Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversBlack Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
BETTESWORTHConstruction

Waterproofing Details for Paver Pedestals on Sloped Decks

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Waterproofing beneath paver pedestals is a coordinated roof- or plaza-deck assembly, not a pedestal-only detail. Adjustable supports can keep pavers level while the deck slopes to drains, but the membrane, protection layer, drainage path, edge flashing and paver layout must be designed together. At walls, parapets and curbs, preserve the required joint and a deliberate separation from flashing; under every pedestal, use the protection course or bearing pad approved for the membrane system. The exact build-up, adjustment range and load limits come from the project documents and the selected manufacturers’ instructions.

What problem do paver pedestals solve on a waterproofed deck?

A sloped deck is necessary for drainage, yet occupants expect a flat, walkable paver surface. Adjustable pedestals bridge those two requirements: each support is raised or lowered to compensate for the substrate elevation at its location, while the paver tops remain on a common plane. The result is a level wearing course over a deck that still falls toward drains.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The adjustment is not a license to ignore the deck’s geometry. Survey the actual high and low points, locate drains and penetrations, and verify that the selected pedestal can reach every design elevation. The Building Enclosure detail reports that most paver manufacturers offer systems with more than 2 inches of height adjustment, but that is a general observation rather than a specification for every product. Confirm the model’s adjustment range, accessories and approved slope with its current technical data.

Minor corrections may require shims. Use only shims and locking components approved for the pedestal system; improvised packing can tilt a support, concentrate load or create a sharp edge against the waterproofing.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

What layers belong under pedestal-supported pavers?

Think of the assembly from the structure upward. A typical detail may include:

  1. Structural deck: The slab or sheathing provides the designed falls, strength and attachment points for perimeter work. It must be clean, sound and within the tolerances stated by the waterproofing specification.
  2. Waterproofing membrane: This is the continuous water-control layer, turned up and terminated at walls, parapets, curbs, drains and penetrations according to its manufacturer’s details.
  3. Drainage or protection layer: A protection mat, drainage board, protection fabric or other approved layer separates traffic and point loads from the membrane while allowing water to move to outlets. The layer is selected for the membrane and the assembly, not substituted casually.
  4. Insulation where specified: Some plaza assemblies place rigid insulation below the supports. The Versico plaza guide, for example, describes configurations using drainage board or EPS insulation depending on deck slope and the chosen build-up. Insulation must have the compressive properties and thickness required by the design.
  5. Adjustable pedestals and accessories: Supports, heads, bases, shims and restraints establish the paver plane and transfer dead and anticipated live loads through the approved protection system.
  6. Pavers: The removable wearing course is laid in the specified pattern with open joints, perimeter clearances and any required restraints.

Because these layers interact, changing one can invalidate another. A thicker paver changes finished elevation; a different insulation board changes compression and drainage; a new membrane may require a different bearing pad. Coordinate the complete assembly in the drawings and submittals before installation.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How do you protect a waterproofing membrane from pedestal feet?

Do not assume that a pedestal base can sit directly on any membrane. In the self-adhering sheet waterproofing construction guidance cited by SYNC, supports bear on the specified protection course or on a bearing pad published as compatible by the membrane manufacturer, rather than directly on the sheet. The Roofing Contractors Association of BC (RCABC) likewise describes non-abrasive supports or proprietary pads that provide separation and leveling. These are system instructions, not a universal permission to place any plastic base on any membrane.

Obtain the membrane manufacturer’s written requirements for:

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
  • the approved protection board, mat or fabric and its thickness;
  • the approved bearing-pad material and dimensions;
  • chemical compatibility with membrane, adhesive and insulation;
  • maximum point load, allowable compression and required load distribution;
  • cleaning, priming and inspection before covering the membrane.

Keep the protection layer continuous where the specification requires it. Remove grit, fasteners and sharp debris that could puncture the membrane or abrade a protection sheet. If a pad is needed under a base, use the specified product and install it flat; stacking random scraps or cutting a pad so that its edge becomes a knife point defeats the separation detail.

How should drainage and airflow work below the pavers?

