Healthcare construction in an occupied facility succeeds when patient safety and clinical continuity are designed into the project before demolition begins. The practical starting point is a facility-specific infection-control risk assessment (ICRA), followed by phasing, circulation, containment, ventilation, communication, and contingency plans agreed by clinical, infection-prevention, engineering, facilities, and construction leaders.
There is no universal sequence or barrier specification that fits every hospital, clinic, laboratory, or long-term-care setting. The risk depends on the work, nearby patients and services, airflow and utility connections, and the routes used by people and materials. Use this guide to organize the planning conversation, then have the facility’s professionals and authority having jurisdiction (AHJ) approve the final controls.
As an Amazon Associate I earn from qualifying purchases.
What does healthcare construction around ongoing patient care require?
It requires treating the building as an operating care environment rather than an empty job site. Before work starts, the team should define the project, identify who could be exposed and how, decide which services must remain open, and document controls for dust, moisture, airflow, noise, vibration, utilities, access, cleaning, and emergency response.
The central decision is not simply where to put a wall. It is how construction activity could affect patients, staff, visitors, supplies, clinical routes, and building systems outside the immediate work area. CDC guidance recommends an ICRA before construction, renovation, remediation, repair, or demolition begins. Its construction recommendation states: Before the project gets underway, perform an ICRA to define the scope of the project and the need for barrier measures.
Read the CDC environmental infection-control recommendations with the facility’s policies and local requirements.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
How do you start a hospital or clinic construction plan?
Start by writing an operational project brief and using it to convene the ICRA team. The brief should be specific enough to expose conflicts before they become field problems.
- Describe the work. Record the location, floors and rooms, demolition or installation methods, expected duration and working hours, utility tie-ins, shutdowns, deliveries, debris handling, and any work above or below occupied areas.
- Map what must stay open. List departments, beds, procedure rooms, diagnostic services, pharmacies, laboratories, public areas, staff spaces, storage, and emergency routes that cannot be interrupted or that require advance notice.
- Identify exposure pathways. Mark doors, shafts, ceiling plenums, shared mechanical systems, water lines, elevators, corridors, loading docks, and vertical or horizontal adjacencies that could carry dust, moisture, odors, noise, vibration, people, or contaminated material.
- Set decision owners. Assign who approves the ICRA, permits shutdowns, accepts a temporary barrier, authorizes a patient move, stops work, and releases an area for reoccupation.
- Choose review points. Schedule reassessments before mobilization, before each phase, after utility or HVAC changes, and whenever the scope, patient mix, route, or building condition changes.
ASHE’s ICRA 2.0 Toolkit describes a repeatable approach: identify hazards; determine who might be harmed and how; evaluate the risk and precautions; record findings, actions, and responsible people; then review and update the assessment as conditions change.
Who should be on the ICRA and project team?
The team should combine clinical knowledge with building-science and construction expertise. The exact membership follows the facility’s policy and the project, but these roles are commonly needed:
| Role | Planning contribution |
|---|---|
| Clinical or department leaders | Identify essential services, patient-flow constraints, scheduling windows, and acceptable downtime. |
| Infection prevention and control | Lead or approve the ICRA, define infection-control precautions, assess vulnerable populations, and set escalation criteria. |
| Facilities and engineering | Analyze HVAC, pressure relationships, utilities, fire and life-safety systems, access, and temporary services. |
| Construction manager and contractors | Translate controls into means and methods, work sequencing, worker training, logistics, housekeeping, and daily verification. |
| Environmental services | Define cleaning frequencies, terminal cleaning, debris routes, and release criteria. |
| Safety, quality, risk, or emergency-management staff | Coordinate permits, incident reporting, emergency plans, and regulatory or insurance requirements. |
| Facilities administration | Resolve competing operational priorities, approve relocations, and coordinate notices with affected departments. |
Include the people who can make a decision during an overnight shift, not only those who attend design meetings. A project with an occupied intensive-care area, operating room, emergency department, dialysis service, or protective-environment space may need more specialized review than work in an administrative suite.
What areas and patients should the risk assessment cover?
Assess more than the room behind the construction barrier. CDC and ASHE materials emphasize the possibility of effects in adjacent spaces and in areas above or below the work. Draw a zone of influence that includes shared air, water, power, fire protection, structure, access, and material-handling paths.
Inventory patients who could be unusually susceptible to dust, mold, aerosols, waterborne organisms, temperature changes, noise, or delayed access. Depending on the facility, this may include immunocompromised patients, transplant recipients, intensive-care patients, neonates, oncology patients, burn patients, and people requiring procedural or life-support equipment. Do not use a generic list as a substitute for the facility’s clinical assessment; identify the actual patients and services affected during each phase.
