Driver FixRecommendedSound, Wi-Fi or graphics acting up? Check drivers firstFind missing or outdated drivers fast.Check DriversBlack Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
BETTESWORTHConstruction

Protect a Floating Dock From Storm Damage: Remove It or Secure It Safely

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Protecting a floating dock from storm damage and high waves starts with one decision: remove and store it before conditions deteriorate if that can be done safely; otherwise, secure it to a stable, permanent structure using a system suited to the dock and the site. Remove loose gear either way. The manufacturer guidance from AccuDock supports that approach, while Michigan Sea Grant and FEMA explain why anchoring, piles, water levels, waves, current and wind require site-specific judgment.

No generic chain size, tie-down pattern or “storm-proof” promise applies to every dock. A protected installation is one whose removal or securement method follows the dock maker’s instructions, the marina’s storm plan and, where exposure or uncertainty warrants it, a qualified marine engineer or dock professional’s review.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is the safest way to protect a floating dock before a storm?

If the dock can be detached and moved without putting people at risk, removal and secure storage is the most straightforward option identified in the manufacturer guidance. If it must remain afloat, secure it to an approved stable, permanent structure and remove or secure every loose item that could become debris. Do the work while access is safe; never wait until high winds, rising water or dangerous waves are already present.

Preparation choice When it makes sense What it requires Main limitation
Remove and store The dock can be safely disconnected, handled and stored before the storm. Safe access, suitable lifting or handling equipment, a secure storage location and a reinstallation plan. Removal may be impractical for large systems, difficult shore access or short warning times.
Leave in place and secure Removal is not feasible and the dock’s attachment and anchoring system is suitable for the site. Manufacturer-compatible attachment points, a stable permanent structure or engineered anchorage, and review of waves, surge, current, wind and water-level change. Improvised ties can fail, and no arrangement guarantees survival in every storm.

This is a decision framework, not an engineered design. Local rules, marina instructions and the dock manufacturer’s requirements control the final method.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

How do I decide whether to remove the dock or leave it in the water?

Compare feasibility, exposure and system compatibility before the weather becomes dangerous. The choice should be made while people can work safely and while a crane, trailer, hoist or other removal equipment is still available if needed.

  1. Check the forecast and warning time. If a storm is approaching and safe access is already questionable, do not create a rescue problem by attempting a late removal. A marina or dock manager may set an earlier deadline than the weather service because moving equipment takes time.
  2. Read the dock maker’s storm instructions. Identify the approved release points, lifting points, attachment hardware and storage method. Manufacturer advice is specific to its system; do not substitute a generic internet tie-down diagram.
  3. Review the marina or property storm plan. A facility may require removal of ramps, angled walkways, dockboxes or other equipment. The Royal Hamilton Amateur Dinghy Club storm plan, for example, directs its facility to secure marina equipment and dockboxes and to remove ramps and angled walkways to solid ground. That plan is not an automatic rule for another marina, but it shows why local procedures matter.
  4. Assess the site’s exposure. Consider expected wave heights, current, wind, storm surge, high tide, water depth, bottom conditions, shoreline geometry and the amount of water-level rise. Michigan Sea Grant identifies these factors as part of floating-dock anchoring decisions.
  5. Ask whether the attachment can carry the loads. A nearby post, seawall or piling is not automatically adequate. The structure, connection, penetration and freeboard must be appropriate to the dock and the site. When that cannot be established from the manufacturer’s documentation, obtain professional advice.

When in doubt, choose the option that can be completed safely and verified against the manufacturer’s instructions. Do not enter the water or work on an exposed dock during a storm to correct a decision made too late.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What should I do before storm conditions arrive?

Use this sequence as a preparation checklist, adapting it to the dock maker’s instructions and the marina’s requirements.

