Driver FixRecommendedSound, Wi-Fi or graphics acting up? Check drivers firstFind missing or outdated drivers fast.Check DriversBlack Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run Scan×
BETTESWORTHConstruction

What the 3%–16% Commissioning Savings Study Means for Building Owners

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

The 2020 Lawrence Berkeley National Laboratory (LBNL) commissioning study found median primary-energy savings ranging from 3% to 16% across building market segments. Those percentages are medians from project records—not a promise that every property will save 3%, 16%, or anything else. Results varied with building type, whether the work covered an existing or new building, and how the commissioning was delivered.

The analysis covers 1,500 North American buildings representing 34.7 million m² (373 million ft²). It also reports a 1.7-year median simple payback for existing-building commissioning and separates outcomes from utility programs, monitoring-based commissioning (MBCx), and projects outside utility programs. Here is how to use those figures without overstating what the research proves.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What did the commissioning study actually find?

The headline range comes from market-segment medians in the LBNL analysis “Building Commissioning Costs and Savings Across Three Decades and 1,500 North American Buildings”. Lodging projects had the lowest reported median, 3% primary-energy savings, while public order and safety facilities had the highest, 16%.

These are not the minimum and maximum outcomes for individual buildings. A median is the midpoint of the projects in a category: half reported a lower value and half a higher value. A particular property can perform outside that range because its baseline condition, operating schedule, equipment, controls, climate, and project scope differ from the records in the study.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
Building market segment Median primary-energy savings How to interpret it
Lodging 3% Segment median, not a guaranteed hotel result
Public order and safety facilities 16% Segment median, not a guaranteed public-safety result

The study’s “primary energy” measure accounts for energy associated with supplying energy to the building, rather than only the energy recorded at the meter. When presenting the result to a client, identify the metric and the segment instead of shortening the finding to “commissioning saves 3%–16%.”

How large and representative was the LBNL analysis?

The 2020 paper combines records from 1,500 North American buildings totaling 34.7 million m² (373 million ft²) of floor area. The updated analysis added 839 buildings to a prior dataset of 643. That scale makes the results useful as a market benchmark, but it does not turn the work into a controlled experiment.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Projects were drawn from commissioning records collected over roughly three decades. The authors report differences in data quality and market representation, and the 2018 portion of the dataset was sourced through providers affiliated with the Building Commissioning Association. Those factors can influence which building types and project outcomes appear in the sample.

The full Energy and Buildings paper is the best source for the methods, category definitions, and uncertainty behind the summary figures. A trade-press explanation is available from Building Design + Construction, but the journal paper should be used when a contract, business case, or public report depends on an exact number.

Why does the delivery mechanism change the savings result?

For existing buildings, the study reports different medians depending on how commissioning was delivered. Treating all existing-building projects as one population hides an important part of the result.

Existing-building project context Median primary-energy savings What the category means
Commissioning delivered through utility programs 5% Projects recorded within utility-program offerings
Monitoring-based commissioning (MBCx) in utility programs 9% Utility-program work augmented with submetering, diagnostics, and data analytics
Existing-building projects outside utility programs 14% Projects not classified within the utility-program categories

MBCx is described in the paper as a subprocess of existing-building commissioning that uses data-analytics software, submetering, and diagnostics. The higher median in that category should not be read as proof that software alone creates savings. The category may also differ in building selection, project scope, measurement quality, and the problems identified before work began.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

For a proposed project, state the comparison category explicitly: “similar to existing-building utility-program projects,” “similar to MBCx utility projects,” or “similar to projects outside utility programs.” That wording is more defensible than applying the 14% figure to every retrofit.

What is commissioning, according to the study?

Eliot Crowe and coauthors define commissioning as “a systematic process intended to verify and document that new and existing building systems operate according to the building design and the owner’s operating requirements.” The emphasis is on verification and documentation, not simply installing efficient equipment.

For an owner, that process can include translating operating requirements into checkable criteria, reviewing design intent, confirming that systems and controls respond as specified, recording deficiencies, and documenting final operating conditions. In an existing building, it can also expose drift, incorrect schedules, failed sensors, simultaneous heating and cooling, or control sequences that no longer match how the space is used. The exact activities and level of instrumentation should be defined in the commissioning scope.

Commissioning can cover HVAC equipment, air and water distribution, lighting controls, domestic hot water, metering, life-safety interfaces, and building-automation sequences when those systems are included in the owner’s requirements. The LBNL figures do not imply that every project covered every system; scope is one reason project results differ.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How much does commissioning cost?

In the 2018 sample, the median cost for existing-building commissioning was $2.85/m² ($0.26/ft²). New-construction commissioning had a median cost of $8.78/m² ($0.82/ft²). The paper reports that the new-construction figure was almost 50% lower than the comparable 2009 sample.

These are reported project-cost medians, not fee schedules. A small, complex facility can have a higher unit cost than a large, standardized building because fixed activities are spread over fewer square metres. Scope, travel, controls integration, metering, documentation requirements, and the condition of the equipment can all affect a proposal. Use the figures as an order-of-magnitude benchmark and request a scope-linked fee rather than treating them as a guaranteed price.

Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
Project type 2018 median cost Unit conversion
Existing-building commissioning $2.85/m² $0.26/ft²
New-construction commissioning $8.78/m² $0.82/ft²

Prices checked November 2026.

Costs are from the LBNL 2020 analysis and refer to its 2018 sample.

What payback did the study report?

