A laboratory building commissioning checklist should cover the full path from defining the lab’s intended use through construction, acceptance testing, handover, and occupancy. Start with the Owner’s Project Requirements (OPR), include both building-wide and laboratory-specific systems, and require documented startup, functional and relevant integrated tests, issue resolution, operator training, and follow-up. Acceptance criteria must come from the project’s OPR, design, contract, applicable standards, and local requirements—not from a generic checklist alone.
What should a laboratory commissioning checklist include?
It should verify that the building and its systems are designed, installed, tested, documented, and handed over to support the work the laboratory is actually meant to perform. Commissioning is a process, not a final inspection: planning and clear responsibilities matter as much as the tests performed near completion. ASHRAE’s laboratory guidance starts commissioning with the lab’s intended use as described in the OPR.
As an Amazon Associate I earn from qualifying purchases.
Free tools Windows power users keep installed
One-click scans. No signup required.
Use this checklist as a planning and tracking framework. Tailor it to the project’s scope, equipment, hazards, operating modes, contract, adopted standards, and jurisdiction. A checked box is not proof of performance by itself: record the applicable criteria, evidence, issues, and approvals.
1. What should owners define before construction?
Before work begins, establish what the lab must do and how the project team will demonstrate that the completed facility meets those needs. This is the stage to settle scope, responsibilities, acceptance criteria, and coordination—not after systems are installed.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
- Define intended use. Document the work performed, anticipated equipment, environmental conditions, and normal, reduced, emergency, or other relevant operating modes. Identify equipment interfaces and any laboratory functions that affect building systems.
- Develop the OPR and Basis of Design (BOD). The OPR records the owner’s needs and performance expectations; the BOD explains how the design intends to meet them. Keep both aligned as project requirements or design decisions change.
- Identify regulated requirements early. Determine whether any systems or processes have FDA-regulated requirements that create additional design, commissioning, or validation obligations. Do not assume every laboratory has the same regulatory regime; establish the applicable project-specific requirements.
- Appoint the commissioning provider or authority and assign roles. Specify who prepares procedures, performs and witnesses tests, records results, resolves deficiencies, approves retests, and accepts deliverables. Clarify the owner’s witness and approval rights.
- Write the commissioning plan and schedule. Define included systems and assemblies, procedures, acceptance criteria, communications, issue tracking, and how commissioning activities fit the construction schedule. Include laboratory equipment and its interfaces where they are within project scope.
- Coordinate commissioning with design and procurement. Make sure requirements appear in project documents and submittals, and that test access, equipment availability, and time for corrective work and retesting are planned.
ASHRAE’s standards and guidelines index lists Standard 202-2024 for commissioning new buildings and new systems, Standard 230-2022 for existing buildings and systems, and Guideline 0-2019, whose process spans predesign through occupancy and operation. These references are not a substitute for checking which editions are specified in the contract or adopted locally.
2. Which laboratory and building systems need commissioning?
Include the systems needed for the particular facility, not just conventional heating and cooling. Laboratory exhaust, containment equipment, controls, utilities, emergency systems, and their interactions can all affect whether the space operates as intended.
