The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Moberly marked a major construction milestone on October 27, 2026, when officials and community members signed a steel beam before it was installed in the city’s first new fire station since 1977. The topping-off ceremony at 1445 South Morley Street signals that the structure has reached a key stage, but it is not the station’s final completion or opening. City officials currently expect the replacement for Fire Station No. 2 to open in May 2027, subject to weather and construction progress.
What happened at the Moberly fire station topping-off ceremony?
The city held a topping-off ceremony at the future station site on October 27. Attendees signed a structural steel beam, which was then incorporated into the building. Topping off traditionally marks placement of a major structural member and celebrates the point at which a building’s frame is substantially advanced.
As an Amazon Associate I earn from qualifying purchases.
Fire Chief Don Ryan said the project team wanted to enclose the structure before winter so interior work could continue. He also cautioned that weather could affect the schedule. The city’s August 19 construction notice anticipated at least 12 months of work, while the more recent public target calls for an opening in May 2027. If construction finishes on schedule, operations are expected to begin roughly a week after completion.
When will Moberly’s new fire station open?
The expected opening is May 2027, but that date is a forecast rather than a guaranteed occupancy date. The October milestone shows progress on the structural work; remaining enclosure, interior construction, systems installation, inspections and move-in activities still have to be completed before firefighters can operate from the new facility.
Popular on Amazon
- PUSH-BUTTON ALARM: Clang-clang-clang! The alarm is ringing and flashing - there is a fire to put out. The sound/light effect controlled by a button (required 2xAAA batteries, not included) adds more fun to this dollhouse playset and realism to play scenarios
- DOWN THE POLE WE GO: There's an emergency so we need to get the firefighter into the fire engine and on the move ASAP. Slide your fireman down the pole, sound the alarm bell and send your firefighter out to get those flames!
- REALISTIC PLAY: The firefighter comes with bendable feet and arms. Make him fit inside the truck or the helicopter. Everything your firefighter will need to save lives is ready, an ax, helicopter, fire hydrant, flag and control board!
- AUTOMATIC DOOR: Pull the string, the fire engine will rush out of the garage, to the fire scene and save the day. Kids will have more hours of fun playing with this wooden toy!
- ROLE PLAY: Create your own fun play scenarios with this playset. There are endless opportunities for individual and group roleplay
Ryan’s winter-enclosure goal is intended to protect the schedule, yet seasonal conditions can still delay exterior and site work. Readers should therefore treat May 2027 as the city’s current expectation, not a fixed commitment.
Why is Moberly replacing Fire Station No. 2?
The project replaces the existing Fire Station No. 2 on North Morley Street, a 1974 facility the city says has reached the end of its functional service life. The new building is intended to provide safer, more adaptable work and living conditions while supporting current emergency-response demands.
Outdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchWindows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallRyan said updated facilities are crucial because of the condition of the existing station and that improved living spaces could help with firefighter recruitment. The new station will also serve calls on Moberly’s south side. In an ABC17 interview, Ryan said the department’s average response time is about four minutes; that figure is his reported department average, not a project guarantee.
Also popular on Amazon
- MADE OF WOOD & EASY ASSEMBLY: Kids' play set made of premium, sustainable materials for long-lasting play. With simple-to-follow instructions and minimal tools, one person can set up this item in approximately 1 hour or less.
- 26 ACCESSORIES: Enjoy five-alarm fun with a furniture, a police motorcycle, fire truck, fire dog, helicopter bendable heroes and much more.
- FIREFIGHTER'S POLE: Floor-to-ceiling firefighter's pole lets the heroes get ready to rescue in no time.
- PLAY & PUT AWAY: After playtime is over, store all pieces inside and close up for easy cleanup and a clutter-free area.
- FOR BIG PLAY: This open and close play set stands over 2 feet tall and features 3 levels and 12 rooms including a rooftop sports court and helipad, so multiple kids can play together.
What will the new station include?
The planned facility is approximately 7,700 square feet and is designed around emergency operations, crew support and training.
