What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
The Idaho Transportation Department (ITD) says construction of the I-90/State Highway 41 interchange in Post Falls was completed in October 2026. The $78 million project replaced the former interchange with a signalized single-point urban interchange (SPUI), rebuilt bridges and ramps, widened both highways for future needs, and improved bicycle and pedestrian connections. Drivers should still check Idaho 511 for live lane, crash and weather information because the project page is not a real-time traffic service.
When was the I-90 and State Highway 41 interchange completed?
ITD’s current project information records overall construction as complete in October 2026. The project began construction in 2022 after design work that started in spring 2018 and selection of a preferred alternative in winter 2018.
As an Amazon Associate I earn from qualifying purchases.
Do these 3 things before closing this tab:
1Clear out junk files and repair common Windows errors2Fix the driver behind crashes, sound loss and screen glitches3Repair Windows errors before they cause bigger problemsA milestone during the final phase came on November 19, 2025, when ITD announced that the new westbound I-90 off-ramp to SH-41 would reopen. That announcement anticipated all remaining SH-41 lanes opening in spring 2026; the later project update records the entire interchange program as finished in October 2026.
Is the I-90/SH-41 interchange in Post Falls finished?
Yes. The completed facility is a single-point urban interchange, or SPUI. Instead of spreading ramp movements across separate intersections, the on- and off-ramps meet at one signalized point on SH-41, where traffic movements are coordinated by a single set of signals.
Popular on Amazon
- 25-In-1 Construction Truck Toy Set With Carrier: Includes 12 mini construction trucks and 12 worker figures stored in a large carrier truck. A complete construction toys set featuring excavator, dump truck, bulldozer and more, ideal for kids who love toy trucks and building play
- Enhances Creativity And Hands-On Learning: Made with Alloy metal and durable ABS plastic. Kids can enjoy construction play by using excavators to dig and trucks to move sand. These toy trucks support fine and interactive indoor and outdoor play, including sandbox fun
- Realistic Sound And Light Effects For Interactive Play: Press the roof buttons to activate sound effects, and flashing lights. Some toy cars feature movable parts for a more lifelike experience, making this a fun and engaging car toys set for kids
- Boosts Imagination And Creative Role Play: Kids can create their own construction site, using excavator toys to dig or trucks to transport sand. This construction toy set helps develop creativity, fine , and storytelling during pretend role play activities
- Great Gift For Kids Age 3+: A fun choice for birthdays or everyday surprises, ideal for boys and girls who enjoy construction toys and truck play. Suitable for kids toys boys 3-5, toys for 4 year old boys, and children ages 3 and up
The finished scope includes the interchange itself, the SH-41/Mullan Avenue intersection, highway widening, bridge work and trail improvements. “Crews have finished constructing the I-90/SH-41 Single Point Urban Interchange (SPUI) in Post Falls!” is ITD’s description on its current project page.
What changed at the Post Falls I-90 interchange?
| Feature | Former or construction-era condition | Completed project |
|---|---|---|
| Ramp geometry and control | Existing ramp arrangement and separate movements | All ramps converge at one signalized SPUI point on SH-41 |
| Bridges | Existing bridge structures affected by the reconstruction | Existing bridges were replaced or rebuilt, with new bridge construction included in the project |
| SH-41 access | Access patterns changed repeatedly during construction | SH-41 was widened to Mullan Avenue and the SH-41/Mullan Avenue intersection was completed |
| I-90 capacity planning | Existing roadway footprint | I-90 was widened with room for future expansion |
| Walking and cycling | Existing SH-41 Trail and Centennial Trail connections | Trail facilities were upgraded to improve pedestrian and bicycle connectivity |
ITD has not published a before-and-after travel-time percentage for the interchange. The project’s documented benefits are the new geometry, rebuilt structures, additional roadway width and improved nonmotorized connections rather than a guaranteed delay reduction figure.
