DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
Skip to content
Bettesworth Construction
Berrien County

Red Arrow Highway Reconstruction: Road Work Scheduled Through November 2026, Trail Date Unconfirmed

Berrien County’s road schedule lists November 2026, but current completion is unconfirmed. The Bridgman–Stevensville trail is planned for 2026, with no opening date announced.

By Bettesworth Construction Team 3 min read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Berrien County’s published schedule lists November 2026 as the expected end of Red Arrow Highway resurfacing, but the available updates do not confirm that the road project is wrapping up or that the bike trail will be complete in November. The trail organization lists construction in 2026 without giving an opening date. The county’s June notice says work began the week of June 8; its November date is a schedule, not confirmation of completion.

What the November date does—and doesn’t—confirm

The county’s construction notice identifies November 2026 as the expected end of the road resurfacing project. A county update index confirms construction began the week of June 8, 2026, but does not provide a Red Arrow-specific progress report or completion confirmation. As of October 7, 2026, the published information supports describing November as the announced schedule—not saying work is nearly finished or complete.

The trail has a separate schedule. Friends of Berrien County Trails lists the Bridgman–Stevensville trail work as a 2026 project, but does not specify a November completion or public opening date. The road and trail are coordinated projects, not one shared completion milestone.

What is included in the highway reconstruction

The work covers Red Arrow Highway in Lake and Lincoln Townships, between Bridgman city limits and Stevensville village limits. The county describes drainage improvements and resurfacing, plus a four-lane-to-three-lane reconfiguration from the traffic signal at the DC Cook Nuclear Plant to the Village of Stevensville.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
OrangeGear® 36"x36" Road Work Ahead Roll-Up Mesh Sign & Steel Stand
  • Complete Kit Included: Comes with one 36” x 36” fluorescent orange roll-up mesh safety sign, one 4-leg steel sign stand, and one pair of durable orange fiberglass cross ribs
  • High-Visibility Mesh Material: Sign is constructed from premium 15 oz fluorescent orange tightly woven mesh for enhanced visibility in work zones and roadside applications
  • Durable Corner Pocket Construction: Signs are equipped with reinforced corner pockets for secure cross rib support
  • Stand & Sign Compatibility: Includes an universal bracket steel stand paired with sturdy corner pockets for secure sign attachment and dependable jobsite performance
  • Compact & Portable Design: Lightweight waterproof steel stand folds down compactly for convenient transport, storage, and quick deployment

During construction, the county said lane closures would leave one lane open in each direction. Its notice instructs drivers to follow posted work-zone signage; traffic controls may change as work progresses. Lincoln Charter Township’s April 17, 2026 notice corroborates the project scope and schedule, but also does not establish current completion status.

Where the new bike trail will go

Friends of Berrien County Trails describes the current work as a four-mile multi-use trail segment along the west side of Red Arrow Highway, connecting Bridgman and Stevensville. The group says the trail is being designed alongside the highway reconstruction and will fit within county road right-of-way after the road loses one travel lane.

Rank #2
OrangeGear® 36"x36" Road Closed Ahead Roll-Up Mesh Sign & Steel Stand
  • Complete Kit Included: Comes with one 36” x 36” fluorescent orange roll-up mesh safety sign, one 4-leg steel sign stand, and one pair of durable orange fiberglass cross ribs
  • High-Visibility Mesh Material: Sign is constructed from premium 15 oz fluorescent orange tightly woven mesh for enhanced visibility in work zones and roadside applications
  • Durable Corner Pocket Construction: Signs are equipped with reinforced corner pockets for secure cross rib support
  • Stand & Sign Compatibility: Includes an universal bracket steel stand paired with sturdy corner pockets for secure sign attachment and dependable jobsite performance
  • Compact & Portable Design: Lightweight waterproof steel stand folds down compactly for convenient transport, storage, and quick deployment

The organization lists planned trailhead parking at Haymarket Brewery and Peat’s Cider Social, with a sign and three bike racks at each site. A bike repair station is also planned at Peat’s. These are plans reported on the organization’s project page; the page does not state when the facilities or trail will open.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How this segment fits the longer Red Arrow Trail

Friends of Berrien County Trails describes a 17.5-mile goal connecting New Buffalo with Shoreham. Its undated project page, accessed October 7, 2026, reports 9.5 miles built or existing, four miles in the current Bridgman–Stevensville project, and four miles still proposed. These are the organization’s project figures, not independent measurements.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
OrangeGear® 48"x48" Road Work Ahead Roll-Up Mesh Sign & Steel Stand
  • Complete Kit Included: Comes with one 48” x 48” fluorescent orange roll-up mesh safety sign, one 4-leg steel sign stand, and one pair of durable orange fiberglass cross ribs
  • High-Visibility Mesh Material: Sign is constructed from premium 15 oz fluorescent orange tightly woven mesh for enhanced visibility in work zones and roadside applications
  • Durable Corner Pocket Construction: Signs are equipped with reinforced corner pockets for secure cross rib support
  • Stand & Sign Compatibility: Includes an universal bracket steel stand paired with sturdy corner pockets for secure sign attachment and dependable jobsite performance
  • Compact & Portable Design: Lightweight waterproof steel stand folds down compactly for convenient transport, storage, and quick deployment

The group says the current segment is fully funded through a $3,096,048 Michigan Transportation Alternatives grant obtained by Berrien County with support from the Southwest Michigan Planning Commission and Friends of Berrien County Trails. Berrien County is to own the new section, while Lake and Lincoln Townships are to maintain it. The organization says funding is still needed for other gaps in the broader route.

Best Value
Traffic Roll-Up Sign Kit with Stand – Collapsible Safety Sign & Heavy-Duty Portable Stand, High Visibility, Easy Setup (Road Work Ahead, Reflective)
  • Complete Sign & Stand Kit – Includes one 36” high-visibility roll-up safety sign and one 4-leg steel sign stand
  • High-Visibility Sign Face – Bright fluorescent orange sign face enhances visibility on job sites; available in mesh, non-reflective, or reflective versions
  • Portable & Easy to Store – Lightweight steel stand folds down compactly for quick transport and convenient storage
  • Quick-Deploy Stand – Kick-release levers allow each leg to be lowered individually for fast setup on the job site
Rank #4
36" Reflective Fluorescent Orange Roll-Up Warning Sign. (ROAD WORK AHEAD)
  • WORK ZONE SIGN: Bright fluorescent orange with reflective material alerts oncoming drivers and pedestrians to construction or work zones
  • HIGH VISIBILITY: Reflective surface and bold coloring ensure maximum visibility in low-light and high-traffic conditions
  • QUICK & EASY SETUP: Supported by durable fiberglass ribs for stability; rolls up for compact storage with included velcro strap
  • LARGE 36” x 36” DISPLAY: Big, easy-to-read format meets visibility needs from long distances
  • MEETS MUTCD STANDARDS: Meets manual on uniform traffic control devices requirements. NCHRP-350 approved sign perfect for all types of work zone/construction projects

What drivers and trail users can rely on now

  • Drivers: The published road schedule points to November 2026, but no reviewed update confirms the project’s present stage. Follow signs and on-site traffic controls rather than relying on an old lane-closure description.
  • Trail users: The planned route is a four-mile west-side connection between Bridgman and Stevensville. The trail organization gives no confirmed completion or opening date, so do not assume it will be ready in November.
  • Anyone following the schedule: Check Berrien County’s project updates and the trail organization’s Red Arrow project page for newer information. The county’s June notice and the township’s April notice are schedule announcements, not live status reports.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.