Quick wins for a faster PC:
Clear out junk files and repair common Windows errorsFree Scan →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Construction is beginning on the publicly funded South Jersey Broadband project serving Cumberland and Salem counties, New Jersey. The first awarded phase, called Priority Middle Mile, is scheduled to install more than 50 miles of fiber in Salem County. Millennium Communications Group LLC is the contractor, and the Cumberland County Improvement Authority is serving as construction manager for Salem County.
What is being built
The project combines federally supported middle-mile and last-mile infrastructure. Middle-mile fiber forms the high-capacity backbone between communities and network facilities; last-mile connections can then extend from that backbone toward homes, businesses and institutions. The stated goal is to improve rural and underserved connectivity rather than to announce immediate retail service at every address.
As an Amazon Associate I earn from qualifying purchases.
The National Telecommunications and Information Administration (NTIA) grant announced by U.S. senators Cory Booker and Bob Menendez on June 16, 2023, was $24.18 million. That announcement described a planned network of 220 route miles of fiber across Cumberland and Salem counties.
The Cumberland County Improvement Authority’s October 2, 2026, newsletter describes the currently awarded Priority Middle Mile work as more than 50 miles of fiber. Those figures describe different layers of the project: the 220-route-mile figure is the scope cited in the 2023 grant announcement, while the more-than-50-mile figure applies to the awarded phase reported in October 2026.
Popular on Amazon
- Pet-Proof Armored Cable for Everyday Reliability — Designed with a stainless steel armored tube and LSZH jacket, this SC/APC to SC/APC single mode cable resists crushing, bending, and even pet chewing. Perfect for homes with active pets, tight conduits, or wall pass-throughs where standard fiber easily fails.
- Stable OS2 Performance for Smooth Home Internet — Using G657A1 or G657A2 bend-insensitive fiber, this single mode OS2 jumper delivers stronger FTTH stability in tight bends and corners, with low insertion loss and excellent return loss for streaming, gaming, remote work and smart-home devices.
- FTTH-Friendly for Clean Home Network Upgrades — Ideal for relocating fiber equipment from the basement to the living room, improving Wi-Fi coverage, or extending a fiber run through a weak-signal area. Supports Verizon Fios, AT&T BGW320 All‑Fi Hub Fiber, Google Fiber, and other SC/APC-based FTTH systems.
- Plug-and-Play Fiber Connectivity — Installer-approved for residential and light commercial use, this armored SC/APC cable works instantly with ONTs, media panels and rack systems — no setup, no tools, no compatibility problems.
- Bonus SC/APC Coupler & Zip Ties for Hassle-Free Setup — Includes a matching SC/APC coupler for quick line extensions or equipment relocation, plus zip ties for neat routing along baseboards, inside cabinets, or behind entertainment centers. No extra accessories needed — cleaner installs from day one.
Who is constructing the Salem County phase?
Salem County’s May 6, 2026, bid notice identified the Cumberland County Improvement Authority as construction manager for Salem County. The notice set a June 12 bid deadline and required a bid guarantee equal to 10% of the bid, capped at $20,000.
The Authority’s October newsletter said Salem County awarded the Priority Middle Mile project to Millennium Communications Group LLC. It reported that construction would begin soon and that a groundbreaking was expected later in October. A contemporaneous October 13 report from CNBNews/Gloucester City News described a groundbreaking attended by Congressman Jeff Van Drew and local officials.
The Tool Desk
Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Project scope and figures at a glance
| Item | Figure or description | Source and qualification |
|---|---|---|
| Federal grant | $24.18 million | NTIA award announced June 16, 2023 |
| Grant announcement network scope | 220 route miles of fiber | Scope described in the June 2023 Senate announcement |
| Currently awarded Priority Middle Mile phase | More than 50 miles of fiber | Authority newsletter dated October 2, 2026 |
| Contractor | Millennium Communications Group LLC | Salem County award reported by the Authority in October 2026 |
| Broader project figures in a groundbreaking report | $24.1 million in federal funding; more than 180 miles of new fiber | Contemporaneous CNBNews/Gloucester City News report, October 13, 2026; differs from the 2023 grant announcement’s 220-route-mile scope |
| Authority’s current posted estimates | $34.5 million total project cost; 250 New Jerseyans employed; $51.8 million total economic impact | Current 2026 project page; no publication date is shown, so these are undated posted estimates rather than a newly dated award |
Why the fiber network matters
More opportunities for providers
The federal announcement says the network is intended to let smaller internet service providers use shared infrastructure to enter the market. An open-access middle-mile network can reduce the need for each provider to build a completely separate long-distance backbone, potentially making service expansion more practical and increasing competition.
Connections for anchor institutions
Planned beneficiaries include homes and businesses as well as schools, healthcare providers, public-safety agencies and other anchor institutions. Salem County deputy commissioner director Mickey Ostrum said on October 13, 2026: “Now we can start filling the many cellular and internet gaps plaguing our residents, thus improving access to so many educational and work-related opportunities.”
Also popular on Amazon
- Fix your Home Fiber - Compatible to replace a Verizon Fios cable, AT&T Fiber optic cable for the AT&T fiber optic modem bgw 320 and more. Our SCAPC fiber optic patch cable is the ideal replacement or fiber optic extension cable
- Easy Press and Click Installation - Works as a Verizon internet cable replacement, ATT Fiber optic cable internet, Google Fiber, Century link, UniFi Dream machine and as a fiber optic network cable replacement for any corning fiber cable
- 50% Thicker Jacket - Our 3mm optical fiber cable is more robust than a standard 2mm thin network fiber optical cable. Our Singlemode fiberoptic cable meets all UL, cUL, IEC & RoHS standards
- Fiber Optic Ethernet Cable has a SCAPC Connector Included - SC APC Adapter included with each cable for easy extension or connection from your incoming ONT cable
- Pre-Cleaned & Ready for use - We pre clean and dust cap cover all cables prior to shipment so you avoid Fiber signal Loss. Remove Dust cap before insertion, never tough the end face
Congressman Jeff Van Drew said at the October 2026 groundbreaking: “We live in a digital world, and South Jersey needs to be right there at the forefront.” Both statements describe intended public benefits and goals, not independent measurements of speed, reliability or prices.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.When will residents be able to order service?
The available project announcements establish that construction is starting in October 2026, but they do not provide a street-by-street completion schedule, an address-level availability map or a list of retail providers accepting orders. Construction of backbone fiber therefore does not mean that every household can order high-speed internet immediately.
Availability will depend on the route built near an address, completion of later network segments, connections from the middle-mile backbone, and participation by internet service providers. The project sources also do not establish future monthly prices, advertised download or upload speeds, installation fees, contract terms or outage-support policies.
What to watch as construction progresses
- Publication of route maps or address-level service information for Cumberland and Salem counties.
- Announcements from providers that plan to use the open-access network.
- Construction milestones showing when backbone segments and last-mile connections are ready.
- Retail plan details, including speeds, recurring charges, installation costs, contracts and service-support arrangements.
For now, the confirmed development is the launch of the Priority Middle Mile build: Millennium Communications Group LLC has been awarded the Salem County work, and more than 50 miles of fiber are planned in that phase as the wider South Jersey Broadband project moves from funding and procurement into construction.

