The Society for College and University Planning’s Campus Facilities Inventory (CFI) is a peer-benchmarking resource for campus space and facilities, not a forecast of projects that are certain to happen. Its 2022 findings, as reported by Building Design + Construction, pointed toward adapting existing buildings, planning for research and maker spaces, and reconsidering how campuses use athletic, outdoor, and student living areas. Those are historical survey responses—not a description of construction activity today. SCUP later published a 2023 CFI report and identifies that dataset as the program’s final benchmark year.
What is the Campus Facilities Inventory?
The Campus Facilities Inventory is a survey and benchmarking resource intended to help colleges and universities compare their facilities and space use with those of peer institutions. SCUP, a professional association for college and university planners, relaunched it in 2021 in partnership with brightspot strategy, a Buro Happold company. The original inventory had been collected and published from 2003 through 2007.
As an Amazon Associate I earn from qualifying purchases.
Recommended Free Tools
The revived inventory updated its room-use taxonomy, expanding it from 15 categories to 19. The classification was based on the National Center for Education Statistics’ Postsecondary Education Facilities Inventory and Classification Manual. A shared taxonomy makes it more practical to compare like kinds of space across institutions, although the numbers still need to be read in context: an institution’s type, location, and student headcount can all affect what a useful comparison looks like.
SCUP describes the later 2023 report as combining space-use data with recent and planned facility changes. It offers aggregate reporting and comparisons by institution type, location, and student headcount. SCUP says the program concluded after the 2023 collection, making that dataset the final benchmark year. The 2023 report is available as a paid PDF on SCUP’s report page; the publicly available page does not disclose its detailed numerical findings.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
What did the 2022 CFI say about campus space per student?
The 2022 quantitative results showed a marked difference between two groups of small four-year institutions: small private colleges averaged 58.7 net aggregate square feet of instructional space per in-person student, compared with 35.2 square feet at small public colleges. These figures are reported by Building Design + Construction from the 2022 CFI; they should not be treated as a universal space standard.
| Institution group in the 2022 report | Average instructional space per in-person student |
|---|---|
| Small private four-year institutions | 58.7 net aggregate square feet |
| Small public four-year institutions | 35.2 net aggregate square feet |
The comparison is useful because it illustrates why a single “square feet per student” figure can mislead. The reported groups differ by institutional type, and the measure concerns instructional space per in-person student—not all campus buildings divided by total enrollment. It does not establish that either group has too much or too little space, nor does it say what an individual campus should build. A planner applying the benchmark would need to preserve the comparison group and consider location and headcount as well.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
The report’s quantitative section drew responses from 104 U.S. institutions and one Canadian institution. Its qualitative section included 31 institutions, most of them four-year public schools. These samples describe participating institutions; they should not be read as a census of all North American campuses. The distinction also matters when reading broad statements about what “colleges” plan to do: the space-use averages and the qualitative plans came from different response sets.
Were colleges more likely to adapt buildings or construct new ones?
In the 2022 qualitative responses, institutions were more likely to report updating or adapting existing facilities than building new ones. They were also more likely to change administrative offices than academic offices. This points to a planning emphasis on making existing assets serve changing needs, but it does not mean that new construction had stopped or that every respondent chose renovation.
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
For campus owners and project teams, the distinction is important. “Adaptation” can involve changing how a facility functions, while new construction adds a building or space. The survey finding supports the conclusion that respondents more often anticipated work on existing facilities; it does not specify the cost, scope, condition, or delivery method of those projects. Nor does it establish that renovation is always less expensive or faster than replacement. Those decisions require building-specific assessments and project information that the survey summary does not provide.
Adaptive reuse appeared as a specific planning strategy: 84 percent of 2022 respondents said it was planned, compared with 76 percent in 2021. That is an increase in the share reporting plans, not a count of completed conversions or a measure of how much space was reused. It is evidence of stated intent in those survey years, not proof of subsequent construction outcomes.
Decommissioning was reported more frequently than in 2021, with workspaces and research laboratories the most common space types identified. Respondents expected the trend to continue over the following three years. This is another reason not to interpret the inventory simply as a list of facilities to add: campus planning also involved considering which spaces might be taken out of service. The summary does not provide quantities, specific campuses, or evidence of whether those expectations were later realized.
Which campus facilities did respondents expect to prioritize?
The 2022 responses suggested several priorities, including classrooms, athletic and recreation facilities, computational research laboratories, fabrication and maker spaces, outdoor areas, and student wellness. These priorities are best understood as reported plans and expectations from that survey, not as a current ranking of construction demand.
Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
- Classrooms: Athletic and recreation facilities rose to the second most frequently planned facility update, behind classrooms. The summary does not specify classroom designs or the scale of planned work.
- Research and making: More than half of respondents said they planned to increase computational research laboratory and fabrication/maker-space facilities. This finding concerns stated plans to increase those facilities; it does not give a square-footage target or confirm completed projects.
- Outdoor space: Respondents also intended greater use of outdoor spaces in the following year. The summary does not identify particular uses, design features, or project budgets.
