The Jupiter Federal Bridge Replacement replaced a structurally deficient 1958 low-level bascule bridge on S.R. 5/U.S. 1 over the Loxahatchee River and Atlantic Intracoastal Waterway. The Florida Department of Transportation (FDOT) delivered a twin double-leaf trunnion bascule bridge with a 267-foot main span, 42 feet of maximum vertical clearance and a 125-foot navigable channel. The $122 million project also added buffered bicycle lanes, separated sidewalks and improvements along roughly 4.1 miles of the surrounding corridor. FDOT accepted the completed project on December 19, 2025. Engineering News-Record named it a 2026 Texas & Southeast Best Project in the Highway/Bridge category.
What is the Jupiter Federal Bridge Replacement project?
The project is FDOT District 4’s replacement of Jupiter’s aging S.R. 5/U.S. 1 bridge, together with corridor and intersection work on U.S. 1 and S.R. 811 (Alternate A1A). Johnson Bros. Corp. submitted the project and served as general contractor, while Hardesty & Hanover LLC was the lead design firm. The work addressed structural, navigation, traffic, bicycle and pedestrian deficiencies in one of South Florida’s active waterfront corridors.
As an Amazon Associate I earn from qualifying purchases.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Why did the 1958 bridge need to be replaced?
The original low-level bridge had a poor deck rating and an overall fitness rating only slightly above “unsatisfactory,” according to FDOT’s project-development documentation. It also lacked dedicated bicycle and pedestrian facilities. Its horizontal clearance between fenders was 80 feet, below the U.S. Coast Guard’s 125-foot requirement cited for the replacement channel.
- Structural condition: the deck was rated poor, with the bridge nearing the end of its service life.
- Navigation constraint: the existing opening was narrower than the required channel clearance.
- Multimodal gap: people walking or cycling did not have dedicated, protected space across the bridge.
- Low profile: the former bridge’s limited height required more frequent openings for waterway traffic.
What was built on the new bridge?
The replacement is a twin double-leaf trunnion bascule bridge. Each leaf pivots upward around a trunnion to let boats pass, while the twin configuration carries traffic in both directions.
Popular on Amazon
- BUILD A REAL DA VINCI INSPIRED BRIDGE Construct a working model based on Leonardo da Vinci’s famous self-supporting bridge design. This hands-on wooden STEM kit demonstrates real engineering principles through an engaging and rewarding building experience.
- EDUCATIONAL STEM LEARNING EXPERIENCE Explore concepts in engineering, architecture, physics, and history while building. Great for students, hobbyists, makers, homeschool projects, classroom activities, and anyone interested in mechanical design.
- APPROXIMATELY 1 HOUR BUILD TIME Designed to provide an immersive yet manageable project experience. The completed bridge makes an impressive display piece and conversation starter once assembled.
- HIGH-QUALITY WOODEN MODEL KIT – AGE 14+
- Made from durable precision-cut wood components with detailed illustrated instructions. A thoughtful gift idea for teens, adults, engineers, history enthusiasts, and STEM lovers.
| Feature | Replacement specification |
|---|---|
| Main span | 267 feet |
| Total bridge length | 915 feet |
| Roadway | Two 11-foot travel lanes in each direction |
| Bicycle facilities | 7-foot buffered bike lanes in both directions |
| Pedestrian facilities | 8-foot sidewalks separated from traffic by railings or concrete barriers |
| Maximum vertical clearance | Up to 42 feet |
| Navigable channel width | 125 feet |
| Projected operational effect | About 44% fewer bridge openings, according to FDOT |
FDOT’s published comparison states that the replacement provides 125 feet of horizontal clearance versus 90 feet for the existing channel and up to 42 feet of vertical clearance versus 21 feet previously. The higher profile is intended to reduce the number of openings needed for vessels while preserving a movable span for larger traffic.
What other work was included beyond the bridge?
The contract covered approximately 4.1 miles from County Road A1A to S.R. 707/Beach Road. In addition to the main bridge, crews completed roadway, drainage, signalization, lighting, signage, pavement markings and intelligent transportation-system improvements. Surrounding intersections were upgraded, the S.R. 811 bridge was rehabilitated, a new observation pier was added and a riverwalk connection was built beneath the south approach.
