Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversBlack Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
BETTESWORTHConstruction

How to Clear a Renovated Public Building for ADA-Compliant Reopening

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

An accessibility checklist for reopening a renovated public building is a documented walk against the 2010 ADA Standards, the applicable alteration rule, and the building codes your jurisdiction adopted—not a single Department of Justice form. If construction started on or after March 15, 2012, the altered work is designed to the 2010 Standards. When the renovation changes a primary-function area, the connected path of travel must also be upgraded to the maximum extent feasible, with a 20% disproportionate-cost limit and a defined spending priority.

What standard governs a reopening now?

First identify who operates the facility and when physical construction began. A state or local government building is generally covered by Title II (28 CFR 35.151); a privately owned place customers or visitors enter is generally a Title III place of public accommodation (28 CFR 36.402 and 36.403). Both use the 2010 ADA Standards for new construction and alterations that started on or after March 15, 2012. The U.S. Department of Justice describes those Standards as the minimum scoping and technical requirements for facilities to be readily accessible and usable by people with disabilities (2010 ADA Standards).

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • Work begun before September 15, 2010 may be governed by the 1991 Standards or UFAS.
  • Work begun from September 15, 2010 through March 14, 2012 could use the 1991 Standards, UFAS, or the 2010 Standards.
  • Work begun on or after March 15, 2012 uses the 2010 Standards. Razing a structure or ceremonial groundbreaking does not, by itself, start physical construction.

The 2004 ADA Accessibility Guidelines appendices adopted into the 2010 regulation control for DOJ-regulated facilities; later Access Board revisions do not become the federal reopening standard until DOJ adopts them. A newer Access Board guideline can be useful design information, but it is not a substitute for the adopted regulation.

Keep ADA compliance separate from permitting. ICC A117.1 and the International Building Code apply as your state or locality adopts them. A permit can issue while a project still violates the federal ADA. Where the adopted code is stricter, such as an additional vertical grab bar or a family toilet room in certain assembly and mercantile occupancies, design and inspect to the stricter requirement as well. Confirm the edition your jurisdiction has adopted rather than assuming a national edition.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

When does a renovation trigger a path-of-travel upgrade?

An alteration that affects, or could affect, usability or access must make the altered portion accessible to the maximum extent feasible. If the work alters an area containing a primary function—a major activity for which the facility exists—the path of travel to that area must also be upgraded, unless the additional work is disproportionate. Examples include a cafeteria dining area, conference-center meeting rooms, public-service offices, and a bank customer-service lobby. Corridors, entrances, mechanical and boiler rooms, storage, janitorial closets, employee lounges, and ordinary restrooms are not primary-function areas (a restroom can be primary where providing restrooms is the facility’s purpose, such as a highway rest stop).

The path of travel is the continuous, unobstructed pedestrian route from an exterior approach, sidewalks, streets and parking, through an entrance, to the altered area and the rest of the facility. It includes walks, curb ramps, ramps, clear floor paths, elevators or lifts, and the restrooms, public telephones and drinking fountains serving the altered area.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The 20% rule is narrow: path-of-travel work is deemed disproportionate when its cost exceeds 20% of the cost of the alteration to the primary-function area (28 CFR 35.151(b)(4)(iii)(A)). It is not a waiver for the renovated room itself. Make the altered room compliant to the maximum extent feasible, then spend path-of-travel dollars in this order:

  1. An accessible entrance.
  2. An accessible route to the altered area.
  3. At least one accessible restroom for each sex, or one unisex restroom when only unisex rooms are provided.
  4. Accessible public telephones.
  5. Accessible drinking fountains.
  6. When possible, parking, storage and alarms.

Record the primary-function construction cost, every path-of-travel item and cost, and the calculation before reopening. The project cannot evade the rule by splitting one undertaking into small contracts. If related primary-function alterations occurred on the same path during the preceding three years, aggregate alterations undertaken on or after March 15, 2011, when testing disproportionality.