  1. Set a go/no-go time. Decide when preparation must be complete, based on the storm forecast, safe access, daylight and the time needed to move people and equipment. Preparation should finish before hazardous wind, waves or flooding arrive.
  2. Photograph and document the normal setup. Record connection locations, ramp orientation, cleats, hinges and any removable components. Documentation helps with orderly removal and later inspection, but photographs do not replace a structural assessment.
  3. Remove the dock if feasible. Disconnect it only at the points permitted by the manufacturer, then move it to a location where wind and floodwater cannot carry it into people, buildings, roads or waterways. Support and store sections as directed so they do not deform or overturn.
  4. If it remains afloat, install only the approved securement. Use the dock’s designated attachment points and the anchoring or restraint arrangement specified for that system. If the plan relies on a piling, seawall or other permanent structure, verify that the structure and connection are suitable for the expected loads.
  5. Take off loose equipment. Remove kayaks, paddleboards, canoes, oars, chairs and similar items. AccuDock specifically warns about these items. Store them on land in a secure location, or restrain them in a way the manufacturer and marina approve.
  6. Clear accessories and walkways. Ramps, angled walkways, dockboxes, ladders, carts and marina equipment can become debris or impose additional loads. Follow the facility’s plan for removing or securing them; the Royal Hamilton plan provides a facility-specific example.
  7. Check the route and work area. Keep shore access clear, account for changing water level and stop if wind, lightning, waves or flooding make the task unsafe. Never rely on a person standing on the dock to steady a moving section in dangerous conditions.
  8. Notify the responsible manager. In a shared marina, tell the operator what has been removed, what remains and where equipment is stored. Management may make separate decisions about boats and common infrastructure.

Do not improvise by adding random ropes, chains or anchors after the approved system is installed. An extra restraint can create a new load path or snag hazard unless it has been reviewed for that dock.

How should a floating-dock anchoring system account for high waves and rising water?

Anchoring must be designed for the actual site, not for a generic “hurricane-rated” condition. Michigan Sea Grant says a floating dock needs a secure anchoring system and identifies water levels, water depth, wave heights, current, wind and anchorage points as design considerations.

High water changes the geometry of the system. A dock may rise, move laterally, pitch or surge toward its restraints as tide and storm surge increase. Waves add repeated impact and uplift, while current and wind can push the dock in different directions at the same time. The shoreline or pile that seems immovable in calm water may not provide an adequate connection when the water level, direction of force and freeboard change.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

For exposed sites, ask a qualified marine engineer, dock builder or installer to review:

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
  • the dock’s dimensions, buoyancy, flotation and connection points;
  • water depth, bottom and shoreline conditions;
  • expected tide, surge, wave height, current and wind;
  • the type, diameter, penetration and height of piles or other permanent supports;
  • hardware, cables, chains, hinges or guides and their load paths;
  • clearance and freeboard needed as water rises; and
  • how the system will be removed, released or serviced after the event.

These factors do not produce one universal anchor specification. The appropriate material, dimension and layout depend on the dock and location.

Why does FEMA emphasize professional review of piles and freeboard?

In its discussion of floating docks, FEMA P-2181 treats wind load, storm surge and spring high tide together and calls for review of pile adequacy. The handbook states: “Since most failures occur due to pile failures, a licensed professional should assure that the piles are of adequate diameter, have adequate penetration and are of adequate height to account for the high tide, storm surge, wave heights, and adequate freeboard for the dock.”

That sentence is technical guidance for marina and public-facility design, not a do-it-yourself pile recipe. It does not give a universal diameter, penetration depth or height that can be copied to a private dock. Its practical implication is that a piling must be evaluated as part of the complete system, including the soil or bottom, water-level range, wave action, connection hardware and the dock’s required freeboard.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

If a piling is leaning, loose, corroded, cracked, undersized for the installation or too short to accommodate predicted water levels, do not assume a second rope solves the problem. Have the support and connection assessed before the next severe-weather exposure.

Can I tie a floating dock to any fixed object?

