HiLITE Group says Keralam Chief Minister V. D. Satheesan performed the groundbreaking for HiLITE Cyber Tower at Cyberpark in Calicut on October 3, 2026. The company describes the proposed development as a ₹600 crore, 2.5-acre Grade A commercial IT building with 9 lakh square feet of built-up space. Its completion date and job numbers remain projections, not completed results.
What is HiLITE Cyber Tower?
HiLITE Cyber Tower is a commercial IT building that HiLITE Group says it plans to develop at Cyberpark in Calicut. In an announcement published by NewsVoir on October 5, 2026, the company described the project as a Grade A building intended for multinational corporations, high-growth startups, and advanced research and development centres. The announcement names no tenants and does not identify signed leases.
The company said the building would be pre-leased before completion. That is a stated plan; the announcement does not confirm that pre-leasing has begun or that any space has been committed. Read HiLITE Group’s announcement carried by NewsVoir.
Where is the project, and when did construction begin?
HiLITE Group places the tower at Cyberpark in Calicut. Its October 5 announcement says the groundbreaking ceremony took place on October 3, 2026, with Chief Minister V. D. Satheesan performing the ceremony. The announcement’s photo caption identifies Industries, IT & AI Minister P. K. Kunhalikutty and other dignitaries as accompanying him.
Quick wins for a faster PC:
Clear out junk files and repair common Windows errorsFree Scan →Scan for outdated or missing drivers - takes under a minuteDriver Scan →Repair Windows errors before they cause bigger problemsFix Now →#1 Best Overall
- Low profile design
- Tested and marked for reverse donning
- Shell constructed from high density polyethylene materials
- Country Of Origin: China
What size and investment has HiLITE announced?
The project specifications below are figures announced by HiLITE Group in 2026, not independently verified construction measurements or final costs.
| Project detail | HiLITE Group’s announced figure |
|---|---|
| Investment | ₹600 crore |
| Site area | 2.5 acres |
| Built-up space | 9 lakh square feet |
| Building type | Grade A commercial IT building |
The announcement does not provide a floor count, detailed construction schedule, or breakdown of the stated investment.
Rank #2
- Country Of Origin : United States
- The Package Height Of The Product Is 9 Inches
- The Package Length Of The Product Is 14 Inches
- The Package Width Of The Product Is 13 Inches
What is the completion target and expected job count?
HiLITE says the project is scheduled for completion within two years and is expected to generate more than 10,000 direct IT jobs. These are the company’s forward-looking schedule and employment projection; the October 2026 announcement does not establish a delivery date, construction progress, or jobs already created.
The company also says Cyber Tower is part of a plan to develop 12 million square feet of office space over the next few years. That figure describes HiLITE Group’s wider stated plan, not the size of this tower alone.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Rank #3
- Constructed from ABS material — Strong, yet ultra-light for seemingly weightless protection
- Ratchet suspension is easy to adjust and allows the wearer to modify the fit while wearing hard hat
- Replaceable soft brow pad, suspensions and headbands also available. Provides protection at low temperatures -22°F. Provides protection at high temperatures 140°F
- 4-Point suspensions can be converted to a 6-point suspension with the HP6PTSUS
- Meets ANSI Z89.1-2009 standards, type 1, Class C, G, and E. General dimensions- 12 13/64 X 10 5/8 X 5 63/64 Inches. Shell thickness- 0.07 To 0.16 Inches
What did the Chief Minister say about wider development plans?
In the company’s NewsVoir-carried release, Satheesan referred to 50 million square feet in new development projects expected to be completed by 2030 and around 2 lakh job opportunities within Keralam. These are the Chief Minister’s statements as quoted in the release, and they refer to broader development and employment expectations rather than verified outcomes attributable to Cyber Tower.
The same announcement quotes Satheesan as saying, “The Government’s vision is re-imagining Keralam by prioritizing advanced technologies and innovation.” Kunhalikutty said Calicut could become “Keralam’s next major IT destination,” following Technopark in Thiruvananthapuram and Infopark in Kochi. HiLITE Group Chairman P. Sulaiman and CEO Ajil Muhammed also offered statements about the group’s ambitions and the role of technology; these are company and government perspectives, not independent assessments of project delivery.
Rank #4
- Low profile design
- Tested and marked for reverse donning
- Shell constructed from high density polyethylene materials
- The Package Weight Of The Product Is 4 Pounds
Is HiLITE Cyber Tower the same as HiLITE Cyber Hub?
No. HiLITE Cyber Hub is a separate development at Cyberpark Kozhikode. HiLITE’s event listing and the Cyber Hub announcement date its groundbreaking to March 9, 2026. The projects have distinct announced specifications:
| Project | Announced area | Announced investment | Other announced details | Expected direct jobs |
|---|---|---|---|---|
| HiLITE Cyber Tower, Calicut | 9 lakh sq. ft. built-up space | ₹600 crore | 2.5 acres; completion target within two years | Over 10,000, according to HiLITE Group |
| HiLITE Cyber Hub, Cyberpark Kozhikode | Around 1.6 lakh sq. ft. | Around ₹100 crore | Six storeys | Nearly 2,500, according to HiLITE Realty |
The Cyber Hub figures come from HiLITE Realty’s separate announcement, not the Cyber Tower release. See HiLITE Realty’s Cyber Hub announcement. HiLITE’s event listing is available at HiLITE Group News & Events.
Free tools Windows power users keep installed
One-click scans. No signup required.
What is confirmed—and what remains unverified?
The available announcement establishes what HiLITE said about the ceremony, proposed size, investment, intended tenants, schedule, and employment expectations. It does not independently establish project permissions, construction progress, signed tenants, final cost, delivery, or realized job creation. Until those details are confirmed, the project figures should be read as promoter-announced specifications and forecasts.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.