Free tools Windows power users keep installed
One-click scans. No signup required.
Also locate clean and sterile supplies, medication storage, food service, linen, waste holding, oxygen and medical-gas infrastructure, laboratories, and sensitive equipment. A construction activity can create a risk through a delivery route or ceiling void even when no patient room is inside the work zone.
How do you phase construction without disrupting clinical operations?
Build the sequence with facility administration and affected departments, using clinical consequences—not contractor convenience alone—as the constraint. The right approach depends on which services must remain open, whether swing space exists, and how much dust, moisture, noise, vibration, or utility disruption each activity creates.
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
Common planning choices include:
| Approach | Questions to resolve before selecting it |
|---|---|
| Work in small occupied zones | Can barriers, routes, pressure control, and cleaning be maintained while neighboring care continues? Can the phase be completed before conditions or patient acuity change? |
| Decant a department into swing space | Is the temporary location licensed, staffed, equipped, accessible, and connected to required utilities and clinical systems? How will patients, records, supplies, and emergency access move? |
| Schedule disruptive work during low-demand periods | Does the proposed window actually reduce clinical risk, or does it leave fewer staff and slower response capacity? What work must still occur during normal hours? |
| Use enabling work before the main renovation | Can temporary ventilation, power, plumbing, access, or egress be installed and commissioned before the affected service is disturbed? |
Sequence enabling work first where it reduces exposure or downtime, but do not assume a preferred sequence applies everywhere. Reconfirm the ICRA and operational plan at each phase gate. If a department’s patient population or service demand changes, the approved sequence may no longer be safe.
How should patient, staff, visitor, and construction routes be separated?
Draw separate routes for patients and families, clinical staff, contractors, deliveries, clean supplies, waste, and debris wherever the building allows. CDC recommends directing pedestrian traffic away from construction zones and, when practical, giving construction crews designated entrances, corridors, and elevators.
- Mark every route on a current floor plan, including temporary doors, elevators, stairs, loading areas, and emergency exits.
- Walk the routes with nursing, transport, environmental services, security, and the contractor. Check turning space for beds and equipment, sight lines, door hardware, hand hygiene access, and after-hours lighting.
- Post plain-language warnings and detour signs before the route changes. Tell staff where to send patients, specimens, medications, supplies, and waste.
- Control access with the facility’s approved badging, escort, sign-in, and delivery procedures. Keep construction visitors out of patient-care areas unless their task requires entry.
- Recheck routes after each barrier move, utility shutdown, delivery change, or emergency event.
Do not let a convenient debris path cross a clean supply route or a public waiting area. Secure debris before it leaves the work zone, use covered carts or containers as required by the ICRA, and coordinate movement times with clinical operations.
Which containment and cleaning controls should be specified?
The ICRA should determine the barrier type, dust and moisture controls, pressure strategy, filtration, cleaning frequency, worker practices, and monitoring method. A physical barrier by itself is not a complete control if doors are propped open, penetrations are unsealed, or debris travels through a shared corridor.
Specify, in writing:
- Where barriers begin and end, how penetrations and ceiling conditions are sealed, and how temporary doors are operated.
- How dust, moisture, odors, noise, and vibration will be limited for the adjacent clinical spaces.
- Whether the work zone requires negative airflow, how pressure or airflow will be checked, and who records the checks.
- Where workers change clothing or footwear, perform hand hygiene, and clean tools before leaving.
- How the work zone, entrances, carts, elevators, and adjacent surfaces are cleaned during and after each shift.
- How wet work, water intrusion, leaks, and unexpected mold or damaged materials are reported and contained.
- How debris is packaged, staged, moved, and disposed of without passing through protected routes.
CDC guidance addresses preparation, worker training, notices, high-risk patient relocation when indicated, adherence monitoring, work-zone cleaning, and debris control. ASHE lists examples such as minimizing dust, cleaning after work, maintaining negative air pressure, and using HEPA-equipped filtration when selected by the risk process. These are examples to evaluate—not a universal checklist or a guarantee that one product or barrier arrangement is adequate.
How do ventilation and HVAC controls protect patient care?
Coordinate every HVAC intervention with infection prevention and engineering. The team should preserve required pressure relationships and critical ventilation, understand which rooms share equipment, and plan for temporary or emergency ventilation before a shutdown occurs.
Recommended Free Tools
The CDC air guidance recommends avoiding shutdown of an entire HVAC system at once where feasible and describes portable units for areas without installed emergency ventilation. It also discusses allowing time for air clearance after systems restart. The facility engineer and infection-prevention professional must set the applicable pressure, filtration, monitoring, and restart criteria; do not publish a generic air-change target or assume a portable unit substitutes for a designed system.
