Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversHalloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run Scan×
BETTESWORTHConstruction
Bihar transport

How to Check Patna Metro Routes, Stations, and Opening Updates (2026)

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Use Patna Metro Rail Corporation Limited (PMRCL) pages in this order: its Route Map for the planned station sequences, List of Corridor 1, Stations for the Priority Corridor labels, and Inprogress for sections still described as under construction. Then look for a dated notice that explicitly confirms passenger service, stations served, and operating hours. A Bihar government release dated June 29, 2026, said an extension to Malahi Pakri was to be inaugurated on July 2, but the reviewed official material does not confirm the resulting passenger timetable. Treat an inauguration announcement or a “working / constructed” label as a project update, not proof that trains are carrying passengers today.

Which official pages should you check?

Patna Metro information is split across several pages, and each page answers a different question. Start with the route map, then compare the construction-status pages with a dated service announcement. This order prevents a common mistake: reading a planned alignment or a civil-work label as if it were a live timetable.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Official page Best use What it establishes
PMRCL Route Map Planned corridors and station order Two corridor sequences, stated route lengths, elevated and underground portions, and interchange stations
List of Corridor 1, Stations Priority Corridor status labels Malahi Pakri, Khemni Chak, Bhootnath Road, Zero Mile, and ISBT Patna are labelled “Currently Working / Constructed Stations” on the page reviewed on October 13, 2026
Inprogress Sections and stations still listed as in progress Construction entries for both corridors, including several Corridor 2 stations
Chief Minister Secretariat release of June 29, 2026 Dated opening announcement A statement that the extension to Malahi Pakri was to be inaugurated on July 2, 2026
PMRCL Contact Us Last-mile verification The corporation’s current email and helpline details for checking service before travel

These pages can change independently. A route map may continue to show the full planned network while a status page uses construction terminology, so check the page date and wording rather than inferring that a completed civil-work entry equals an operating station.

What routes and stations does PMRCL publish?

The current PMRCL route map describes two corridors. The station order below follows that map, accessed October 13, 2026. Together, the map lists 26 planned stations and 32.50 km of alignment. That combined total is an arithmetic summary of the two corridor figures; it is not a separate operating statistic.

Popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

Corridor 1: Danapur–Mithapur–Khemni Chak

Measure PMRCL route-map value
Length 17.93 km
Stations 14
Elevated section 7.42 km with eight stations
Underground section 10.51 km with six stations
Station sequence Danapur; Saguna More; RPS More; Patliputra; Rukanpura; Raja Bazar; Patna Zoo; Vikas Bhawan; Vidyut Bhawan; Patna Station (interchange); Mithapur; Ramkrishna Nagar; Jaganpura; Khemni Chak (interchange)

This is the west-to-east corridor shown on the map, ending at Khemni Chak. Patna Station is the interchange identified in the route-map station sequence, and Khemni Chak is the other interchange point. The map’s elevated and underground values add to the stated 17.93 km, while the eight-plus-six station split adds to the 14-station total.

Corridor 2: Patna Railway Station–Gandhi Maidan–Patliputra Bus Terminal

Measure PMRCL route-map value
Length 14.57 km
Stations 12
Elevated section 6.49 km with five stations
Underground section 8.08 km with seven stations
Station sequence Patna Station (interchange); Akashvani; Gandhi Maidan; PMCH; University; Moin Ul Haq Stadium; Rajendra Nagar; Malahi Pakri; Khemni Chak (interchange); Bhoothnath; Zero Mile; Patliputra Bus Terminal

Patna Station and Khemni Chak are the interchange stations shown for this corridor as well. The two corridors therefore share those transfer points in the published plan. The second corridor’s five elevated and seven underground stations account for all 12 stations listed on the map.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How to compare the two corridors

Comparison Corridor 1 Corridor 2
Published endpoints Danapur to Khemni Chak, via Mithapur Patna Railway Station to Patliputra Bus Terminal, via Gandhi Maidan
Map length 17.93 km 14.57 km
Planned stations 14 12
Elevated / underground 7.42 km / 10.51 km 6.49 km / 8.08 km
Published transfer points Patna Station and Khemni Chak Patna Station and Khemni Chak

Use the station sequence, not just the endpoint names, when checking a journey. For example, a trip involving Patna Station and Khemni Chak may touch both corridors, but the route map alone does not say that every planned station is currently open or that a train is running through the entire alignment.