Quick wins for a faster PC:
Repair Windows errors before they cause bigger problemsFix Now →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Clear out junk files and repair common Windows errorsFree Scan →When did the Jupiter US 1 bridge reopen?
The bridge closed to vehicle and pedestrian traffic on March 13, 2023. Traffic used Alternate A1A during an approximately 20-month detour while the old bridge was removed and the replacement was built. FDOT’s project page lists December 2025 completion; its November 7, 2025 update reported 94% completion. WFLX reported that FDOT accepted the project on December 19, 2025, ahead of schedule. All lanes had opened in April, with limited nighttime closures remaining for testing and inspection before final acceptance.
Also popular on Amazon
- Build 20 different models that each teach about force, load, compression, tension and more
- Over 285 interchangeable building pieces
- Includes 36-page, illustrated experiment manual and Assembly guide
- Skill level: Intermediate
How was the detour schedule enforced?
FDOT used a direct incentive-and-disincentive structure. The contractor could earn up to $3.5 million if the detour ended in less than 20 months while maintaining one lane in each direction. A $35,000-per-day penalty applied if the detour lasted beyond 20 months.
How did crews build the bascule bridge while keeping the waterway open?
Construction had to accommodate active Atlantic Intracoastal Waterway navigation as well as bridge traffic and environmental restrictions. Engineering News-Record identified several delivery methods that reduced work in the channel and improved control of marine operations.
Precast pier walls installed from barges
Bascule pier walls were precast on barges, then moved onto prepared pier footings with Hillman rollers and come-alongs. This approach shifted substantial fabrication away from the final in-water placement and allowed crews to position heavy elements with controlled, incremental movement.
Also popular on Amazon
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up.
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs.
- PREMIUM SERIES GOLDEN GATE BRIDGE - 2.5 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 14.45 L x 0.94 W x 2.95 H inches. 1:7535 Scale.
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all.
Contained excavation for submarine power cables
Sheet piles contained excavation for submarine power-cable work. The enclosure reduced turbidity and the amount of material excavated, helping protect seagrass, oyster habitat and overall water quality.
Marine coordination around live navigation
Barge movements, Coast Guard bridge-opening moratoriums and marine-safety procedures were coordinated around active navigation. Keeping the waterway operating required work windows and vessel controls that changed with both construction needs and marine traffic.
What changed for bicyclists and pedestrians?
The replacement makes walking and cycling continuous design features rather than afterthoughts. A 7-foot buffered bicycle lane runs in each direction, and an 8-foot sidewalk is separated from moving traffic by railings or concrete barriers. These facilities directly address the former bridge’s lack of dedicated bicycle and pedestrian space and connect with the broader corridor improvements, including the riverwalk link under the south approach.
Also popular on Amazon
- THE WOODEN SYDNEY BRIDGE 3D MODEL KIT COMES WITH UNIQUE DESIGN YOU WILL LOVE - Be proud to display your assembled Sydney 3D Bridge Wood Puzzles and share your love for iconic landmarks in Sydney Australia. This wooden 3d puzzle bridge makes a model kit for kids who loves architecture model kits, bridge building kit, and 3D building sets for adults. Ideal for kids to start getting interested in building bridges or young engineers building kit.
- THE SYDNEY 3D BRIDGE WOODEN MODEL KIT PUZZLE IS FOR EVERYONE WHO LOVES ICONIC PUZZLES - The Sydney Bridge 3D wooden puzzles for adults and kids is a craft kit to build for those who love playing mind games. Parents can gift 3D wooden puzzles, or architecture model building like this Sydney Bridge to improve mental speed and problem solving skills of their kids. A good bonding project for family, or as kids architecture kit project for school.
- INCLUDED WITH THE PURCHASE OF THE 3D BRIDGE WOOD PUZZLE KIT - Includes 1 Sydney 3D Bridge Wood Craft Puzzle Decor Model Kit with 55 unfinished natural wood puzzle pieces, manual, and 1 paper for sanding the edges. This DIY puzzle bridge building kit for kids can be painted or colored for a more personalized look. Most parts doesn't require glue as the pieces are interlocking. It measures 16.54Lx4.13Wx5.31H inches. Paint and Glue not included.
