October DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix NowOctober DealsAmazon USDeal season is back - check today's better picksAmazon US: current deals, useful picks and tech finds.See Picks×
Skip to content
Bettesworth Construction
Apex Tannery

Apex Tannery Begins Construction of In-House ETP in Savar

Apex Tannery has begun excavation for an in-house ETP in Savar. The Tk12 crore project is planned to include chrome recovery and sewage treatment, with no completion date announced.

By Bettesworth Construction Team 3 min read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Apex Tannery Limited has started construction of an in-house effluent treatment plant (ETP) at its factory in the BSCIC Tannery Industrial Estate in Hemayetpur, Savar. The first reported work was soil excavation on 26 September 2026—not operation of a treatment facility. The project is reported to cost Tk12 crore and to include chrome recovery and sewage treatment facilities, but no completion or commissioning date has been announced.

What Apex Tannery is building

The project is an individual ETP for Apex’s factory, rather than the shared central effluent treatment plant (CETP) serving the Savar estate. According to The Business Standard’s report of Apex’s Dhaka Stock Exchange disclosure, the company’s board approved the Tk12 crore investment on 13 January 2026. The planned facilities—an ETP, chrome recovery plant and sewage treatment plant—are estimated to occupy 12,000–15,000 square feet. The ETP is intended to treat effluent from production stages spanning wet blue leather through finished leather. (The Business Standard, 14 January 2026)

The company began physical work with soil excavation on 26 September, according to the disclosure reported the following day. Excavation marks the start of construction; it does not show that the plant has been built, tested or put into service. (The Business Standard, 27 September 2026)

Why an individual plant matters in Savar

Apex operates in an industrial estate where tanneries are served by a shared CETP. Reports have raised concerns about the central plant’s capacity and effectiveness. The proposed Apex installation is a separate facility at one company’s factory; its treatment capacity has not been disclosed, so its performance cannot be compared numerically with the CETP.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The Financial Express reported on 4 September 2026 that the existing Savar CETP was designed for 25,000 cubic metres but was effectively treating around 14,000–15,000 cubic metres. Those figures describe the shared plant, not Apex’s proposed ETP. The same report said Commerce and Industries Minister Khandaker Abdul Muktadir planned a new world-standard CETP while the existing one would be remediated. (The Financial Express, 4 September 2026)

In a separate report on a ministerial statement, Bangladesh Sangbad Sangstha said the government intended to raise the central plant’s capacity to 25,000 cubic metres urgently and prepare designs for 40,000 and later 50,000 cubic metres. It also reported that six tanneries had permission to install their own ETPs, with two operating. These were reported policy and status statements; they do not establish that the proposed capacity changes have since been completed. (Bangladesh Sangbad Sangstha)

Rank #2
Septic Tank System Treatment Pods - 12 Dissolving Packets | Enzyme-Producing Live Bacteria Solution | 1 Year Supply Professional Eco-Friendly Maintenance | Prevent Clogs, Odor & Backups | Made in USA
  • Effortless Monthly Maintenance: Keep Your Septic System Healthy with Our Simple Flushable Additive. Just Flush One Packet Down the Toilet for Easy Septic Defense.
  • Natural Live Bacteria: Each Pak Contains a Bio Starter Blend of Billions of CFU Which Produce Helper Enzymes for your Sewer Tank. Compare to Yeast, Chemicals, Cleaner, or Odor Neutralizer that Cover up Long Term Issues in Your Ceptic Tank, Drain Field and Cesspool. ACTIVE is Professionally Formulated & Made in USA.
  • Wide Septic Compatibility: ACTIVE Works in Conventional & Chamber Systems, Drip Distribution System, Both Aerobic and Anaerobic Treatment Units, Rv Holding Tanks, and Black Tanks
  • Full System Clog Eliminator: Save Yourself from Expensive Repairs with our Industrial Strength Drainer & Deodorizer. ACTIVE Septic Treatment Prevents Unwanted Smell and Repair Balance of Beneficial Microbes
  • Best Value Maintenance: Entire Year Supply (12 Treatments) in Each Pack. Compare to Products With Pellets, Tablets, Cakes or Less Packs

The Daily Star quoted the minister on 16 May 2026, speaking specifically about the shared CETP and Eid-ul-Azha waste volume: “During Eid, the CETP does not have the capacity to treat this volume of waste.” The remark concerns seasonal load on the central facility, not a performance measurement of Apex’s planned plant. (The Daily Star, 16 May 2026)

How the project fits the estate’s wider infrastructure

The Public Private Partnership Authority describes the Tannery Industrial Estate as a 200-acre site with 162 tanneries and a central treatment facility. Its project page says the existing estate development project was completed in June 2021 and lists a CETP rectification/upgradation and solid waste management project under PPP in the identification phase, with in-principle approval dated 7 February 2024. The page was last updated on 20 February 2024, so it provides historical context rather than confirmation of the central project’s status in 2026. (Public Private Partnership Authority)

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The two levels of infrastructure have different scopes and timelines:

Facility Scope and reported capacity Reported stage and timing
Apex’s proposed in-house ETP For Apex’s production from wet blue through finished leather; includes planned chrome recovery and sewage treatment facilities. Capacity and technology not stated in The Business Standard’s reports. Soil excavation began 26 September 2026. Completion and commissioning dates not stated in The Business Standard’s 27 September 2026 report.
Savar shared CETP Serves the tannery estate. The Financial Express reported design capacity of 25,000 cubic metres and effective treatment of around 14,000–15,000 cubic metres on 4 September 2026. Government plans for remediation or a new plant, and capacity targets reported by Bangladesh Sangbad Sangstha, are not evidence that upgrades have been completed.

What the stated purpose does—and does not—establish

Apex’s stated purpose is to address environmental regulations and international buyer requirements. That explains the intended role of the investment, but it is not evidence that the facility already meets regulatory limits or buyer standards. The available reports do not say the plant has been inspected, tested, commissioned or certified. (The Business Standard, 14 January 2026)

Rank #4
Biological Wastewater Treatment
  • Used Book in Good Condition
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What remains undisclosed

As of The Business Standard’s construction update on 27 September 2026, the reporting did not provide a completion or operating date. It also did not state the plant’s design capacity, treatment technology, effluent quality targets, discharge route, contractor, equipment supplier, permitting arrangements or inspection plan. No test results or independent evidence of compliance were reported. (The Business Standard, 27 September 2026; The Business Standard, 14 January 2026)

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.