Do these 3 things before closing this tab:
1Fix the driver behind crashes, sound loss and screen glitches2Clear out junk files and repair common Windows errors3Scan for outdated or missing drivers - takes under a minute| System or assembly to consider | Commissioning focus |
|---|---|
| Heating, ventilation, air conditioning (HVAC) | Verify installed equipment, sequences, controls, and performance against project requirements across relevant operating modes. |
| Laboratory exhaust and chemical fume hoods | Include exhaust configuration and performance, specified controls, alarms, and the relationship between exhaust and supply air. |
| Biological safety cabinets and laminar flow clean benches | Check manufacturer airflow requirements and coordinate the equipment’s requirements with the room and ventilation design. |
| Laboratory pressurization and temperature controls | Confirm the specified monitoring and control functions and their intended response to relevant modes or events. |
| Supply, exhaust, and heat-recovery controls | Verify control sequences and interactions included in the design and test scope. |
| Chilled water and heating water | Verify applicable equipment, distribution, controls, and interfaces with laboratory loads. |
| Plumbing and fire protection | Include the project-specified systems and their relevant operating or alarm interfaces. |
| Electrical and emergency power | Verify applicable systems and include relevant integrated scenarios, such as emergency power interactions with laboratory HVAC. |
| Fire alarm | Include relevant interfaces and integrated tests with systems whose operation may be affected by an alarm event. |
| Monitoring, controls, and building automation | Verify specified monitoring points, alarms, sequences, and the controls used for laboratory and building systems. |
| Laboratory casework | Confirm applicable installed assemblies and interfaces in the agreed commissioning scope. |
| Security access and surveillance | Include the facility’s specified security systems and relevant interfaces. |
This scope prompt reflects systems identified in the Association of Public Health Laboratories’ laboratory construction and major renovation guidance and ASHRAE’s laboratory chapter. Applicability varies by facility. Set the actual scope in the project documents, and derive thresholds from the OPR, BOD, equipment requirements, contract, and applicable standards. The source guidance does not set one universal airflow, pressure, or temperature acceptance value for every laboratory.
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
3. What should owners verify during construction?
Construction verification establishes that installed systems match the approved design and are ready for meaningful performance tests. Do not rely on a whole-system test to compensate for incomplete component startup or unresolved installation discrepancies.
- Check installations against approved documents. Verify equipment and systems against approved drawings, submittals, and design intent. Record discrepancies and their disposition.
- Track commissioning issues in a live log. For each item, record a clear description, responsible party, status, required corrective action, evidence of resolution, and any retest or approval needed. Keep unresolved items visible through handover.
- Confirm component startup and prefunctional checks. Obtain completed procedures and evidence for individual components before proceeding to functional tests that depend on them.
- Review test and balance (TAB) reports. Confirm required reports and submittals are available and addressed in the commissioning record.
- Coordinate access and readiness. Confirm the systems, equipment, controls, and documentation needed for scheduled tests are available. Plan time to correct deficiencies and repeat affected tests.
4. How should functional and integrated tests be planned?
Each test needs a written procedure and pass/fail criteria tied to the OPR and BOD. Test the intended range of operating modes and relevant interactions, and record enough evidence to show what happened—not just that someone marked a checklist complete.
- Write the procedure before the test. Identify the system or assembly, prerequisites, test conditions, operating mode, steps, expected response, acceptance criteria, required readings or observations, responsible parties, and witness or approval requirements.
- Verify individual systems first. Test equipment and systems under their relevant intended modes after startup and prefunctional checks are complete. Use criteria specified for the project; do not substitute generic numbers for project requirements.
- Plan integrated tests for meaningful interfaces. Decide which combined scenarios matter to the design. ASHRAE notes that laboratory HVAC may need coordinated testing with systems such as fire alarm and emergency power. Include only applicable scenarios, but make the rationale and responsibilities clear.
- Record results and exceptions. Capture conditions, readings, observed responses, failures, corrective actions, retest evidence, and approvals in the project record.
- Resolve and retest failures. Assign each deficiency, document its disposition, and repeat affected tests when needed. Retain evidence of the correction and retest rather than replacing a failed result with an unsubstantiated pass.
For laboratory HVAC, relevant checks may include manufacturer airflow requirements for biological safety cabinets and clean benches, exhaust configuration and performance, approved TAB reports, fume hood alarms, safety alarms, exhaust regulation, laboratory pressurization and temperature control, and supply, exhaust, and heat-recovery controls. ASHRAE identifies these as laboratory HVAC and controls considerations; the project’s own design and applicable requirements determine the acceptance criteria.
The Tool Desk
Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
5. What records and training belong in the handover?
Handover should leave the owner with usable system information, test evidence, a clear issue status, and staff prepared to operate and maintain the facility. Close outstanding issues or explicitly disposition them with status and responsibility; do not let an ambiguous issue log stand in for acceptance.
- Final commissioning report and systems manual.
- Current OPR and BOD, including relevant updates.
- Approved submittals, specifications, and as-built drawings.
- Equipment certifications and applicable operating parameters.