- Athletics and recreation: These facilities were the second most frequently planned update after classrooms, indicating that they featured prominently in the qualitative responses.
- Student wellness: More than two-fifths of respondents planned to incorporate wellness into student living facilities. At the same time, centralized campus health and wellness facilities appeared less attractive to respondents. This contrast suggests different approaches were being considered, but the summary does not explain why institutions favored one setting over another.
These categories can overlap in a real facilities plan. For example, an institution may consider student experience, research needs, and the condition of existing buildings together. The CFI summary establishes the reported themes, not a prescribed sequence for projects or a one-size-fits-all campus program. It also does not provide detailed project specifications, budgets, or completion dates from which to infer a construction pipeline.
What did the survey say about where faculty and staff would work?
Respondents expected 80 percent of faculty and staff to work either fully on campus or on campus three to four days per week. This was an expectation reported in the 2022 CFI, not a later measurement of actual attendance or a current workforce forecast.
Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Scan for outdated or missing drivers - takes under a minute3Clear out junk files and repair common Windows errorsThat distinction matters when using the figure to plan offices. It indicates that respondents anticipated substantial on-campus presence, but the summary does not break the 80 percent into the two attendance patterns, identify how many people were included, or report actual space utilization. It therefore cannot be translated directly into a desk count or a recommended office footprint. For campus-level decisions, the useful next step is to compare the institution’s own occupancy and scheduling information with the relevant peer group rather than treating the survey expectation as a design ratio.
How should planners use the CFI findings?
Use the 2022 findings as a historical peer benchmark and a prompt for questions, not as a forecast or a mandate. The survey can help frame discussions about existing space, changing room uses, and stated institutional priorities, while local data should determine whether a particular campus needs a renovation, a new facility, or a different operating plan.
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
- Start with the right comparison group. Keep institution type, location, and in-person student headcount in view. The average for small private four-year institutions is not automatically an appropriate target for a large public or differently situated campus.
- Separate space-use data from plans. The reported square-footage figures describe space per in-person student. Statements about adaptation, decommissioning, or planned facilities describe qualitative intentions. Do not combine them as if they measure the same thing.
- Distinguish planned work from completed work. The 84 percent adaptive-reuse figure records plans reported in 2022, not completed projects. Likewise, respondents’ three-year expectations for decommissioning do not confirm what later happened.
- Test the benchmark against campus conditions. The summary does not provide building condition, utilization, cost, or project-level data. Those are necessary inputs for deciding whether to renovate, repurpose, replace, or add space at a specific institution.
- Use the later report for later comparisons. SCUP identifies the 2023 report as the final CFI benchmark year. Its report page confirms the scope and availability of the PDF, but detailed 2023 results cannot be inferred from that page or from the 2022 summary.
SCUP and brightspot strategy framed the need for institutional planning this way: “Higher education institutions need to anticipate the trends and movements that will impact them, and develop an integrated planning culture that builds relationships, aligns the institution, and prepares them to change and adapt,” said Wutka and Donnelly, jointly attributed in the Building Design + Construction article. Sadie Wutka also said the pandemic “accelerated changes that were already impacting higher education ‘and launched us into an even more intensely volatile, uncertain, complex, and ambiguous environment.’” Both statements belong to the article’s account of the 2022 CFI context, rather than being fresh findings from the later report.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Are these still the latest college planning trends?
No—the 2022 results are not the newest benchmark identified by SCUP. SCUP subsequently published a 2023 CFI report and says that 2023 was the final benchmark year. That means the 2022 figures should not be presented as the latest available CFI data, and the end of the program means no later CFI benchmark year is identified in the supplied sources.
The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →The public SCUP page confirms that the 2023 report covers current space-use data and recent and planned facility changes, with aggregate comparisons by institution type, location, and student headcount. It does not expose the report’s detailed numerical tables. Consequently, the evidence here supports no claim about whether the 2023 results confirmed, reversed, or changed the direction or scale of any 2022 finding. Readers who need the later figures should consult the report itself rather than assume the 2022 plans came to pass.
Frequently Asked Questions
What does “net aggregate square feet” mean in a campus space comparison?
The 2022 summary reports this measure but does not define its calculation in detail. For a formal comparison, consult the CFI report’s methodology and use the same space categories and denominator across institutions.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
Does the CFI include community colleges or only four-year schools?
The 2022 qualitative respondents were mostly four-year public institutions, while the quantitative responses included 104 U.S. institutions and one Canadian institution. The available summary does not provide a complete breakdown of all participating institution types.
Can the 2022 CFI findings be used to justify a specific campus construction budget?
Not by themselves. The summarized findings do not include project costs, building conditions, or campus-specific utilization data, so a budget case needs local evidence in addition to peer benchmarks.
Where can I find the detailed 2023 CFI numbers?
SCUP’s 2023 report page lists the report as a paid PDF and identifies it as the final benchmark year. The public page provides scope information but not the detailed tables.