Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Scan for outdated or missing drivers - takes under a minute3Clear out junk files and repair common Windows errorsA building permit application for a proposed home at 118 Old Kings Highway was received by New Canaan’s Building Department on September 18, 2026, according to a report published by NewCanaanite. The reported plans describe a 5,398-square-foot house with five bedrooms and a two-bay garage. The application’s receipt does not confirm that the project has been approved or that a permit has been issued.
What the application proposes
NewCanaanite reported on October 5, 2026, that the application describes a 5,398-square-foot home with this layout and features:
- Five bedrooms
- Six full bathrooms and one half-bath
- One fireplace
- A finished attic and finished basement
- A two-bay garage
These are details reported from the application, not confirmation that the final, approved plans will be identical.
Estimated construction cost and project firms
The application lists an estimated build cost of $950,000, according to the NewCanaanite report. That is an estimate stated in the application, not a confirmed final price or contract amount. The report identifies Hybrid Construction Partners LLC of Stamford as contractor and North Arrow Design & Contracting LLC of Stratford as architect.
Quick wins for a faster PC:
Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Repair Windows errors before they cause bigger problemsFix Now →#1 Best Overall
What is known about the project’s status
The available report establishes that the Building Department received an application on September 18, 2026. It does not establish whether the application was approved, whether a building permit was issued, or when construction might start or finish. An application’s receipt is an initial filing milestone, not evidence that construction is authorized or underway.
The report also does not provide detailed submitted plans or establish potential site, zoning, or neighborhood impacts. Those questions would require the permit file or subsequent reporting. The project details above are attributed to the application as summarized by NewCanaanite’s October 5, 2026 report by Michael Dinan.
Quick Recap
Rank #4
Rank #3
Rank #2
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.