Also popular on Amazon
- 42PCS Road Magnetic Tiles: Our mini magnetic tiles set packs 42 versatile magnetic blocks, 3 realistic engineering vehicles, and a 2-in-1 storage & building base. This complete construction toys set lets kids build sprawling road scenes, busy construction sites, and custom creations
- Travel Magnetic Tiles: Your Secret Weapon for Stress-Free Family Travel. Say goodbye to road trip tantrums, restless flights, and fussy restaurant waits! These must-have travel toys for kids fit effortlessly into backpacks, suitcases. The included storage case doubles as a super stable building base, so kids can build, create, and stay entertained anywhere – no more loose pieces scattered across the car floor, no more messy cleanups, just smooth, happy travels for the whole family
- STEM Playtime: Perfect Magnetic Tiles for Kids Ages 3+. Our road magnetic tiles turn boring screen time into thrilling, hands-on learning! As your child snaps, stacks, and builds, they’ll develop fine motor skills, spatial awareness, logical thinking, and boundless creativity – all while learning basic engineering concepts, traffic rules, and color recognition. It’s the ideal STEM toy for curious kids ages 3+, perfect for both solo play and fun parent-child bonding time
- Vibrant Road Theme Mini Magnetic Tiles: Got a kid obsessed with all things cars, trucks, and construction? These mini magnetic tiles are made for them! Featuring vivid, kid-approved road patterns, fun construction prints, and 3 detailed mini engineering vehicles, this set lets kids bring their imaginative stories to life. Watch as they build their own busy construction zones, winding city roads, towering bridges, and more – every build is a new adventure
- Safe, Durable & Gift-Ready: Our travel magnetic tiles are crafted from high-quality, non-toxic material with ultra-smooth rounded edges, and fitted with strong, long-lasting magnets that keep builds stable and secure – no more wobbly structures that collapse mid-play. Compatible with most mini magnetic tile sets, this durable construction toys set comes neatly packaged, making it the perfect birthday Christmas gift for little builders who love to create
How does the new SPUI work?
In a SPUI, traffic from the freeway entrance and exit ramps is brought to one large, signal-controlled intersection. Through traffic on SH-41 and ramp traffic receive signal phases, allowing opposing turns to be managed at the same location. The design can make the interchange more compact than a layout with two closely spaced ramp intersections, but drivers must follow the signal indications and lane markings carefully.
What roadway and trail work was included?
- Replacement and construction of interchange bridges.
- Realignment of on-ramps and off-ramps.
- Widening of I-90 to support future expansion.
- Widening of SH-41 south to Mullan Avenue.
- Completion of the SH-41/Mullan Avenue intersection.
- Upgrades to the SH-41 Trail and Centennial Trail facilities for safer pedestrian and cyclist connectivity.
The trail work is part of the interchange project rather than a separate unrelated improvement, so people walking or cycling through the corridor should use the completed connections and obey posted crossings and signals.
Also popular on Amazon
- 41-PIECE JOBSITE IN A BOX: Set includes two exclusive 6" XL construction toy machines (crane + excavator), ten 3" Little Machines vehicles, and 29 construction accessories for an instant worksite.
- ARTICULATED XL CONSTRUCTION VEHICLES: Working booms, buckets and hooks let kids dig, lift and haul boulders just like real Cat equipment, no batteries required.
- AUTHENTIC SITE DETAILS: Road signs, cones, barrels and barricades turn carpets, sandboxes or kinetic-sand bins into realistic construction zones that fuel imaginative play.
- BUILT CAT TOUGH: High-quality plastics withstand rough indoor or outdoor play; small size fits diaper bags, makes perfect cake-topper decor and packs easily for travel.
- STEM-FRIENDLY FUN: Sorting pieces, moving cranes and planning roads boost fine-motor skills, spatial reasoning and cooperative play for boys and girls ages 3 +.
How much did the project cost and how was it funded?
ITD lists the project cost as $78 million and identifies Scarsella Brothers, Inc. as the awarded contractor. Funding came through Transportation Expansion and Congestion Mitigation (TECM) funds under Governor Brad Little’s Leading Idaho initiative. The published figure is the project total identified by ITD; it is not a current toll, user fee or charge to drivers.
What traffic disruptions occurred during construction?
Construction required temporary traffic controls that are no longer evidence of current conditions. ITD reported a westbound I-90 off-ramp closure with detours to the Seltice Way interchange, a temporary closure of SH-41 beneath I-90 with diversion to Greensferry Road, changes to Central Avenue access and overnight I-90 lane restrictions.