Station-name variations to watch for

PMRCL does not use identical spelling on every page. You may see Khemni Chak or Khemnichak, Bhootnath or Bhoothnath, and Patliputra Bus Terminal or ISBT Patna. When searching the site, try both forms and rely on the wording of the specific page you are reading. The variations do not, by themselves, describe separate stations. “Patna Station” and “Patna Railway Station” can likewise appear in descriptive text for the same interchange location.

How to check a route before you travel

  1. Open the Route Map. Use the PMRCL map as the baseline for the planned network. Select the corridor that contains your origin and destination, and read the stations in order rather than relying on a third-party graphic. Note the exact endpoint and spelling shown on the map.
  2. Count the stops on the plan. Mark your origin, destination and any intermediate station. This confirms that you have selected the right corridor and helps expose a similarly named station on another page.
  3. Identify an interchange. On the published sequences, Patna Station and Khemni Chak are the transfer points. If your origin and destination lie on different corridors, verify that the interchange is included in the service notice you will use for the trip. A transfer shown on a plan is not proof that a connecting train is operating.
  4. Check the Priority Corridor page. Open the List of Corridor 1, Stations. The page reviewed on October 13, 2026, groups Malahi Pakri, Khemni Chak, Bhootnath Road, Zero Mile, and ISBT Patna under “Currently Working / Constructed Stations.” That phrase combines work and construction language; it does not state that passengers can board there.
  5. Check the Inprogress page. Compare the map with PMRCL’s Inprogress listing. It includes the broader Corridor 1 station list and Corridor 2 entries for Patna Station, Akashvani, Gandhi Maidan, PMCH, University, Moin-Ul-Haq Stadium, and Rajendra Nagar. Record the exact label and date because a status page can lag behind physical work or use “in progress” as a project category.
  6. Find a dated passenger-service notice. Look for language that names the stations actually served, the start date, and operating hours. A project review, construction bulletin, or inauguration announcement is not enough unless it also confirms passenger operations.
  7. Check for exceptions. Even a service notice may cover only a short extension, selected stations, trial running, or restricted hours. Look for words such as “commercial operation,” “passenger service,” “temporary closure,” “Sunday schedule,” or “until further notice.” Do not assume a ceremonial opening covers the whole corridor.
  8. Verify directly when the notice is unclear. Use the current details on PMRCL’s Contact Us page. Ask whether trains are carrying passengers on the exact station pair you need, which stations are open, and the first and last train times for your travel date.

How to interpret opening and construction labels

Use the source’s category precisely. The following distinctions prevent the most common route-checking error: treating a project milestone as a timetable.

Wording or source type Safe interpretation What you still need to verify
Route Map Planned corridor alignment and station sequence Whether any or all stations are open to passengers
“Currently Working / Constructed Stations” PMRCL’s Priority Corridor work or construction label Passenger-service start date, stations served, fares, and hours
Inprogress listing A section or station remains in PMRCL’s in-progress project list Whether construction has since advanced and whether service has started
Inauguration announcement A public opening event was scheduled or announced Confirmation that trains subsequently began carrying passengers
Explicit service notice The strongest evidence of passenger operation when it names the start date, stations, and timetable Any later closures, restricted hours, or changed station coverage

If two official pages appear inconsistent, do not average the information or assume the newer-looking diagram is a timetable. Use the most recent dated service notice for travel, while retaining the route map for the planned alignment. Save the notice URL or publication date so you can check whether a later update supersedes it.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is known about the Malahi Pakri opening?

The Chief Minister Secretariat’s June 29, 2026 release records a statement attributed to Bihar Chief Minister Samrat Choudhary: “02 जुलाई 2026 को मलाहीपकड़ी तक के मेट्रो रेल परियोजना के विस्तारीकरण का लोकार्पण किया जायेगा”. In English, the extension of the metro rail project up to Malahi Pakri was to be inaugurated on July 2, 2026. The wording is an announcement recorded on June 29; it is not a subsequent confirmation of passenger service.