Existing-building commissioning had a 1.7-year median simple payback. The middle 50% of reported projects fell between 0.8 and 3.5 years (the 25th–75th percentile range). “Simple payback” divides the project cost by annual energy-cost savings; it does not account for financing, discount rates, maintenance savings, avoided replacement, incentives, or changes in energy prices.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The payback range is more useful for screening than the median alone. A project near the 3.5-year percentile may still be attractive if it reduces comfort complaints or protects equipment, while a project with a very short calculated payback may require assumptions that are difficult to verify. Ask for the baseline period, energy-price assumptions, incentive treatment, and whether non-energy benefits were excluded.

What does the evidence say about new-construction savings?

The 2018 sample did not contain enough usable new-construction savings data to calculate a new median. The often-cited 13% median energy savings and 4.2-year simple payback come from the earlier 2009 dataset cited by the authors, not from a new 2018 finding.

That distinction matters because new-construction commissioning is intended to prevent defects and confirm that the completed building meets its design and owner requirements. A project may avoid future waste without producing a clean before-and-after energy comparison. Do not label 13% as the current new-construction result, and do not combine it with the 2018 existing-building figures as if they were collected under the same conditions.

How should an owner apply the 3%–16% benchmark?

Use the study to frame a range of scenarios, then replace the broad benchmark with building-specific evidence. A practical decision process is:

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
  1. Classify the project. Identify the building segment, floor area, climate, operating hours, and whether the work is for an existing or new building.
  2. Identify the delivery context. Determine whether a utility program, MBCx approach, or independent project is the closest match. Confirm eligibility and measurement rules with the program administrator when incentives are involved.
  3. Define the baseline. Gather utility bills, interval data where available, equipment inventories, control trends, schedules, and maintenance records. Record major occupancy or operational changes that could distort a before-and-after comparison.
  4. Write measurable owner requirements. Specify comfort ranges, schedules, sequences, alarms, metering, documentation, and who will operate the systems after handover.
  5. Separate savings cases. Present a conservative case, a central case, and an upside case. Label each as an estimate informed by the LBNL medians rather than a guaranteed outcome.
  6. Plan verification. Decide which meters, trend logs, functional tests, and follow-up reviews will demonstrate that corrective actions persisted after the commissioning team left.

This approach prevents a common error: multiplying a building’s energy use by 16% and presenting the result as a quotation from the study. The research supports a benchmark conversation, not a property-specific guarantee.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What factors can move a project above or below the median?

Building segment and operating pattern: Lodging, offices, schools, healthcare facilities, and public-safety buildings use systems differently. A 24-hour facility may have more hours in which scheduling and control corrections can matter, while a lightly occupied building may have fewer opportunities.

Starting condition: Commissioning finds more correctable waste when systems have drifted from design intent or operating requirements. A recently tuned building may have less immediate energy opportunity, even though verification can still reduce operational risk.

Scope and data: Projects with reliable submetering, trend data, and diagnostics can identify problems that a short visual inspection will miss. Conversely, incomplete records or inaccessible controls can limit both corrective work and the confidence of the savings estimate.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Implementation: A documented recommendation does not save energy until someone changes the sequence, repairs the sensor, adjusts the schedule, or trains operators—and the change remains in place. Assign responsibility and a closeout date for every deficiency.

Market representation: Because the LBNL dataset comes from available project records and has uneven data quality, its medians should not be treated as statistically identical to every regional building stock.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

How can project teams report the result responsibly?

Use a citation that includes the study year, project type, delivery mechanism, metric, and sample context. For example: “The 2020 LBNL analysis found a 5% median primary-energy saving for existing-building commissioning delivered through utility programs; the figure is a cross-project median, not a guarantee for this facility.”

Keep the following distinctions visible in proposals and board papers:

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • Median versus expected result for one property.
  • Primary-energy savings versus a specific utility-bill reduction.
  • Existing-building figures versus new-construction figures.
  • 2018 cost data versus the earlier 2009 new-construction savings dataset.
  • Simple payback versus a full life-cycle financial analysis.

When a client asks for one number, provide the closest category match and show the assumptions that could move the estimate. That is more useful—and more faithful to the evidence—than repeating the headline without its qualifiers.

What is the practical takeaway for construction and facilities teams?

Commissioning is a verification process that can produce measurable energy savings, but its value is not limited to a single percentage. The LBNL study’s strongest practical message is that context matters: savings differ by building segment and delivery mechanism, costs differ between existing and new construction, and the quality of project data limits what can be concluded.

For existing buildings, the reported 1.7-year median simple payback and $2.85/m² median cost provide a credible screening reference, while the 5%, 9%, and 14% savings medians help teams choose a comparison group. For new construction, use the $8.78/m² cost benchmark cautiously and identify the 13% savings and 4.2-year payback as results from the earlier 2009 dataset only. In every case, define the owner’s requirements, document the baseline, verify corrective actions, and report uncertainty alongside the estimate.

Frequently Asked Questions

Does a commissioning project guarantee a reduction on the utility bill?

No. The study reports primary-energy medians across project records, while a utility bill is affected by tariffs, weather, occupancy, and operational changes. A project-specific measurement plan is needed to connect commissioning actions with the bills a particular owner receives.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Should commissioning be repeated after the building is occupied?

It can be useful to schedule a seasonal or post-occupancy review because controls, schedules, and operator practices often change after handover. The LBNL headline percentages do not prescribe a follow-up interval, so the owner should set one in the commissioning plan.

What information should I request before accepting a savings estimate?

Request the baseline period, floor area, building segment, project scope, delivery category, energy metric, and treatment of incentives and operational changes. Also ask whether the estimate is a median benchmark, a modeled projection, or a measured result for the property.

Are commissioning costs eligible for utility incentives?

Eligibility depends on the specific utility program, jurisdiction, and program rules. The LBNL study separates utility-program projects from work outside those programs, but it does not establish current incentive availability for any particular building.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.
Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.