Also popular on Amazon
- 12P Diecast Construction Toys: This 12 pieces construction toys car set, including Excavator, Mixer, Roller, Forklift, Crane, Dump Truck Toy etc. Using classic colors, it looks more realistic, and your child can pretend to be a little construction engineer, creating their own world of architecture. You deserve to have such a set of construction alloy toy cars.
- Great Gift for Kids Toddlers: Our 12p Construction Truck Toy Set is not only suitable for various occasions such as sandbox toys, outdoor sand digging, beaches, etc., but also perfect as party gifts, cake accessory decorations, children's birthday parties, carnival prizes, school classroom rewards, gift bag fillers, and Christmas stocking fillers. This will be a very interesting gift, your child will definitely love it.
- Alloy Diecast Construction Truck: Let your child learn about amazing construction projects from a young age. All of our toy cars look very realistic, and some parts of each car are rotatable and adjustable. Children can learn about architectural scenes and vehicle functions, while also better cultivating their hands-on abilities and fine motor skills.
- Mini Car Toys: Our construction vehicles have bright and durable metal body shells and plastic bases and components, with smooth edges, making them perfect for toy cars for children aged 3-5. Our mini alloy construction toy car is perfect for children's small hands to grip and carry in their pockets, making it very easy to carry.
- Size Suitable for Toddlers: The size and color scheme of this engineering car toy set are carefully designed toy cars for young children. Whether the construction vehicle is playing indoors or outdoors, it can make it easy for children to get started, which is very suitable for boys and girls.
Those measures describe earlier work stages, not a standing closure schedule. Check Idaho 511 immediately before traveling for current incidents, maintenance, weather restrictions, lane status and any post-construction adjustments.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What should drivers, pedestrians and cyclists do now?
- Use the new signalized ramp intersection as signed and stay in the lane indicated for your destination.
- Allow extra attention at the SH-41/Mullan Avenue intersection while becoming familiar with the completed markings.
- Do not rely on historic detour instructions; verify live conditions through Idaho 511.
- At trail crossings, obey pedestrian signals, yield as directed and watch for turning vehicles entering or leaving the SPUI.
- For oversized loads or commercial trips, confirm current restrictions and route requirements before departure because a completed project does not eliminate temporary maintenance controls.
Frequently Asked Questions
Why was a SPUI selected for the Post Falls interchange?
The documented project description establishes the selected SPUI layout and its single signalized control point, but ITD’s public summary does not assign a specific percentage benefit or publish a formal alternatives scorecard. It is therefore more accurate to describe the design and scope than to promise a particular delay reduction.
Also popular on Amazon
- 16 PIECE WOODEN SIGN SET - Includes 7 Construction Signs, 4 Road Closed Signs, and 5 Traffic Cones
- DURABLE AND STRONG - Zany Trains Traffic Signs are made of wood, not plastic.
- WOODEN CONSTRUCTION SIGNS HELP WITH CREATIVITY TO MAKE THE MOST EXCITING AND FUN WOODEN CITY! Construction Signs and cones add creative destinations to your design.
- COMPATIBLE WITH ALL WOODEN TRACK SYSTEMS - Zany Trains wooden Traffic Signs and track is 100% compatible with all wooden railway toys, track and pieces.
- 100% REAL WOOD DESIGN, SAFE + NON TOXIC FOR KIDS - All pieces and accessories are compliant with US Safety Standards.
Does the October 2026 completion date mean every nearby road project is finished?
No. The date applies to the I-90/SH-41 interchange project recorded on ITD’s project page. Separate maintenance, utility or local street work can still affect the corridor, so current conditions must be checked independently.
Where can I find the old detour routes?
The former Seltice Way and Greensferry Road detours were temporary construction measures. They may remain in archived notices, but they should not be used as navigation instructions unless Idaho 511 or a current agency notice activates them again.
Free tools Windows power users keep installed
One-click scans. No signup required.
Are the trail improvements open to both bicycles and pedestrians?
ITD describes upgrades to the SH-41 Trail and Centennial Trail facilities for pedestrian and cyclist connectivity. Users should follow the signed path, crossing signals and any locally posted operating restrictions at the interchange.