- List every air-handling unit, exhaust fan, pressure relationship, filter bank, and control point affected by the work.
- Identify the clinical rooms that depend on each system and the consequences of losing it.
- Plan isolation, temporary conditioning, alarms, and backup power before the shutdown permit is approved.
- Verify barriers and airflow before work begins and after any change to doors, ceilings, ducts, or equipment.
- Document restart, stabilization, air-clearance, and clinical sign-off requirements before patients return.
When should patients be relocated?
Relocation is appropriate when the risk cannot be controlled reliably in place or when a required utility, route, ventilation condition, or clinical service will be unavailable. The ICRA and clinical leadership should identify high-risk patients and establish triggers before construction starts.
Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
For each possible move, confirm the destination’s staffing, monitoring, equipment, oxygen and medical-gas capacity, medication access, emergency response, accessibility, infection-prevention requirements, and bed availability. Plan transport routes and receiving-team handoffs in advance. Include a process for returning patients only after the area is cleaned, inspected, systems are restored, and the responsible clinical and infection-control leaders release it.
Relocation decisions should be revisited when patient acuity changes, a barrier fails, water enters the work area, ventilation is lost, or the schedule slips into a different clinical period. A preapproved escalation list helps staff act quickly without improvising authority.
Windows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallCrashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minuteHow should construction contracts assign infection-control responsibilities?
Make the ICRA and infection-control requirements contract documents, not informal advice. The agreement should identify the controls, submittals, training, inspections, records, notification rules, and consequences of noncompliance.
Define at least:
- Who supplies, installs, inspects, and maintains barriers, pressure monitors, filtration, floor protection, and temporary doors.
- Who trains workers before entry and how attendance and competency are recorded.
- Who performs daily checks, who reviews them, and where records are stored.
- Who can pause work when a control fails and who authorizes restart.
- How the contractor reports dust migration, leaks, failed pressure, unplanned alarms, route breaches, injuries, or utility interruptions.
- How subcontractors, deliveries, off-hours work, and emergency call-ins follow the same requirements.
- What cleaning, inspection, testing, commissioning, and clinical release are required at phase completion.
CDC recommends educating construction and healthcare staff, using contract requirements for infection-control adherence, providing notices and detours, monitoring controls, and correcting problems promptly. The project manual should turn those expectations into named people, response times, forms, and escalation contacts.
How do you monitor controls while work is underway?
Monitoring should combine scheduled inspections with continuous awareness by the people who occupy adjacent areas. A daily log can include barrier condition, doors, pressure or airflow indicators where applicable, dust or moisture observations, cleaning completion, route status, debris movement, alarms, complaints, and corrective actions.
Use a short field checklist at the start of each shift and after deliveries or major tasks. Ask clinical staff whether they see dust, odors, unusual noise, vibration, temperature changes, blocked access, or delays. Treat those reports as operational data, not as nuisance complaints. Trend repeated issues by phase, location, subcontractor, or time of day so the team can correct the underlying method.
Set stop-work and escalation thresholds before mobilization. Examples might include a breached barrier, loss of required pressure, uncontrolled water, contamination of a clean route, failure of critical ventilation, or an unplanned utility interruption. The exact thresholds belong in the facility plan and must be approved by infection prevention, engineering, and clinical leadership.
What should happen when a barrier or ventilation control fails?
Protect patients first, then stabilize the environment and investigate. A practical response sequence is:
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
- Stop the activity creating or spreading the hazard and secure the work area.
- Notify the designated clinical, infection-prevention, facilities, safety, and construction contacts.
- Assess whether patients, staff, supplies, air systems, water systems, or routes were exposed.
- Provide temporary controls—such as sealing the breach, isolating a room, rerouting traffic, restoring ventilation, or moving patients—only under the facility’s approved direction.
- Clean and remediate the affected area, verify system performance, and document the event.
- Conduct a cause review and revise the method, phase, training, or contingency before restart.
Do not restart solely because the scheduled shift is ending. Restart requires the authority named in the project plan and evidence that the failed control is restored.
What contingencies should be ready before mobilization?
Write a contingency for every system or route whose loss could interrupt care. At minimum, address ventilation and pressure, water supply or drainage, electrical power, medical gases, fire protection, elevators, access and egress, communications, temperature control, infection-control barriers, and patient transport.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
For each contingency, record the trigger, immediate safe action, backup capacity, notification tree, vendor or facilities contact, clinical decision-maker, and recovery test. Include after-hours numbers and a plan for a project delay. A temporary system that has never been commissioned or a route that has never been walked is not a reliable contingency.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Can a portable HEPA air-filtration unit make construction safe?
