Quick wins for a faster PC:
Clear out junk files and repair common Windows errorsFree Scan →Scan for outdated or missing drivers - takes under a minuteDriver Scan →The figures refer to different stages of a proposed project. In January 2025, the WA Liberals made a conditional election pledge of $37.5 million toward building a 12-court stadium in Kensington. Labor’s earlier $2 million commitment was for planning an indoor sports facility in Perth’s inner southern suburbs—not for construction.
What the $37.5 million pledge covered
PerthNow reported on 12 January 2025 that Liberal leader Libby Mettam promised $37.5 million toward building a proposed 12-court multi-sport stadium in Kensington if the party won the March 2025 state election. The pledge was conditional on election; the report does not establish that the money was later funded or spent. PerthNow’s report
The proposal was not simply a basketball venue. The WA Government described the planned indoor facility as serving hard-court sports including basketball, netball and volleyball. PerthNow reported a 12-court scope for the Liberal pledge. WA Government announcement, 8 November 2024
What Labor’s $2 million was for
In November 2024, the Cook Labor Government announced $2 million to begin planning an indoor sports facility for the inner southern suburbs. The funding was intended to assess potential locations and design options. It was planning money, not a construction allocation. WA Government announcement, 8 November 2024
#1 Best Overall
- PLAN YOUR YEAR IN VELARIS: Stay organized from January through December 2027 with the Officially Licensed A Court of Thorns and Roses Weekly Planner, featuring spacious monthly calendars, vertical weekly layouts, and plenty of room to organize appointments, goals, reading lists, adventures, and everyday plans.
- NIGHT COURT PLANNING FEATURES: Every month includes a beautifully illustrated tabbed divider based on the world of Velaris, featuring celestial artwork, iconic ACOTAR symbols, magical details, and habit-tracking tools to help you stay organized and inspired throughout the year.
- MAGICAL ACOTAR DETAILS: Bring the world of Prythian to every page with holidays, important dates, and 4 sheets of planner stickers, including decorative, clear, writable, weather, and functional stickers that add a touch of Night Court magic to your planning.
- PREMIUM HARDCOVER DESIGN: Crafted with a durable hardcover, stunning iridescent foil detailing, elegant rose gold spiral binding, secure elastic closure, convenient back storage pocket, and removable plastic ruler bookmark for a planner that's as beautiful as it is practical.
- THE PERFECT ACOTAR GIFT: A must-have planner for A Court of Thorns and Roses fans, romantasy readers, and fantasy lovers. Whether you're organizing your schedule, planning your next adventure, or searching for the perfect Sarah J. Maas gift, this 2027 planner brings the magic of Velaris to every day.
The difference matters: the Liberal figure was reported as a conditional pledge toward building the proposed stadium, while Labor’s earlier commitment paid for project planning. They were not competing allocations for the same stage of work.
How the proposed site fits in
City of South Perth council minutes from 10 December 2024 record a petition seeking a 12-court indoor sporting and mixed-use facility at part of 3 Baron Hay Court, Kensington. The minutes describe the site as state-owned and home to Perth Basketball Association. They also note support for the campaign from Perth Basketball Association (the Redbacks) and Perth Reds Volleyball Association. City of South Perth council minutes, 10 December 2024
Rank #2
The minutes document the petition and proposal; they do not show that the council owned the site or approved construction.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Has the $37.5 million pledge been funded?
The available reporting and official records establish the pledge and the earlier planning allocation, but not the post-election funding or delivery status of the proposed facility. They do not establish that the $37.5 million is now available, that construction has begun, or that the project has been completed.
Do these 3 things before closing this tab:
1Fix the driver behind crashes, sound loss and screen glitches2Repair Windows errors before they cause bigger problems3Scan for outdated or missing drivers - takes under a minuteQuick Recap
Best Value
Rank #4
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.