- Three drive-through, or pull-through, apparatus bays for moving vehicles through the building.
- Updated firefighter living quarters and administrative offices.
- A two-story fire-training tower.
- A storm-shelter area.
- Provisions for emergency backup power.
A preliminary design document describes a pre-engineered metal-building structural system with metal-stud infill. The drive-through layout can reduce backing and maneuvering during apparatus deployment, while dedicated offices and living areas separate administrative and residential functions from vehicle operations.
What will the training tower be used for?
The tower is planned as a multi-use training center for Moberly firefighters and potentially neighboring agencies. Its features are intended to reproduce several conditions crews face in structure fires and technical rescues.
Quick wins for a faster PC:
Clear out junk files and repair common Windows errorsFree Scan →Scan for outdated or missing drivers - takes under a minuteDriver Scan →Repair Windows errors before they cause bigger problemsFix Now →Also popular on Amazon
- Multifunctional Large City Action Track Set - This Transform track toy for boys comes with a 29.5" police & fire station with track, 2 Fire trucks, 2 Police cars, 1 rescue helicopter, and traffic signs. Everything kids need to pretend city rescue action and transport accessories are included, and great for boys and girls aged 3 years old and up. It offers kids more chances to create models they want, making your kids have fun in pretend play.
- 2 in 1 Rescue Action Toy - This toddler playset can transform into a police station and fire station. Kids can imagine and play a firefighter and Police. There are a wide variety of rescue travel options, including elevators, tracks, garages, and airports, allowing you to experience the rescue operation in person. A great toy to develop kids' hands-on ability and enrich their imagination. Recommended educational toys for boys and girls ages 3, 4, 5, 6, 7
- Tower Command Center with Real Sound and Light - This lookout tower toy has realistic sounds and lights, plus a walkie-talkie. So kids can simulate the rescue services and use the walkie-talkie to give instructions to initiate a rescue operation. Young car enthusiasts will enjoy fun and love this truck playset toy. Ideal for igniting imaginative play and fostering friendly competition among children.
- Transforms & Safe & Portable Toys - The large rescue scene toy is made of environmentally friendly high-quality plastic materials. No fading, non-toxic, no odor. It can be unfolded or folded into a portable box. It is very large when unfolded, and does not take up space when folded. The foldable design is very convenient to carry, so you can play any time indoors and outdoors. Perfect toy for toddler 2, 3, 4, 5, 6, 7, and 8 years old.
- Ideal Gift for Children Over 3 Years Old - The toddler city action toy set comes with a beautiful gift box, which is a great gift for kids' birthdays, Thanksgiving, Children's Day, Christmas, Halloween, Thanksgiving, and New Year, and a top toy gift for 3, 4, 5, 6, 7, 8 years old boys. This large track toy for kids is an ideal toy to improve children's hand-eye coordination and imagination, stimulate creativity, and promote children's growth.
Live-fire and building-systems drills
A live-fire burn room will support controlled fire-suppression exercises. Standpipe and sprinkler connections are planned for commercial-interior simulations, allowing crews to practice hose and water-supply operations in configurations beyond a typical residential setting.
Confined-space and stair evolutions
A reconfigurable confined-space lab will support search-and-rescue practice. Multi-story stairwells are planned for hose-pack evolutions and stair climbs, exercises that build proficiency in moving equipment and crews through vertical structures.
Technical-rope rescue
A rappelling structure will provide a venue for technical-rope rescue training. The city also hopes to draw neighboring departments for regional sessions. Ryan said the goal is both to keep Moberly firefighters current on techniques and to create training opportunities for other agencies.
Also popular on Amazon
- 👮【2-in-1】 Our playset combines a fire station and police station in one set, letting kids switch between firefighter and police officer role-play seamlessly. With realistic details (fire truck, police car, firefighter/police figures, tools), it sparks endless creative storytelling, perfect for kids who love rescue adventures. Dual boy doll house, Endless Imaginative Play.