A portable HEPA air-filtration unit can be one element of an ICRA-selected control strategy, particularly where installed emergency ventilation is unavailable. It does not replace sealed containment, correct airflow, housekeeping, route control, or engineering review.
Before selecting equipment, have engineering and infection prevention define the required duty, placement, exhaust or recirculation arrangement, electrical supply, noise tolerance, filter-management procedure, alarm response, and verification method. The same rule applies to temporary construction barriers and dust-containment supplies: facility policy, the ICRA, and local approvals determine whether a product is suitable.
How do you verify codes, permits, and AHJ requirements?
The applicable code edition, licensing rule, state requirement, fire marshal condition, and AHJ approval cannot be inferred for an unspecified facility. Have the owner’s architect, engineer, infection-prevention professional, facilities team, and AHJ confirm requirements for the jurisdiction and care setting.
The Tool Desk
Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Check permits and reviews for building work, fire and life safety, infection control, hazardous materials, utilities, temporary egress, medical gases, accessibility, elevator use, and any clinical licensing implications. Keep approved drawings, ICRA records, shutdown permits, inspection logs, training records, incident reports, and release documentation together so the team can demonstrate what was planned and what changed.
What should be on the preconstruction and phase-gate checklist?
- Project scope, work hours, methods, affected floors, services, and utilities are documented.
- An interdisciplinary ICRA is approved, with hazards, exposed groups, controls, owners, and review dates.
- Vulnerable patients, critical rooms, supplies, clean routes, and spaces above and below the work are mapped.
- Clinical phasing, swing space, relocation triggers, and service-continuity decisions are approved.
- Patient, staff, visitor, contractor, supply, waste, and debris routes are drawn, walked, signed, and communicated.
- Barrier, pressure, filtration, cleaning, moisture, debris, and monitoring requirements are in the contract and work plan.
- HVAC, utility, fire, power, medical-gas, access, and egress effects are reviewed by qualified facility staff.
- Worker and clinical-staff education is complete, with attendance records and an after-hours contact list.
- Daily inspections, incident reporting, stop-work authority, corrective actions, and restart approval are defined.
- Contingencies are commissioned, tested, and available before the affected service is disturbed.
- Phase completion includes cleaning, system verification, inspection, documentation, and clinical release.
- The ICRA and operational plan have a scheduled review whenever scope, routes, systems, or patient conditions change.
How should the plan be handed over to operations?
Close each phase with a documented handover rather than a contractor statement that the work is finished. Provide updated drawings, equipment information, control settings, filter and maintenance details, utility-isolation records, cleaning and inspection evidence, unresolved items, and emergency contacts.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
Walk the released area with clinical users, infection prevention, engineering, environmental services, and facilities administration. Confirm that doors, alarms, pressure relationships, emergency routes, nurse-call or communications systems, medical gases, lighting, and access controls work as intended. Record who accepted the area and what restrictions remain.
After occupancy resumes, schedule a follow-up review. Early operational feedback can reveal a route conflict, noise problem, temperature issue, or maintenance burden that was not visible during construction. Feed those findings into the next phase’s ICRA instead of treating them as isolated defects.
What is the bottom line for planning healthcare construction?
Protecting ongoing patient care is a management system, not a single barrier or piece of equipment. Begin with an ICRA and a multidisciplinary team; assess spaces and systems beyond the footprint; phase around real clinical demand; separate routes; coordinate ventilation and utilities; write responsibilities and stop-work authority into the contract; monitor controls every day; and prepare patient-relocation and service-continuity contingencies before work starts.
Frequently Asked Questions
How early should an ICRA be completed for a healthcare renovation?
Complete the initial ICRA during project definition and design, before procurement, mobilization, or demolition. Revisit it at phase gates and whenever the scope, patient population, route, building system, or work method changes.
Who has authority to stop an occupied healthcare construction project?
The facility should name stop-work authority in its project plan and contract, typically involving infection prevention, facilities or engineering, clinical leadership, and the construction manager. The authority should apply at any hour and include a clear restart-approval process.
What records should a hospital retain during phased construction?
Retain the approved ICRA and revisions, drawings and route plans, permits, shutdown approvals, training logs, inspection and pressure records, cleaning and debris logs, incidents, corrective actions, patient-relocation decisions, and phase-release sign-offs. These records help operations teams manage later phases and demonstrate compliance to reviewers.
Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Scan for outdated or missing drivers - takes under a minute3Clear out junk files and repair common Windows errorsHow can a facility reduce noise and vibration during occupied renovation?
Identify vibration- and noise-sensitive rooms and equipment during the risk assessment, then coordinate work windows, methods, temporary isolation, and advance notices with the affected departments. Establish complaint and escalation channels so the team can change the method when disturbance threatens care or diagnostics.