- Operations and maintenance requirements and manuals.
- Commissioning procedures, test and verification reports, and retest records.
- Final issue log showing closure or disposition, supporting evidence, and remaining responsibilities.
- Training materials and a record of attendees and the systems covered.
The exact contents depend on the project documents and facility. WBDG’s commissioning documents guidance discusses process, contents, and acceptance; APHL’s laboratory guidance also identifies records and training as part of facility delivery. Schedule operator and maintenance training as a defined commissioning deliverable, not an informal conversation at the end of construction.
6. What should happen after the laboratory is occupied?
Occupancy is part of the commissioning sequence because actual operation can expose issues that were not apparent during construction testing. Give operators procedures, plan maintenance reviews, and identify any ongoing commissioning activities the owner requires.
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
- Confirm operating and maintenance staff understand the systems they are responsible for and how those systems are intended to function.
- Review early-occupancy findings and unresolved items, assign owners, and document corrective actions.
- Update operating documentation and the maintenance plan when occupancy reveals needed changes.
- Carry out any ongoing commissioning or follow-up reviews required by the owner or project documents.
A successful acceptance test documents performance under its defined test conditions; it does not, by itself, create an operating program or guarantee that the building will continue to perform as intended. The owner’s maintenance and follow-up plan closes that gap.
How should owners compare commissioning scopes?
Compare proposals or scopes on what they cover and what evidence they produce, not on a broad promise to “commission the lab.” Ask whether the work includes:
- Systems and assemblies: Are laboratory-specific equipment, exhaust, controls, utilities, and interfaces included where applicable?
- Project phases: Does the scope begin in planning and continue through construction, acceptance, handover, and the agreed occupancy follow-up?
- Test depth: Are operating modes, integrated scenarios, written procedures, and explicit acceptance criteria defined?
- Roles and independence: Who performs, witnesses, records, resolves, retests, and approves each activity? What owner witness and acceptance rights are included?
- Deliverables and issue closure: Are reports, test evidence, final issue status, and retest documentation specified?
- Training and follow-up: Are operator and maintenance training and post-occupancy work included, scheduled, and documented?
A commissioning provider’s laboratory experience may be relevant to this scope, but experience alone does not define the work. Ask for the included systems, procedures, acceptance evidence, issue-resolution process, training, and follow-up to be stated clearly in the proposal and project documents.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
Which standards and guidance should the owner check?
Use standards and guidance as project references, then confirm the editions and requirements that actually apply. ASHRAE’s official index lists Standard 202-2024 for commissioning new buildings and new systems, Standard 230-2022 for existing buildings and systems, and Guideline 0-2019 for a commissioning process spanning predesign through occupancy and operation. The index does not establish which standards a particular jurisdiction has adopted or which editions a contract requires.
ASHRAE’s Commissioning Stakeholders’ Guide is described as step-by-step new-construction guidance for owners, designers, and project managers, with more than 50 customizable field checklists. It can help structure project documents, but a generic field checklist should be adapted to the laboratory’s OPR, design, contract, and applicable local requirements.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Frequently Asked Questions
Does every laboratory need FDA validation?
No. Whether FDA-regulated requirements apply depends on the facility’s activities and project-specific obligations. Identify the applicable regime with the responsible project and regulatory stakeholders rather than treating all laboratory commissioning as validation.
Who should approve a laboratory commissioning test?
The project should name the responsible parties before testing begins, including who performs, witnesses, records, resolves, retests, and approves the result. The owner’s acceptance and witness rights should be explicit in the commissioning plan and contract.
Can a generic commissioning checklist set fume hood acceptance limits?
A generic checklist can prompt the team to include fume hood alarms, exhaust, and related controls, but it cannot establish universal acceptance thresholds for every design. Use the project’s OPR, BOD, equipment requirements, contract, and applicable standards to define limits.
What is the difference between commissioning and validation in a laboratory?
Commissioning verifies that building systems and assemblies are delivered and operate in accordance with defined project requirements. Validation may be an additional obligation for regulated activities or systems; whether it applies and what it entails must be determined for the specific project.