Open-jointed pavers let rain reach the drainage layer, where it must travel to outlets without being blocked by supports, insulation edges or perimeter sealants. RCABC guidance calls for supports that do not impede air or water flow and that distribute the paver dead load and predicted live loads uniformly. Maintain the designed channels, outlet strainers and overflow routes; do not fill the under-paver void with mortar, foam or debris.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Pedestal height creates a ventilated cavity, but airflow is not a substitute for positive drainage. Confirm that low points, scuppers and drains remain accessible for cleaning. Where a drainage board or fabric has a direction of installation, follow it so laps and channels remain open. Protect exposed membranes during construction and remove temporary coverings before the paver course is closed.

The RCABC technical guidance states a minimum paver spacing of 3 mm (1/8 inch) and a minimum vertical separation of 12.5 mm (1/2 inch) for the accessible wearing-course condition it describes. Treat those dimensions as guidance for that context; the project specification, paver manufacturer and local code may require different joint or clearance values.

Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

How do you detail pavers at a wall, parapet or curb?

At a vertical transition, the edge must keep water moving, protect flashing and allow the paver field to move without abrading the wall assembly. The Building Enclosure detail keeps the transverse spacer lugs intact at the termination so the joint space continues to the edge. Do not clip lugs merely to push a paver against a wall unless the approved detail specifically calls for it.

Versico’s plaza guide also advises leaving a reasonable gap between the first paver row and wall flashing to reduce the chance that paver movement will puncture the flashing. The actual width, edge restraint, counterflashing and sealant belong to the project detail. A generic gap cannot replace the flashing designer’s termination.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Coordinate these items in an enlarged edge drawing:

  • membrane turn-up height and termination bar or adhesive;
  • base flashing, counterflashing and coping geometry;
  • paver joint continuation and spacer-lug treatment;
  • pedestal setback, edge clips or perimeter restraint;
  • drainage path at the wall and any weep or scupper opening;
  • movement joint location and the clearance needed to remove pavers.

At curbs and penetrations, maintain the same principles: no sharp contact, no blocked drainage and no unverified load on the flashing. If a paver must be cut, support the resulting piece as shown in the approved layout rather than leaving a small unstable fragment at the perimeter.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

What is a reliable installation sequence?

Before work starts, the installer needs the approved waterproofing and pedestal drawings, current product instructions, a verified deck survey, compatible protection materials, layout dimensions, drain locations and a plan for protecting completed work. Resolve discrepancies in writing; do not solve an elevation conflict by forcing a pedestal beyond its published range.

  1. Inspect the substrate. Check slope, high and low points, cracks, depressions, penetrations and edge elevations. Confirm that falls lead to functioning drains and that the deck is ready for the membrane trade.
  2. Install and inspect the waterproofing. Complete membrane laps, corners, upstands, drains and penetrations. Perform the inspections or tests required by the specification before covering the work.
  3. Place the specified protection and drainage layers. Install mats, boards, fabrics or insulation in the approved orientation, with laps and terminations that do not dam water. Keep contaminants out of drains.
  4. Set out the paver grid. Mark paver intersections, perimeter clearances, movement joints and access panels. The Versico guide places pedestals at paver intersection points and uses shims where necessary for stability and level.
  5. Install approved pads and pedestals. Position each base on the specified bearing surface. Keep bases flat, aligned and within the manufacturer’s spacing and load limits.
  6. Establish the reference elevation. Start at a control line or drain-related benchmark. Adjust supports so the paver tops form the required plane while the bases follow the changing substrate height.
  7. Check the field continuously. Use a straightedge or approved laser setup to verify level, joint width, rocking and transitions. Lock or secure adjustment components as directed; add only approved shims.
  8. Lay pavers and complete edges. Preserve spacer lugs and the specified wall gap. Install edge restraints, clips and cut pieces exactly as detailed, without drilling or fastening through the membrane unless the waterproofing design permits it.
  9. Keep access points identifiable. Record removable panels, drain locations and pedestal heights so future inspections can reach the membrane without dismantling an entire field.

Which technical criteria should be compared before selecting a system?

No single pedestal or membrane assembly is universally best. Compare the complete system against the project’s loads, elevations, pavers and warranty conditions.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Criterion Questions to answer in submittals
Height adjustment What is the published minimum and maximum height, and can it cover surveyed elevations without unstable extensions?
Paver compatibility Are the head, lug pattern and base sized for the paver thickness, dimensions, pattern and cut pieces?
Load performance What dead and predicted live loads are allowed, and how are point loads distributed through pads, insulation and the deck?
Membrane protection Which protection course or bearing pad is approved, and has chemical and physical compatibility been documented?
Drainage and airflow Will bases, pads, insulation edges and perimeter restraints leave the designed water and air paths open?
Edges and movement How are walls, parapets, curbs, drains, movement joints and wind or seismic restraints detailed?
Maintenance access Can pavers be removed safely, and are drains, expansion joints and membrane inspection zones reachable?
Compliance Do the proposed products match the drawings, specifications, local requirements and membrane warranty?