- 🚔️【Fun Eject Launch & Interactive Track Design】Designed with kid-friendly interactive features: the fire station playset has a one-button eject slide to launch the fire truck instantly, while the police station playset features a 360° rotating gate and ramp track for the police car. No batteries required—kids can enjoy hours of push-and-play fun anytime, anywhere.
- 👨🚒【Building Blocks Compatible, DIY Expandable Fun】The top of both stations is designed with standard large building block studs, fully compatible with major brand large building blocks. Kids can freely expand the fire station playset and the police station playset, build their own rescue city, and exercise hands-on creativity and spatial thinking.
- 🚒【Complete Accessory Set for Immersive Role-Play】The boy doll houses comes with everything needed for rescue adventures: fire station playset(1 station,1 fire truck, 1 firefighter figure, shovel, traffic cone, plus fire extinguisher). police station playset(1 police car, 1police officer figure, megaphone, traffic cone, shield, baton, and more).All accessories are sized for small hands, easy to grasp and play.
- 🧑🚒【Safe & Durable, Perfect Gift for Kids Ages 3+】Made of high-quality, non-toxic, BPA-free plastic with smooth edges, this boy doll house playset is 100% safe for toddlers. Sturdy and drop-resistant, it withstands hours of rough play. It’s the ideal gift for birthdays, Christmas, holidays, or any occasion, bringing endless joy to boys and girls aged 3 and up.
How much is the new Moberly fire station costing?
The City of Moberly awarded Reinhardt Construction, LLC a construction contract totaling $4,643,800 after competitive bidding. That is the awarded building contract, not necessarily the project’s complete cost. ABC17 reported City Manager Michael Bugalski describing the broader project cost as about $5 million.
Free tools Windows power users keep installed
One-click scans. No signup required.
| Figure | What it represents | Source context |
|---|---|---|
| $4,643,800 | Awarded construction contract | City construction notice and July 10, 2026 council agenda |
| About $5 million | Reported overall project cost | Figure attributed to City Manager Michael Bugalski in ABC17’s October 27 report |
| Nearly $1.2 million | USDA grant contribution | Amount identified in city project materials; ABC17 reported it as $1.2 million |
The financing combines American Rescue Plan Act State and Local Fiscal Recovery Funds, municipal reserves and a USDA grant. Because USDA money is involved, the bid notice requires compliance with the federal Build America, Buy America Act, including domestic manufacture of applicable materials.
How will the project affect emergency coverage and regional training?
The station’s South Morley location is intended to support calls on the south side of Moberly while replacing an aging North Morley facility. Its pull-through bays, updated crew areas and backup-power provisions are designed for dependable daily operations, although the city has not published a projected change in response times.
Also popular on Amazon
- Save the day with a sturdy firehouse, electronic SmartPoint fire truck, Dalmatian dog, fire, fire extinguisher and fire hose
- Cruise over four SmartPoint areas to hear sounds, music, first words and phrases about feelings and being a firefighter
- Lift the elevator, ring the bell and more to strengthen fine motor skills
- Revved-up responses drive learning and encourage imaginative play; collect more Go! Go! Smart Wheels track sets and cars to explore unique SmartPoint responses on each set (sold separately)
- Intended for ages 1.5+ years; requires 2 AAA batteries; batteries included for demo purposes only; new batteries recommended for regular use
The training tower adds a capability that can serve both local firefighters and departments from nearby communities. Regional use could make the facility a shared training resource, but the city has not announced a schedule, fees or participation rules for outside agencies.
Frequently Asked Questions
Where is Moberly building the replacement fire station?
The project is at 1445 South Morley Street. It replaces Fire Station No. 2 on North Morley Street.
Who is constructing Moberly’s new fire station?
The City of Moberly awarded the construction contract to Reinhardt Construction, LLC through competitive bidding.
What does a fire-station topping-off ceremony mean?
It marks the placement of a major structural beam, often with signatures or messages added before installation. It celebrates structural progress and does not mean the building is ready for occupancy.
Will other fire departments be able to train at the new tower?
Moberly officials hope to offer regional training opportunities to neighboring agencies. The city has not yet published operating arrangements for outside departments.