Title II’s path-of-travel provision applies only to alterations undertaken for purposes other than meeting program-accessibility obligations under §35.150. Have counsel or the public entity’s ADA coordinator address that cross-reference rather than assuming the 20% calculation applies in every Title II project.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

Does the 1991 safe harbor excuse existing features?

Only in limited circumstances. Title II protects path-of-travel elements constructed or altered to the 1991 Standards or UFAS before March 15, 2012 from incremental 2010 upgrades solely because a primary-function area is later altered. Title III’s parallel rule refers to elements built or altered to the 1991 Standards and does not repeat UFAS or the March 15, 2012 wording. The Northwest ADA Center’s 2014 checklist explains the practical element-by-element approach: an element that complied with the 1991 Standards need not be changed merely for a later 2010 difference, but altering that element ends its safe harbor. Elements not covered by the 1991 Standards do not receive this protection. Do not design new work to the 1991 rules.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How should the reopening walk check arrival routes and surfaces?

Walk every site arrival point: accessible parking, passenger loading, public sidewalks and streets, and each public-transportation stop. At least one accessible route must connect those points to an accessible entrance, and an interior circulation path must remain interior. A site reached only by a vehicular way with no pedestrian access does not require a pedestrian route; a parking lot intended for pedestrians does.

  • Route width is 36 inches minimum continuously. A 32-inch narrowing is allowed for no more than 24 inches.
  • Provide a 60-by-60-inch or T-shaped passing space at least every 200 feet. A 180-degree turn around an obstruction narrower than 48 inches needs 48 inches at the turn and 42 inches approaching it, unless the turn itself is 60 inches clear.
  • Walking surfaces, egress stairs, parking spaces, aisles and loading zones must be stable, firm and slip resistant. The Standards set no coefficient-of-friction number; specify a surface that remains slip resistant in expected conditions and maintain coatings.
  • Carpet pile is no higher than 1/2 inch to the backing, cushion or pad. Fasten it against buckling and trim exposed edges securely.
  • Grates and openings reject a 1/2-inch sphere; elongated openings run perpendicular to travel.
  • A change up to 1/4 inch needs no edge treatment; up to 1/2 inch must be beveled no steeper than 1:2. Higher changes require a ramp, curb ramp or walk at no more than 1:20.

Common-use circulation paths inside employee work areas of 1,000 square feet or more (measured to permanent walls, partitions, counters, casework or furnishings) must be accessible. Smaller or weather-exposed work areas still need an accessible approach, entrance, exit and means of egress under the applicable building code.

What ramp and curb-ramp measurements must pass?

Any running slope steeper than 5% is a ramp. Use a uniform running slope no steeper than 1:12, cross slope no steeper than 1:48, 36-inch clear width, and no more than 30 inches of rise per run. Level landings are required at the top and bottom and at direction changes; a turning landing is at least 60 by 60 inches. Handrails are required on both sides when rise exceeds 6 inches, are 34–38 inches high, continuous and non-abrasive, and need edge protection.

There is no total ramp-length limit, but long multi-run ramps can be strenuous. In alterations, a top landing that cannot fit may require compliant side flares. Built-up curb ramps cannot project into parking spaces, aisles or traffic lanes; diagonal ramps need a 48-inch bottom clear space and a 24-inch curb segment beyond each flare. Detectable warnings are required at transit facilities covered by Department of Transportation standards, not automatically at every DOJ-only curb ramp. Check the governing transportation standard for a public sidewalk or transit project.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

Are entrances, doors and security systems ready?

In new construction, at least 60% of public entrances must be accessible, in addition to entrances serving parking, pedestrian tunnels, elevated walkways and individual tenancies. In an alteration, provide an accessible entrance when an existing entrance is altered without a compliant alternative, when an entrance is added, or as required for the path of travel. A qualified historic building may use a non-public entrance only when the State Historic Preservation Official or Advisory Council determines that a public entrance would threaten historic significance; a locked alternative needs notification or remote monitoring.