- HIGH-QUALITY WOODEN PUZZLES FOR ADULTS AND KIDS - This miniature iconic 3D Puzzle Sydney Bridge Wood Model Kit is made of high-grade 3mm natural wood. All wooden puzzle pieces are laser cut and sanded thoroughly to ensure smooth edges. This bridge building educational 3D puzzle feature realistic details of the Sydney bridge, like its arch and towers. Playfully paint this architecture puzzle toy bridge model kit for kids after assembling.
- IDEAL USE FOR THE SYDNEY 3D BRIDGE ADULTS AND KIDS WOOD BUILDING KITS - Challenge your kids or even yourself to build this DIY 3D wooden puzzle Sydney bridge. A perfect addition to your kids wood project, wooden building kits for adults, or wooden Australia puzzles collection. This architecture model building kit puzzle toy can help kids develop their skills in building wood bridge, raise their IQ, problem solving, and shape recognition.
Why did the project win an ENR Best Project award?
Engineering News-Record’s 2026 Texas & Southeast Best Projects program selected the Jupiter Federal Bridge Replacement as the Highway/Bridge category winner. The documented reasons are broader than the finished bridge’s appearance: the project combined replacement of a deficient structure, improved multimodal access, a wider and higher navigation channel, a demanding full-closure detour and specialized construction in an active waterway.
- Resilience and condition: it removed a poor-rated 1958 bridge from a critical route.
- Navigation performance: the channel is 125 feet wide with up to 42 feet of vertical clearance, and FDOT projects about 44% fewer openings.
- Public access: buffered bike lanes and protected sidewalks serve both directions.
- Constructability: barge-based precasting and controlled installation reduced difficult in-water work.
- Environmental controls: sheet-pile containment limited turbidity and excavation near sensitive habitat.
- Traffic delivery: incentives and penalties focused the team on ending the Alternate A1A detour within the contractual target.
How should this bridge replacement be compared with other projects?
A useful comparison should look beyond bridge length or construction price. Evaluate the following dimensions together:
| Comparison axis | Questions to ask |
|---|---|
| Structural condition and resilience | Did the project replace a deficient structure, and what service-life or reliability problem did it solve? |
| Multimodal access | Are bike lanes and sidewalks continuous, buffered and usable by people of different abilities? |
| Navigation | What channel width and vertical clearance are available, and how often must the span open? |
| Traffic management | Was a full closure required, how long was the detour, and what controls protected the schedule? |
| Environmental protection | How were turbidity, habitat and water quality managed during marine work? |
| Constructability | Could major elements be prefabricated or installed while the waterway remained operational? |
How much did the project cost?
FDOT lists the construction cost at $122 million. That figure covers the bridge replacement and the associated roadway, drainage, intersection, lighting, signalization, signing, pavement-marking, intelligent-transportation and related corridor work described for the project; it is not a retail price or a cost-per-foot estimate.
Also popular on Amazon
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs
- BROOKLYN BRIDGE – 2 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 5.39"L x 0.91"W x 1.97"H (13.7 x 2.3 x 5 cm)
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all
Frequently Asked Questions
What does “double-leaf trunnion bascule” mean?
It describes a movable bridge with two lifting leaves. Each leaf rotates around a fixed trunnion, allowing the roadway to rise for vessel traffic while the two leaves meet to form the travel surface when closed.
Can boats still use the Atlantic Intracoastal Waterway during bridge construction?
Yes. Navigation remained active during construction, with barge operations coordinated with Coast Guard opening moratoriums and marine-safety procedures. Work sequencing had to account for both construction equipment and passing vessels.
Does the new bridge eliminate all bridge openings?
No. It remains a movable bascule bridge, so openings are still available for vessels that need them. FDOT projects that the greater height and wider channel will reduce the number of openings by about 44%.
Which agencies were responsible for the Jupiter bridge project?
FDOT District 4 was the owner. Johnson Bros. Corp. was the submitting contractor and general contractor, and Hardesty & Hanover LLC served as lead design firm.