Data centre construction costs have no single all-in price: the total depends on location, capacity, design, and what the estimate includes. JLL Research’s 2026 outlook puts the global average shell-and-core benchmark at $10.7 million per MW for 2025 and forecasts $11.3 million per MW for 2026. Those figures exclude land acquisition and active IT equipment; tenant AI technology fit-out can cost as much as $25 million per MW. Treat the headline rate as a scoped construction benchmark, not the price of a fully equipped, operating facility.
What does a data centre construction cost per MW include?
A cost per megawatt (MW) figure is useful only when its scope and capacity basis are clear. JLL’s headline figures describe shell-and-core construction: the building and its core facility infrastructure, rather than the land purchase or the servers, GPUs and networking equipment that make it an operating data centre. Its 2026 outlook describes a single-tenant, 50 MW, air-cooled facility as its example, but the global average benchmark should not be mistaken for a quote for every 50 MW project.
As an Amazon Associate I earn from qualifying purchases.
Recommended Free Tools
The boundary matters because two estimates labelled “data centre cost” may describe different things. One may be a powered shell; another may include mechanical, electrical and plumbing (MEP) systems, tenant fit-out or active IT. Unless those boundaries are aligned, comparing their cost per MW can produce a misleading conclusion.
JLL reports global shell-and-core construction costs of $7.7 million per MW in 2020 and $10.7 million per MW in 2025, a reported compound annual growth rate (CAGR) of 7% over that period. It forecasts $11.3 million per MW for 2026. The 2026 figure is a forecast, not an observed final cost for every project or market.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
| Benchmark | Reported cost | Geography and scope |
|---|---|---|
| 2020 | $7.7 million per MW | JLL global average; shell and core |
| 2025 | $10.7 million per MW | JLL global average; shell and core |
| 2026 forecast | $11.3 million per MW | JLL global average; shell and core |
| 2023 | $8.8 million per MW | Currie & Brown US construction benchmark series |
| 2024 predicted | $9.2 million per MW | Currie & Brown US construction benchmark series |
Benchmark figures checked November 2026. JLL’s global series and Currie & Brown’s US series use different geographies and should not be treated as directly interchangeable. Currie & Brown labels its 2024 figure as predicted.
For scale, multiplying JLL’s 2025 global average by 50 MW gives $535 million; applying its 2026 forecast to the same capacity gives $565 million. These are arithmetic illustrations of the published shell-and-core rates, not project budgets. They do not add land, active IT or any other scope not established by the benchmark.
Why is land not part of the headline price?
Land acquisition is explicitly excluded from JLL’s shell-and-core figure, and JLL’s cited outlook does not establish a comparable land cost per MW. The parcel, local market and site requirements differ, so adding an assumed standard land allowance would create false precision.
Keep land visible as its own line in a project budget. Record the site or market, the basis of the land estimate and whether it includes related site work. Do not combine a land-inclusive project estimate with JLL’s shell-and-core rate and describe the result as a like-for-like comparison.
Site selection also has consequences for the rest of the estimate. JLL says, “Speed to power is the primary criteria driving site selection, followed by community support, latency and proximity to customers.” In other words, a parcel’s suitability is not just a land-price question: power access, community support and proximity to customers can shape the decision. The quotation is from JLL Research’s 2026 Global Data Center Outlook.
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
What power costs should an estimate show?
Power-related scope should be identified rather than hidden inside a generic construction figure. Facility electrical systems named in the New York State Energy Research and Development Authority’s (NYSERDA) report include switchgear, generators, uninterruptible power supply (UPS) equipment and power distribution. But the NYSERDA report does not provide a consistent cost share for utility interconnection, substations or on-site generation, or a common definition of whether those items sit inside a construction benchmark.
Free tools Windows power users keep installed
One-click scans. No signup required.
Ask the estimator to state whether the figure includes utility connection, off-site power works, a substation, on-site generation and the facility’s electrical systems. A project estimate may define those boundaries differently from a benchmark, so list each item as included, excluded, owner-supplied or not yet priced. “Power included” is too vague to make two estimates comparable.
The NYSERDA report exhibit also identifies cooling towers, chillers and computer-room air handlers (CRAHs) among facility systems. It is useful for seeing the types of equipment involved, but it does not establish a universal percentage of total cost for either power or cooling.
How do cooling and rack density affect construction costs?
Cooling design and the amount of computing capacity packed into a facility affect cost, but JLL’s cited outlook does not support one general-purpose allowance for every project. JLL reports a 10% construction cost premium for liquid-cooled facilities in its stated comparison. That figure applies to that comparison; it is not a rule that can be added to any data centre estimate.
Turner & Townsend’s 2026–27 index overview names higher rack density, liquid cooling and accelerated schedules as primary cost drivers. Currie & Brown also identifies location, how much computing capacity fits in the building and whether the owner or contractor supplies MEP equipment as factors in construction cost. Together, these findings explain why two facilities with the same stated MW capacity may not have the same construction price.
Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
For a useful estimate comparison, record whether each design is air- or liquid-cooled, its stated rack-density assumptions and its delivery schedule. Do not infer a project’s precise cooling cost from the 10% premium, or treat cooling equipment as the only difference between two designs: the benchmark does not offer a complete, transferable cooling breakdown.
How much can tenant fit-out and IT equipment add?
Tenant technology fit-out is a separate, potentially substantial budget from shell and core. JLL says tenants are typically responsible for technology fit-out and that AI infrastructure fit-out can cost as much as $25 million per MW. The cited benchmark excludes active IT equipment, so it should not be presented as the cost of servers, GPUs and networking plus the building.
At 50 MW, the arithmetic equivalent of “as much as $25 million per MW” is up to $1.25 billion for AI technology fit-out. This is an illustration of JLL’s stated upper figure, not a typical project price or a guaranteed allowance. It should not be assumed that every facility needs AI fit-out at that level.
Keep the building and tenant technology in separate budget sections. State whether a proposed figure covers a powered shell, shell and core, a fitted facility or active IT. If an estimate combines construction and technology, show the component totals and their respective scope so a reader can see what is actually being compared.
How should you compare two data centre estimates?
Compare estimates only after aligning their date, geography, design, capacity basis and scope. The following checklist captures the main variables identified by JLL, Turner & Townsend and Currie & Brown.
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
| Comparison axis | What to align or disclose |
|---|---|
| Geography and date | Same market and cost year; label actual, predicted and forecast figures accurately. |
| Capacity | Same MW basis and facility size; identify IT load or another capacity definition if the source specifies one. |
| Design | Air or liquid cooling, rack density and delivery schedule. |
| Project scope | Land, site works, utility connection, shell and core, MEP, fit-out and active IT equipment. |
| Procurement | Whether electrical and mechanical equipment is owner-supplied or contractor-supplied. |
| Building efficiency | How much computing capacity the design fits into its floor area. |
Use a simple scope register alongside the headline cost per MW. For each category, mark the amount and basis if known, whether it is included or excluded, and who supplies it. If the source does not quantify a category consistently—such as grid connection or land—keep the uncertainty explicit rather than dividing an unsupported allowance across the project.
Then compare rates only within the same scope. The Currie & Brown figures are a US series, while JLL’s cited figures are global averages. Their different years and geographies alone mean the amounts are context, not evidence that one source is cheaper or more accurate. Turner & Townsend’s index covers 62 markets and is based on a typical 60 MW design; its indicative cost-per-watt and index values need to be checked for the relevant local market and scope before use.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What should a construction budget say when costs are still uncertain?
Separate what is supported by a benchmark from what remains site-specific. A benchmark can provide an early reference point, but it does not price every parcel, utility connection, cooling design or procurement arrangement. Currie & Brown describes its US benchmark as a rough-order-of-magnitude starting point and notes that customized benchmarking analysis is available.
Quick wins for a faster PC:
Scan for outdated or missing drivers - takes under a minuteDriver Scan →Clear out junk files and repair common Windows errorsFree Scan →A clear early-stage estimate can state: the source and cost year; location and capacity basis; whether the figure is a forecast or a reported/predicted benchmark; the assumed cooling design and schedule; whether land, site work and utility infrastructure are included; the boundary between building MEP and tenant fit-out; and any equipment supplied directly by the owner. If a category cannot be priced on the available evidence, identify it as a separate unresolved line rather than imply it is covered by the per-MW rate.
This approach does not produce a universal total, because the cited JLL, NYSERDA, Turner & Townsend and Currie & Brown sources do not provide a harmonized allocation among land, power, cooling and fit-out. It does make a budget more useful: readers can see what a benchmark means, which project decisions may change the cost, and what must be priced separately before a total is meaningful.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
Frequently Asked Questions
What does MW mean in a data centre cost estimate?
MW means megawatt, a measure of power capacity. The estimate should state what capacity the figure uses; do not assume that every source means the same thing by MW or that a facility’s IT load and other capacity measures are interchangeable.
Can I use a global cost-per-MW figure to budget a specific site?
Use it as context, not as a site quotation. The global benchmark does not establish the specific parcel, local utility works, procurement boundaries or design needed to price a particular project.
Outdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchPC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11Why do AI data centres have different cost estimates?
AI infrastructure may require tenant technology fit-out that is excluded from shell-and-core construction figures. JLL’s stated upper fit-out cost is specific to AI infrastructure, so it should not be treated as a universal premium for every AI facility.
Does the published construction benchmark include servers and GPUs?
JLL’s shell-and-core benchmark excludes active IT equipment. A reader should look for a separate tenant technology or IT line before treating an estimate as the cost of an equipped facility.