  • Security bollards, screening and queue equipment cannot obstruct the route or accessible egress. A person diverted around a metal detector must retain an equivalent view of personal belongings.
  • Two-way communication systems at every entrance, including inaccessible ones, need audible and visible signals; handset cords are at least 29 inches. Operable parts at accessible entrances meet the reach and force rules.
  • At least one door, doorway or gate at each accessible room, space and entrance must provide the required clear width. Confirm the 32-inch minimum clear width at 90 degrees in the adopted Standards text before recording a field result.
  • Hardware operates with one hand, without tight grasping, pinching or twisting, at no more than 5 lbf; operable parts are 34–48 inches high. Round knobs generally fail because they require twisting.
  • Interior door opening force is 5 lbf maximum; fire doors use the minimum force allowed by code, and no maximum is specified for exterior hinged doors. Retract the latch, place a gauge about 2 1/2 inches from the latch edge, push slowly perpendicular to the face, and remove it at 70 degrees, following the Access Board measurement method.
  • New thresholds are 1/2 inch maximum; altered thresholds may be 3/4 inch maximum when beveled 1:2 on both sides. Doors in series have at least 48 inches plus the width of a door swinging into the space. Keep the 10-inch bottom push side smooth and maneuvering clearances free of furniture and level changes.

When is vertical access required?

Title II and Title III have different story exceptions. A government building generally needs an accessible route between stories; the exception is a building of no more than two stories where the other story has no public-use space and an occupant load of five or fewer. Title III facilities under three stories or under 3,000 square feet per story may omit an inter-story route, except for shopping centers or malls with five or more sales or rental establishments, professional health-care offices, and public-transit facilities or airport terminals. A mixed-use building loses the exception on any story whose occupancy does not qualify.

Adding a stair or escalator where none existed, with major structural modification, separately triggers a route to every level it serves unless a compliant route is already present. Stories excluded from vertical access still meet all other Standards.

How do you verify parking and loading?

Count each parking facility separately, including employee and restricted lots. At least one of every six accessible spaces, or fraction of six, is van accessible. Van spaces add 3 feet of width, may share an aisle, and require 98 inches of vertical clearance from space through route to an exit. The basic table is:

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Total spaces Accessible spaces Van spaces
1–25 1 1
26–50 2 1
51–75 3 1
76–100 4 1
101–150 5 1
151–200 6 1
201–300 7 2
301–400 8 2
401–500 9 2

Facilities over 500 spaces use the continuing federal table; verify the footnotes before applying larger rows. Hospital outpatient facilities need accessible patient and visitor parking equal to at least 10%; qualifying rehabilitation and outpatient physical-therapy facilities need at least 20%. Other medical offices use the ordinary table.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

Place spaces on the shortest accessible route to an accessible entrance and disperse them when parking serves multiple entrances. A garage and surface lot are separate facilities. Signs show the International Symbol of Accessibility; van spaces also say “van accessible.” Mount signs at least 60 inches to the bottom edge. Pavement symbols never replace signs. Valet operations still need accessible spaces and a passenger loading zone. Mechanical stacker garages need a loading zone even though they need not provide spaces. The 2010 Standards do not set an electric-vehicle charging ratio.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What must the restroom, telephone and fountain inspection cover?

The ADA does not determine how many toilet rooms a building must have; plumbing and building codes do. It determines which provided rooms are accessible. In new construction, employee rooms count, and at least half of each clustered group of single-user rooms must comply. Portable single-user units provide access to at least 5% of each cluster; construction-worker units are exempt.

For a primary-function alteration, provide at least one accessible restroom for each sex, or one unisex room where only unisex rooms are provided. An accessible unisex room normally cannot substitute for inaccessible multi-user rooms unless technical infeasibility is documented; it must be on the same floor and in the same area. A single-user room has a privacy latch and no more than one lavatory, one water closet and one urinal (or a second water closet instead of the urinal).

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • Turning space is a 60-inch circle or T-shaped space.
  • Grab bars beside and behind the water closet are rigid, do not rotate, and resist 250 pounds. Maintain the exact 1 1/2-inch wall gap.
  • Do not let a lavatory overlap the water-closet clearance (except in residential dwelling units). Dispensers must allow continuous paper flow, must not control delivery, and outlets cannot exceed 48 inches.