No. The manufacturer’s phrase “secure it to a stable, permanent structure” does not mean every tree, fence, railing, deck, shoreline post or improvised anchor is suitable. The object must be structurally capable of taking the expected loads, and the connection must be compatible with the dock and allow the movement the system is designed to permit.

Confirm the attachment point with the dock maker, installer or a qualified marine professional. A seawall may have unknown condition or inadequate reinforcement; a timber post may pull out; a building connection may transfer flood and wave forces into a structure that was never designed for them. Local permits or marina rules may also restrict where and how a dock can be attached.

Should I use boat-mooring instructions to anchor my dock?

No. Boat-mooring guidance and floating-dock anchoring are different engineering problems. The Philippines Maritime Industry Authority Advisory No. 2022-50 discusses doubling lines and allowing additional length for boats secured to pilings during storm conditions; it does not specify floating-dock anchors.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

Do not convert a boat advisory’s line count, rope size or slack practice into a dock design. Boats and docks have different buoyancy, mass, windage, motion, attachment hardware and allowable movement. Use the dock manufacturer’s system and site-specific professional advice instead.

What loose items should come off a floating dock?

Anything that can blow, float or be torn loose should be removed or secured before the storm. Start with kayaks, paddleboards, canoes, oars and chairs, which AccuDock identifies specifically. Then follow the marina plan for dockboxes, ladders, ramps, angled walkways, carts and other equipment.

Store items where wind and floodwater cannot turn them into debris or carry them into the dock, boats, utilities, buildings or neighboring property. Do not leave gear on a removed dock unless the storage arrangement itself is secure. If an item cannot be removed, ask the marina or dock professional for an approved restraint rather than adding an improvised line.

What if the dock cannot be removed before the storm?

Stop and prioritize personal safety. If the dock must remain, confirm that its permanent attachment and anchoring arrangement is the one approved for the system and site; then clear loose gear and follow the marina’s instructions.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Do not attempt a last-minute adjustment from the water, from a small boat or from a dock that is already moving violently. If the installation is exposed to severe waves, current, surge or large water-level changes and the securement has not been reviewed, contact a qualified marine professional as soon as conditions permit. No responsible source can guarantee that a dock left in place will avoid damage.

How do I inspect a floating dock after a storm?

Wait until wind, waves, lightning, flooding and debris hazards have subsided. Keep people off the dock if it has shifted, is partially submerged, has damaged flotation or has an uncertain connection.

From a safe location, look for visible damage such as displaced sections, bent or separated hardware, cracked frames, damaged flotation, shifted piles, loosened guides, broken ramps and debris lodged against the structure. Check whether the dock has moved from its normal position or is carrying abnormal loads. Do not treat a normal-looking surface as proof that hidden connections or piles are sound.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

The reviewed sources do not establish one universal post-storm inspection or a visual checklist that can declare every dock safe to use. Follow the manufacturer’s maintenance instructions, isolate obvious hazards and have substantial damage or uncertain structural integrity evaluated by a qualified dock professional or engineer before reopening the dock.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

When should I hire a marine engineer or dock specialist?

Professional review is especially important when the dock is exposed to large waves, strong current, storm surge, substantial wind, deep or changing water, public use, complex pile guides or an unknown bottom. It is also warranted after a major shift, broken connection, pile movement, repeated storm damage or any repair that changes the load path.

Give the professional the dock model and drawings if available, dimensions, flotation information, photographs, water-depth and tide information, known wave or current exposure, pile or anchorage details, and the marina’s rules. Ask for a written securement or inspection recommendation that identifies what is approved, what must be replaced and how the system is to be removed or maintained.

What are the most common storm-preparation mistakes?