The ARCAT pedestal-paver specification is one example of the kind of installation information to review, but its provisions apply to the specified system. Use it as a submittal reference, not as a substitute for the project’s design.

What common failures occur, and how can they be prevented?

Failure mode Likely cause Prevention or correction
Uneven paver plane Pedestals were set to a nominal height instead of surveyed elevations. Re-establish control lines, adjust each support within its range and use approved shims for minor corrections.
Membrane abrasion or puncture Bases sat directly on an incompatible sheet, or grit remained below a pad. Stop work, inspect the membrane and install the specified protection or bearing pad before resetting supports.
Standing water Drainage channels were blocked by debris, insulation edges or sealant. Open the flow path, clean outlets and verify the drainage layer and perimeter details.
Cracked or rocking pavers Uneven support, excessive cut pieces or loads beyond the system’s rating. Check spacing, head seating, paver condition and load data; replace damaged pieces and correct support geometry.
Flashing damage Pavers were tight to the wall or edge movement was restrained incorrectly. Restore the designed clearance, retain the joint space and repair flashing under the waterproofing designer’s direction.
Lost maintenance access No removable-panel plan or record of pedestal layout was created. Mark access zones, photograph concealed work and maintain an as-built pedestal and drain map.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How is the finished assembly inspected and maintained?

After installation, walk the surface for rocking, lippage, inconsistent joints and blocked perimeter gaps. Confirm that drain covers can be reached and that no paver, clip or restraint bears on flashing. Check representative pedestal locations for secure adjustment and intact pads where the specification calls for verification.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

Maintenance should include removing leaves and sediment from joints and drains, checking movement joints and perimeter clearances, and lifting designated pavers to inspect the drainage and membrane zones. Replace a damaged paver with the same approved thickness and support arrangement; do not bridge a missing support with loose debris. Any leak investigation should begin with the waterproofing designer’s diagnostic plan, because water can travel laterally within protection and drainage layers.

How should the detail be documented for approval?

Submit a coordinated plan and enlarged sections showing substrate elevations, membrane terminations, protection layers, insulation, pedestal locations, paver joints, edge restraints, drains, movement joints and access panels. Include product data for the membrane, protection materials, pedestals, pads, shims and pavers, plus load and compatibility statements. The sources emphasize that manufacturer instructions and project specifications govern the actual assembly; obtain written acceptance where a proposed substitution changes a contact material, thickness or drainage path.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Keep the approved drawings, inspection records, photographs before covering and an as-built layout with the building owner. This record makes future paver removal safer and helps distinguish a membrane problem from a blocked drain or displaced support.

Frequently Asked Questions

Can adjustable pedestals be used on any sloped roof deck?

They can accommodate a designed change in substrate elevation only when the selected system’s height range, base geometry and load rating cover the surveyed deck. Verify the slope, insulation compression, wind or seismic requirements and membrane warranty before approval; a pedestal cannot correct an out-of-tolerance or structurally deficient deck.

Is a protection mat required under every pedestal base?

The required interface depends on the membrane assembly. Some specifications call for a protection course, while others permit a membrane-manufacturer-published bearing pad; direct contact is allowed only when the membrane manufacturer explicitly approves it. Follow the exact system detail rather than applying a generic pad rule.

How do I remove pavers to inspect a leak?

Use the planned access panel or lift pavers methodically so spacer lugs, clips and pads are not damaged. Mark each piece, keep debris out of open joints and expose only the area needed for the diagnostic plan; record any displaced pedestal before reassembly.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Do pedestal pavers need grout or mortar in the joints?

Pedestal systems normally rely on open, mechanically spaced joints so rain can reach the drainage layer and pavers can be removed. Filling those joints with grout or mortar can block drainage and prevent access unless a specifically engineered system requires it.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
Windows Errors? Fix Them Before They SpreadFree repair scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.