Black Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run ScanBlack Friday PreviewAmazon USThe best pick may show up before FridayAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction

Parking Lot Trends: Greener Operations and Less Parking in the 2018 Design Playbook

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Parking lot trends are moving in two directions in the 2018 design perspective examined here: make the parking that remains more efficient and avoid building spaces that a project does not need. The approach links parking to energy, emissions, materials, transportation, urban density and real-estate economics—not just stall counts. A Building Design + Construction article attributed to Paladino and published September 19, 2018 presents these ideas as emerging design strategies, not as a current survey of adoption, regulation or construction prices. Its central lesson is straightforward: measure demand, improve the operation of necessary parking, and preserve options for a future in which vehicle use may change.

The examples and figures below therefore remain historical and source-bound. They can inform a 2026 feasibility discussion, but current EV-ready rules, parking minimums, construction costs and project outcomes must be checked with the applicable authority and project team.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What did the 2018 parking-lot trend discussion identify?

The article treats parking as part of a wider building and mobility system. Vehicle sharing, transit-oriented development, denser urban projects and anticipated changes in how people use cars could reduce demand for individually assigned parking. Those were expectations expressed in 2018, not verified forecasts of what every market would do.

That distinction matters. A lower parking ratio may be sensible next to reliable transit and abundant public or shared parking, while the same ratio could create spillover problems in a car-dependent district. The source does not provide a jurisdiction-by-jurisdiction code survey or a current adoption rate. It offers a framework for asking better questions before drawing a site plan.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

The article also puts parking’s physical footprint in context, attributing an estimate to the Gensler Research Institute that approximately one third of a typical American city is asphalt. The underlying source, year and methodology are not independently verified here, so the figure should be read as an attributed historical estimate rather than a universal measurement.

“The cheapest parking structure is the one that you don’t have to build.”

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Paladino’s line captures the economic side of demand management. Avoiding unnecessary excavation, structure, paving, lighting, ventilation and maintenance can be more consequential than optimizing a facility after it has already been overbuilt.

How can an owner decide whether to build fewer spaces?

Start with demonstrated demand and available capacity, not a default ratio. The article’s supply-reduction options are practical ways to test whether a project can meet demand without adding a new deck or surface lot.

  1. Measure the demand profile. Separate resident, employee, visitor, service, accessible and loading needs. Look at peak periods rather than relying only on a daily average. Document seasonality, event conditions and any contractual parking obligations.
  2. Inventory nearby capacity. Identify unused spaces in the same building, neighboring facilities and shared or rented inventories. Confirm hours, security, walking routes, pricing and whether a third party can legally make spaces available.
  3. Model shared use. A residential space that is idle during the workday may serve an office or retail user, for example. The source recommends renting out unused spaces and coordinating with nearby operators; the agreement, insurance and access controls require project-specific review.
  4. Consider unbundling. Instead of automatically including a stall in every residential lease, price parking separately. This reveals who actually values a space and avoids charging non-drivers for construction and operating costs. Local tenant-protection and leasing rules still apply.
  5. Test a transit-oriented scenario. Projects near transit may provide less or no on-site parking when analysis shows that alternatives and surrounding capacity can absorb demand. This is a planning proposition, not permission to disregard a current minimum or a required accessible space.
  6. Document a fallback. Set thresholds for adding leased spaces, changing curb management or expanding supply if observed demand exceeds the model. A written trigger is safer than assuming a future operator can solve the problem informally.

The Philadelphia example in the article is 1213 Walnut, described as a roughly 300,000-square-foot residential project that was built and leased with zero on-site parking after analysis found a surplus of area parking. That description should be attributed to the 2018 article; it is not independent verification of the project’s current operation or of conditions in Philadelphia today.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

Which operational upgrades make an existing garage greener?

Lighting, charging infrastructure, materials and ventilation are the main levers named by the source. They can be evaluated separately, then coordinated with a capital plan so that one intervention does not undermine another.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Lighting and controls

Lighting upgrades can lower electricity use and maintenance work, especially when fixtures and controls respond to occupancy or daylight. The article attributes a result of 90% lower lighting-related energy use among U.S. Department of Energy LEEP participants. It does not specify the study period or establish that every garage would achieve the same reduction.

The article also cites a Northwestern University campus parking-structure upgrade and reports approximately $40,000 in annual electricity-cost savings. That is a source-attributed project figure, not a current guarantee. A design team still needs to verify illumination levels, uniformity, glare, emergency operation, controls compatibility, mounting conditions and local electrical requirements before selecting a fixture.

For an owner, the useful sequence is to establish a baseline from utility bills and operating hours, map existing circuits and controls, define required light levels, then compare a replacement project with a controls-only phase. A parking-garage LED light is a product category, not a universal specification; optics, environmental rating, temperature range, vandal resistance and maintenance access must match the structure.