  • Waiting until the storm is close. Late work exposes people to wind, waves and poor visibility and can make removal impossible.
  • Assuming a heavier rope is an engineered solution. Strength, direction of force, attachment geometry, abrasion, movement and the supporting structure all matter.
  • Using a convenient but unverified anchor. A fence, tree, deck rail or unknown piling may fail or transfer forces into another structure.
  • Leaving recreational gear in place. Kayaks, boards, canoes, oars and chairs can become debris and damage the dock or nearby property.
  • Copying boat-mooring advice. Vessel line practices are not floating-dock anchor specifications.
  • Ignoring rising water and freeboard. A system that works at normal level may bind, overtop or lose effective movement during tide and surge.
  • Declaring the dock safe from a quick visual glance. Hidden pile, guide and connection damage can remain after the surface looks intact.
  • Forgetting local rules. Marina plans may require removal or securement of specific equipment and may control where attachments are permitted.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How should owners plan for the next storm season?

Create a written plan before the forecast becomes urgent. Keep the dock manual, marina contact, engineer or installer details, photographs, hardware list and storage arrangements together. Mark the approved release and attachment points, identify who is responsible for removal, and confirm that lifting equipment and a secure storage area are available.

Review the plan after every storm or near miss. Note what moved, what was damaged, whether access became unsafe sooner than expected and whether water reached a different level than anticipated. Use those observations to request a professional review rather than making unrecorded alterations. The goal is a repeatable, early decision—not a promise that any dock can withstand every event.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

FAQ

What information does an engineer need to assess my floating dock?

Provide the dock model, dimensions, flotation details, connection hardware, pile or anchor information, water depth, tide range and photographs of the shoreline and supports. Explain the site’s exposure to waves, current, wind and storm surge, plus any marina requirements or past damage.

Can I reinstall a dock immediately after the storm passes?

Only after safe access is restored and the dock, supports, connections and storage area have been checked. If anything shifted, bent, cracked or separated—or if you cannot verify the anchorage—obtain a qualified inspection before putting people back on it.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

Does removing the dock eliminate all storm risk?

No. Stored sections, ramps, dockboxes and loose accessories can still become wind or flood debris if they are not secured. The storage location must be protected from movement and must not obstruct evacuation routes or harm neighboring property.

Who decides whether a marina-wide dock system should be moved?

That authority normally rests with the marina operator or the party identified in the facility’s storm plan. Individual owners should follow those instructions and coordinate before moving shared equipment or attaching anything to common structures.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Is there a universal “hurricane-proof” anchor kit for floating docks?

The cited guidance does not identify one. Materials, dimensions and layout must match the dock, water depth, bottom conditions, exposure, permanent supports and manufacturer or engineer specifications; a retail kit should not be treated as a universal design.

Frequently Asked Questions

What information does an engineer need to assess my floating dock?

Provide the dock model, dimensions, flotation details, connection hardware, pile or anchor information, water depth, tide range and photographs of the shoreline and supports. Explain the site’s exposure to waves, current, wind and storm surge, plus any marina requirements or past damage.

Can I reinstall a dock immediately after the storm passes?

Only after safe access is restored and the dock, supports, connections and storage area have been checked. If anything shifted, bent, cracked or separated—or if you cannot verify the anchorage—obtain a qualified inspection before putting people back on it.

Does removing the dock eliminate all storm risk?

No. Stored sections, ramps, dockboxes and loose accessories can still become wind or flood debris if they are not secured. The storage location must be protected from movement and must not obstruct evacuation routes or harm neighboring property.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Who decides whether a marina-wide dock system should be moved?

That authority normally rests with the marina operator or the party identified in the facility’s storm plan. Individual owners should follow those instructions and coordinate before moving shared equipment or attaching anything to common structures.

Is there a universal “hurricane-proof” anchor kit for floating docks?

The cited guidance does not identify one. Materials, dimensions and layout must match the dock, water depth, bottom conditions, exposure, permanent supports and manufacturer or engineer specifications; a retail kit should not be treated as a universal design.

The Bottom Line

Remove a floating dock and store it securely when that is feasible and safe. If it must stay afloat, use a manufacturer-compatible, site-appropriate securement system, remove loose gear and obtain professional review for exposed or uncertain installations. Prepare early; never work on a moving dock or in dangerous weather.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.