Also popular on Amazon
Sale
DEWALT 20V MAX Drill and Impact Driver (DCK240C2) | Includes 2 Batteries, Charger and Bag (
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

For a current answer to “which Patna Metro stations are open,” look for a later PMRCL or government notice that explicitly says service began and identifies the stations in operation. The official pages reviewed for this guide do not establish which stations currently carry passengers or publish current operating hours. If that notice is absent, confirm with PMRCL rather than relying on the announced inauguration date.

Why construction progress and opening dates can diverge

A Bihar government project review dated May 2, 2026, reported practical and technical difficulties, cost increases, and delays. Those points explain why a station can appear in a construction or “working” list without having a dependable public timetable. They also mean that an older completion expectation should not override a newer status notice. Construction completion, safety approvals, trial running, a ceremonial inauguration and commercial passenger operation are separate milestones.

The same review discussed a proposed personal rapid transit system for airport connectivity. It was presented as a proposal, not as an operating metro connection. Do not plan an airport trip on the assumption that the metro already provides that link. Check the current airport-transfer options separately and allow a fallback connection if PMRCL cannot confirm service.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Historical project figures versus the current route map

The Prime Minister’s Office cabinet-approval description gives historical approval context: an estimated project cost of ₹13,365.77 crore and a plan to complete the project in five years. Those figures belong to the approval description, not to a current completion forecast. The later Bihar review reported cost increases and delays, while the PMRCL route map now provides the route lengths and station counts to use for a present-day route explainer.

Figure How to use it Source
₹13,365.77 crore estimated cost Historical cabinet-approval context Prime Minister’s Office approval description
Five-year completion plan Original project-planning target, not a current delivery estimate Prime Minister’s Office approval description
Cost increases and delays Later review context when assessing old schedules Bihar government review of May 2, 2026

Do not compare the ₹13,365.77 crore approval estimate with a current budget and call the difference a fare, subsidy or per-kilometre cost. The approval page and later review describe different points in the project’s history. For route planning, the current map’s 17.93 km and 14.57 km figures are more relevant than the original five-year target.

What the published material does not yet establish

Do not fill gaps in the official pages with assumptions or social-media graphics. No independently sourced figure in the reviewed material establishes:

  • Current daily passenger service across either complete corridor.
  • A confirmed list of stations open to the public after the announced Malahi Pakri inauguration.
  • Fares, first-train or last-train times, frequency, or daily ridership.
  • A currently operating metro connection to the airport.
  • Travel times between any station pair.
  • Whether every listed interchange permits an immediate, same-platform transfer.

These are exactly the details to request from PMRCL if you are making a time-sensitive journey. A route map can answer where a line is intended to go, but only a current service communication can answer whether you can board, how much you will pay and when the next train runs.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
Push to Unlock,Katerk 6pcs 1/4 inch Hex Shank Aluminum Alloy Screwdriver Bit Holder Light-Weight Quick-Change Extension Bar Keychain Drill Screw Adapter Portable,Black Carabiner,Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

A practical pre-departure checklist

  • Route: Match your origin and destination to the station order on the PMRCL Route Map.
  • Interchange: Check whether your journey requires Patna Station or Khemni Chak and whether the service notice includes that transfer.
  • Status: Read both the Priority Corridor page and the Inprogress page, preserving their exact wording.
  • Date: Prefer a notice published for your travel date or later; do not treat the July 2, 2026 inauguration announcement as a timetable by itself.
  • Hours: Confirm first and last trains directly when no official timetable is posted.
  • Names: Try spelling variants such as Khemni Chak/Khemnichak, Bhootnath/Bhoothnath and Patliputra Bus Terminal/ISBT Patna when searching PMRCL pages.
  • Station coverage: Ask whether the train serves the complete corridor or only an opened extension and selected stations.
  • Fallback: If passenger service cannot be confirmed, arrange another local connection instead of assuming the planned metro route is usable.
  • Evidence: Save the date and wording of the notice you relied on, especially if your journey is early in the morning or late at night.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How to keep checking after an opening announcement

For a reliable update trail, bookmark the four relevant pages rather than a single screenshot. Revisit the Route Map when you need the planned alignment, the Priority Corridor page for its construction labels, and Inprogress for entries that remain under development. Then search PMRCL’s notices or contact channel for an explicit service statement. Record the publication date, stations named, and hours; those details let you detect a later extension, temporary closure, or timetable change.

