energizer lithium batteries and a Blink Sync Module Core.
  • Enhanced motion detection — Be alerted to motion faster from your smartphone with dual-zone, enhanced motion detection.
  • Person detection — Get alerts when a person is detected with embedded computer vision (CV) as part of an optional Blink Subscription Plan (sold separately).

Send information to investigators rather than approaching or confronting anyone suspected of involvement.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Frequently Asked Questions

What kind of copper was stolen from the Culpeper data-center site?

The theft-alert record identifies the material as Type L copper pipe. The sheriff’s office described the stolen material as copper piping.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
ANNKE 8CH H.265+ 3K Lite Wired Security Camera System, 4X 2MP Cam, 1TB HDD | 8 Channel DVR with AI Human/Vehicle Detection, Outdoor CCTV Cameras, IP67 Weatherproof, IR Night Vision, No Monthly Fees
  • 【AI Motion Detection 2.0】Driving AI to the next level, human&vehicle detection and flexible detection area are more accurate than before. For quicker locating in crucial moments, human&vehicle smart searching in recordings offers you great help.
  • 【Tried-and-True Safe Guard】This one-stop security solution can work with TVI, AHD, CVI, CVBS & IP cameras, the kit includes 1080P cams. The 8CH 3K lite DVR can hook up with 1080P@30fps or 3K/5MP@20fps cams. Therefore, you can also DIY it with other cameras in your home.
  • 【Reliable 24/7 Continuous Recording】With a pre-installed 1TB HDD(Support up to 10TB HDD), providing 24/7 surveillance recording for you. Upgraded H.265+ saves more storage space and uses less bandwidth, recording videos longer and smoother viewing.
  • 【Remote Access Anytime, Anywhere】Stay connected to your home security system through your smartphone. View live footage and play back recordings remotely, keeping an eye on your property whenever and wherever you need.
  • 【Clear Night Vision and IP67 Weatherproof Protection】Built-in IR LEDs provide black-and-white night vision up to 100ft. With an IP67-rated design, these wired security cameras are built to withstand rain, dust, and changing weather conditions for reliable outdoor surveillance.

Where was the construction site burglary in Culpeper County?

The site is in the Germanna Highway area of Culpeper County, Virginia. The sheriff’s office has not provided a more specific public address in the reports summarized here.

Were the stolen copper or power tools recovered?

The latest reports summarized by the sheriff’s office did not provide a recovery update. Anyone offered the materials for sale at an unusually low price is asked to pass that information to investigators.

Also popular on Amazon
Blink Video Doorbell + Outdoor 4 – Wireless smart security cameras, head-to-toe HD view, two-year battery life. Sync Module Core included – 3 camera system + Video Doorbell
  • Video Doorbell is our second-generation smart security doorbell with up to two years of battery life, an expanded field of view, and improved security features for more peace of mind, no matter where you are.
  • Last longer with two-year battery life — Experience up to two years of smart security coverage on both devices with included AA Energizer lithium batteries and a Blink Sync Module (included with Outdoor 4).
  • See and speak from the Blink app — Experience head-to-toe HD viewing from Video Doorbell and 1080p HD live view from Outdoor 4 as well as infrared night vision and crisp two-way audio.
  • See more at your door with Blink Video Doorbell — Greet guests and watch packages get delivered, day and night, with head-to-toe HD view and infrared night vision. Use two-way talk to hear and speak through the Blink app.
  • Enhanced motion detection with Outdoor 4 — With our all-new Outdoor 4, enjoy a wider field of view and be alerted to motion faster with dual-zone, enhanced motion detection.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
Windows Errors? Fix Them Before They SpreadFree repair scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.