Technical infeasibility is narrow: structural or site constraints make full compliance have little likelihood of being accomplished. Combining compartments can be infeasible if fixture counts would fall below plumbing code, but maximum feasible access is still required. A partial alteration brings only altered elements under the rule; a complete gut brings the entire room under it. Check the adopted IBC as well: some assembly and mercantile occupancies trigger an accessible family or unisex room when six or more fixtures are required. The extracted official guide did not confirm a toilet-seat height number, so do not insert one from memory.

Where public telephones or drinking fountains serve the altered area, inspect them after restrooms and before lower-priority items. Relocation of an inaccessible fountain is an eligible path-of-travel cost.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

What should the final reopening checklist record?

  1. Project file: construction-start date, Title II or III status, primary-function areas, safe-harbor elements, three-year alteration history, cost calculation, historic determinations and technical-infeasibility findings.
  2. Entrance: accessible arrival route, unobstructed security equipment, communication signals and any monitored historic alternative.
  3. Route: slopes, widths, surfaces, openings, passing spaces, ramps, landings, handrails, interior routing and vertical access.
  4. Restrooms: required rooms, turning space, clearances, grab bars, dispensers and same-floor unisex solution where justified.
  5. Telephones and fountains: clear floor space, reach, volume or TTY features where applicable, and fountain accessibility.
  6. Parking: count by facility, van ratio, aisle and clearance, shortest route, signs, loading and specialty medical percentages.
  7. Doors: clear width, hardware height and force, opening force measurement, thresholds, maneuvering clearances and door-series spacing.
  8. Altered rooms: counters, doors, turning areas and every replaced element meet the 2010 Standards to the maximum extent feasible.
  9. Leftovers: remove loose gravel, unsecured carpet, parallel grates, water-holding landings, over-tight closers, desk-mounted parking signs and furniture in clearances. Confirm elevators or lifts are operational on opening day.

Retain photographs, field dimensions, gauge readings, invoices and corrective-action dates. The record should show not only what passed, but why a limit was used and what work was prioritized when the 20% cap applied.

What is the difference between an ADA checklist and a barrier-removal checklist?

The older DOJ Checklist for Readily Achievable Barrier Removal is a guide for existing facilities under the ADA Accessibility Guidelines. It is not the alteration standard for reopening a renovated building. Use the 2010 Standards and the applicable Title II or III alteration regulation for new work; use barrier-removal analysis separately for pre-existing barriers that are not being altered.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Does a building permit mean the renovation meets the ADA?

No. A permit shows compliance with the adopted building code process, not a federal civil-rights determination. Compare the permit set and field conditions to the 2010 Standards, then resolve any stricter state or local code items. When a conflict appears, document the governing provision and obtain accessibility expertise before opening.

Frequently Asked Questions

Is the path-of-travel limit always exactly 20%?

The 20% disproportionate-cost test applies to path-of-travel work tied to a primary-function alteration under the cited alteration rule. Title II projects undertaken solely for program accessibility under §35.150 are treated separately, so confirm the project purpose before applying the cap.

If there is no sidewalk onto the site, must the owner build an accessible route?

Not where the only arrival is a vehicular way with no pedestrian access. If the vehicular way is intended for pedestrians, such as a shopping-center parking lot, an accessible route is required from that arrival point.

What slip-resistance coefficient does the ADA require?

None. The Standards do not publish a minimum coefficient because no consensus rating method exists. Specify a stable, firm, slip-resistant surface for expected conditions and maintain it.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Can an accessible unisex restroom replace inaccessible multi-user rooms?

Only in limited alteration situations where making the multi-user rooms compliant is technically infeasible. The unisex room must be in the same area and on the same floor, and the file should explain the structural or site constraint and the access provided to the maximum extent feasible.

Are detectable warnings required on every curb ramp?

No. DOJ building standards require them at transit facilities covered by Department of Transportation standards, while other sidewalks may follow different transportation or public-right-of-way requirements. Check the standard governing that particular site work.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.