Check the pages again immediately before a first trip and whenever your origin or destination changes. A notice about Malahi Pakri, for example, may not answer whether Danapur, Patna Station, Khemni Chak or Patliputra Bus Terminal is included in the same passenger service. Likewise, a page using “constructed” may describe a completed structure while trains await another approval or operating decision.

This method separates four different facts that are often blended together: where the line is planned, what PMRCL says is being worked on, what has been announced for inauguration, and what is actually available to passengers. Only the last category answers whether you can board a train today.

Quick route-reference table

If you need to travel between What to look for on the map What must be confirmed separately
Danapur and Khemni Chak Corridor 1 sequence through Mithapur Whether the full 14-station corridor is carrying passengers
Patna Station and Gandhi Maidan Corridor 2 via Akashvani Whether those named stations are in the current service section
Patna Station and Khemni Chak Published interchange relationship between the corridors Whether a same-day transfer and through service are operating
Khemni Chak and Patliputra Bus Terminal Corridor 2 sequence via Bhoothnath and Zero Mile Whether the extension beyond Khemni Chak is open to passengers

The table is a reading aid, not a timetable. Confirm every row against a dated PMRCL service announcement or the corporation’s contact channel.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Frequently Asked Questions

How many Patna Metro stations are on the published plan?

PMRCL’s current route map lists 14 stations on Corridor 1 and 12 on Corridor 2, for 26 planned station entries. It identifies Patna Station and Khemni Chak as interchanges.

What is the Patna Metro route map?

The official PMRCL Route Map shows Corridor 1 from Danapur through Mithapur to Khemni Chak and Corridor 2 from Patna Railway Station through Gandhi Maidan to Patliputra Bus Terminal. It also gives each corridor’s length and elevated or underground portions.

Which Patna Metro stations are open now?

The reviewed official pages do not establish a current passenger-station list. The Priority Corridor page labels Malahi Pakri, Khemni Chak, Bhootnath Road, Zero Mile and ISBT Patna “Currently Working / Constructed Stations,” but that wording is not confirmation of passenger service. Check a current service notice or contact PMRCL.

Also popular on Amazon
Sale
2 Pack Carpenter Pencils Mechanical Pencils with 12 Refills, (2 Colors) | Construction Pencils with Built-in Sharpener, Long Nib Deep Hole Pencil Marker, Heavy Duty Woodworking Pencil for Architect
  • Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
  • Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
  • Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
  • Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
  • Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed

When will Patna Metro open?

A Bihar Chief Minister Secretariat release dated June 29, 2026, said the extension to Malahi Pakri was to be inaugurated on July 2, 2026. That announcement alone does not confirm that passenger operations began or specify current hours.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Where do the two Patna Metro corridors interchange?

The PMRCL route map shows Patna Station and Khemni Chak as interchange points shared by the two planned corridors. Confirm that the required transfer is operating before travelling.

Does Patna Metro currently connect to the airport?

No operating airport metro connection is established by the reviewed official material. A May 2, 2026 Bihar review discussed a proposed personal rapid transit system for airport connectivity, so treat it as a proposal rather than an available metro link.

Has PMRCL published fares or train timings?

No independently sourced fare, frequency, first-train, last-train or ridership figure was established in the reviewed pages. Ask PMRCL for the current fare and timetable for your station pair and travel date.

Why do Patna Metro station names differ between pages?

PMRCL varies spellings, including Khemni Chak/Khemnichak, Bhootnath/Bhoothnath and Patliputra Bus Terminal/ISBT Patna. Try both forms when searching; the variants do not necessarily indicate different stations.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What should I do if PMRCL pages conflict?

Use the Route Map for the planned alignment, preserve the exact wording of the status pages, and give priority to the newest dated notice that explicitly confirms passenger service. If no such notice exists, contact PMRCL before setting out.

The Bottom Line

PMRCL’s map lists two planned corridors: 17.93 km with 14 stations from Danapur to Khemni Chak, and 14.57 km with 12 stations from Patna Railway Station to Patliputra Bus Terminal. Its construction pages and the June 29, 2026 Malahi Pakri inauguration announcement do not, by themselves, prove current passenger service. Confirm the stations served and operating hours through a current PMRCL notice or contact channel before travelling.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.