Electric-vehicle readiness

The article recommends providing charging, reserving access and installing EV-ready wiring or conduit where equipment may be added later. It notes that some cities required EV-ready parking at the time of publication. Requirements change, so the 2018 statement cannot be used as a 2026 code determination.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

Design the electrical pathway before concrete is poured or ceilings are closed. Confirm service capacity, transformer and panel locations, cable routes, fire-protection coordination, networking, payment or access controls and the number of spaces that can be expanded in phases. Distinguish an EV-capable space, a space with installed conduit and a space with an operating charger in the drawings and lease language; they are not interchangeable promises.

Materials and lifecycle planning

Material selection should include embodied impacts, local procurement opportunities, durability, repairability and end-of-life handling. The article points to the Mors Gate garage as an example described as recyclable and dismantlable. That example illustrates a design intent rather than a measured lifecycle result for all garages.

Ask suppliers for documented content and maintenance information, design connections that can be disassembled where practical, and record what will be removed or replaced during future renovations. A lower-carbon material that fails early can create more waste and cost than a durable option, so lifecycle planning belongs in the initial specification rather than in a demolition plan.

Ventilation and exhaust control

Natural ventilation, heat recovery and exhaust sensors that control fan operation are presented as ways to address emissions and energy use. The right solution depends on the garage’s geometry, enclosure, climate, fire strategy and mechanical code. Sensors and controls should be commissioned and maintained; a nominally efficient system that runs continuously or is poorly calibrated can erase the intended savings.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How do parking structures stay adaptable?

Adaptability means designing a structure so that a later change of use is technically and financially plausible, not promising that conversion will automatically occur. Consider floor-to-floor height, structural loading, column spacing, ramp geometry, daylight, plumbing routes, fire separation, egress, acoustics and façade openings during concept design.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

The article describes a proposal for Seattle’s 4th and Columbia in which above-grade parking could potentially be converted to apartments or offices if plans were approved. The article does not report whether approval, conversion or occupancy ultimately occurred. Treat it as a design possibility that requires a new code analysis and a credible financial plan, not as a completed case study.

An owner can preserve options by documenting structural capacity, locating vertical shafts where future bathrooms or kitchens could connect, protecting areas for new stairs or elevators, and separating parking systems that would be difficult to remove. These choices add design coordination up front, but they may reduce the cost of a major future alteration.

How do the main strategies compare?

The following matrix translates the source’s comparison axes into a decision aid. It is qualitative and historical; it is not a current cost or performance ranking.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Strategy Demand and capacity question Capital and operating implications Energy and emissions EV readiness Future flexibility Planning and code checkpoint
Lighting and controls Useful after the required supply is known; does not reduce stall demand by itself. Up-front retrofit or replacement cost; potential maintenance and electricity savings. Directly targets lighting energy; outcome depends on design and controls. Coordinate conduits, panels and access controls during electrical work. Controls and modular fixtures can simplify later phases. Verify illumination, emergency lighting and electrical requirements.
EV charging and ready wiring Supports changing vehicle mix without adding stalls. Service upgrades and equipment can be phased; future installation still needs capacity. Enables charging but does not by itself prove lower emissions. Primary benefit; define exactly what “ready” means. Conduit and spare capacity preserve expansion options. Check current local requirements, utility rules and fire provisions.
Lower-impact, lifecycle-focused materials Neutral to stall count; relevant to a new or substantially renovated structure. Compare procurement, durability, maintenance and end-of-life costs. Addresses embodied impacts and waste potential. Coordinate durable surfaces and protected electrical routes. Dismantlable or repairable assemblies can support reuse. Confirm structural, fire, durability and procurement compliance.
Natural ventilation, heat recovery and exhaust sensors Neutral to demand; affects how an enclosed facility can operate. May alter mechanical capital cost and commissioning needs. Can reduce fan energy and manage vehicle exhaust when correctly designed. Account for future charging loads and ventilation strategy together. Controls can be tuned as use changes. Verify mechanical, fire and indoor-air requirements for the jurisdiction.
Shared, rented or unbundled parking Tests whether existing or nearby capacity can serve users. May avoid new construction; requires agreements, management and enforcement. Less new concrete and less area to light or ventilate when supply is avoided. Coordinate charger access and billing across operators. Preserves land and capital for other uses. Check zoning, parking minimums, leases, accessibility and curb impacts.
Transit-oriented low or zero on-site supply Works only when analysis demonstrates alternatives and surplus capacity. Can remove a major construction cost, but increases dependence on mobility options. Reduces construction and operational footprint. Decide how charging will be provided off site or in a limited shared supply. Leaves more site area for adaptable uses. Obtain current planning approval; do not assume a 2018 precedent controls.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What did parking cost in the historical figures?

The article quotes the Parking Structure Cost Outlook, 2017 as reporting median construction costs of $19,700 per space and $59.06 per square foot for a new parking structure. Those numbers describe the cited 2017 outlook as reproduced in a 2018 article. They are not 2026 bids, escalation-adjusted budgets or a substitute for a site-specific estimate.

Use them only to understand why avoiding unnecessary supply can have a large order-of-magnitude effect. Current budgeting should account for land, excavation, foundations, structure, façade, fire protection, ventilation, electrical service, charging, soft costs, financing, labor market and local conditions.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

How should a project team apply these ideas now?

A disciplined process keeps the historical ideas useful without treating them as current rules.

  1. Set the decision date and jurisdiction. Record the municipality, zoning district, applicable building and fire codes, transit assumptions and the date on which requirements were checked.
  2. Create a demand register. Count each user group and peak period, then show which spaces are required, discretionary, shared or replaceable by nearby capacity.
  3. Audit the existing facility. Capture lighting connected load, controls, utility history, ventilation run time, maintenance records, structural constraints and electrical spare capacity.
  4. Build at least three scenarios. Compare a conventional supply, a shared or unbundled plan, and a lower-supply transit-oriented plan where appropriate. Add a phased EV-ready and lighting package to each.
  5. Price lifecycle consequences. Separate capital, energy, maintenance, management, leasing and eventual conversion costs. Mark every historical figure as a reference, not a current estimate.
  6. Resolve approvals early. Confirm parking minimums or maximums, accessible-space rules, loading, bicycle requirements, stormwater, fire access, EV provisions and any agreement needed with a neighboring operator.
  7. Write operating safeguards. Define who controls shared access, collects payment, maintains chargers, responds to faults and monitors demand. Establish the trigger for adding capacity or changing the allocation.

This process also makes the business case legible to lenders, tenants, planners and neighbors. A project is not “greener” simply because it has fewer stalls; it is better supported when demand, alternatives, operating impacts and future obligations are documented.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Are LEEP and Parksmart still the right certification references?

The article names LEEP and Parksmart as parking-sustainability options. Their current requirements, administration and status were not verified for this article, so a team should confirm the active program directly before using either in a certification or procurement commitment. Certification can organize documentation, but it does not replace code compliance, demand analysis or commissioning.

What are the main pitfalls?

  • Applying a historical percentage as a promise. The 90% LEEP lighting result and the Northwestern savings figure are attributed examples, not guaranteed project outcomes.
  • Confusing “EV-ready” with a charger. Conduit, panel capacity, installed equipment and a commissioned service have different costs and capabilities.
  • Assuming a precedent transfers automatically. The 1213 Walnut description and Seattle proposal are case-specific and do not establish current permission elsewhere.
  • Ignoring management. Shared or rented spaces fail when access, payment, security and maintenance responsibilities are undefined.
  • Designing conversion too late. Ramps, structure, shafts, daylight and egress can make a later apartment or office conversion impractical even when the idea sounds attractive.
  • Using outdated prices. The 2017 cost figures are useful historical context only; obtain current local estimates.

What is the practical conclusion?

The 2018 parking-lot trend perspective is best used as a sequence of questions: How many spaces are actually needed, can nearby capacity be shared, how efficiently can the remaining facility operate, and can the structure adapt if mobility patterns change? Lighting upgrades, EV-ready infrastructure, lifecycle materials and better ventilation address the parking that must exist. Unbundling, shared supply and transit-oriented planning address whether all of it needs to be built. Current codes, project economics and local evidence must decide the final answer.

Frequently Asked Questions

What does unbundled parking mean for a residential project?

Unbundled parking charges for a space separately from the residential unit rather than embedding one stall in every lease. It can reveal actual demand and avoid charging non-drivers for parking, but lease language, accessibility, tenant protections and local regulations still need review.

Can an existing parking garage be converted into housing or offices?

Sometimes, but feasibility depends on structural capacity, floor-to-floor height, ramps, daylight, plumbing, fire separation, egress and financing. The Seattle example in the source was a proposal whose approval and completion status were not reported, so it should not be treated as a completed conversion.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How should an owner budget EV-ready parking?

Separate the costs of utility service, panels, conduit, distribution equipment, chargers, networking and ongoing operations. Draw the expansion path now and verify the current local code and utility requirements; “ready” can describe infrastructure without meaning that a charger is installed.

Is a 90% lighting-energy reduction typical for every garage?

No. The 90% figure is attributed to U.S. Department of Energy LEEP participants in the 2018 article, which does not give a study period or promise that result for every facility. Existing fixtures, operating hours, controls and design targets determine a project’s outcome.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.