Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversHalloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run Scan×
BETTESWORTHConstruction
cement calculation

How to Calculate How Many Bags of Cement a Project Needs

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Start with the volume of concrete required, then use the calculation that matches what you are buying. For premixed concrete, divide the project volume by the yield printed on that specific bag and round up. For concrete made from separate ingredients, obtain the cement quantity from the specified mix design, divide it by the bag weight, and round up.

These methods are not interchangeable: a premixed concrete bag contains cement, aggregate and other ingredients, while a cement bag contains only the binding material. The correct answer therefore depends on the product, mix design, units and project specification.

As an Amazon Associate I earn from qualifying purchases.

What “bags of cement” can mean

People often use “cement” to mean the entire concrete mix. Technically, cement is the binder; concrete is cement combined with aggregate and water, sometimes with supplementary materials. The American Cement Association says cement typically accounts for 10 to 15 percent of concrete volume, so a concrete-bag count cannot be substituted for a Portland-cement-bag count. See the Association’s explanations of cement applications and its cement and concrete FAQ.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Use one of these two calculations:

  • Premixed concrete: project volume ÷ the labeled yield per bag.
  • Separate ingredients: cement mass required by the mix design ÷ cement mass per bag.

Round the result up to a whole bag. Do not use a fixed number of bags for every job: strength, aggregate size, water content, exposure, placement method and the project specification can all change the required cement content.

#1 Best Overall
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

Step 1: Measure the project and calculate volume

Measure length, width and thickness. Convert every dimension to the same unit before multiplying. For a rectangular slab, footing or pad:

Volume = length × width × thickness

If the dimensions are in feet, the result is cubic feet. If the dimensions are in inches, either convert each dimension to feet first or divide the cubic-inch result by 1,728. To convert cubic feet to cubic yards, divide by 27.

Rectangular slab example

  1. Length: 10 feet.
  2. Width: 12 feet.
  3. Thickness: 4 inches = 4 ÷ 12 = 0.333 feet.
  4. Volume: 10 × 12 × 0.333 = approximately 40 cubic feet.
  5. Equivalent volume: 40 ÷ 27 = approximately 1.48 cubic yards.

Use the actual measured thickness, not just the nominal design thickness. An uneven subgrade, thickened edges, steps, grade beams or isolated footings must be calculated separately and then added to the main slab volume.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Irregular shapes

Break an irregular project into simple sections. Calculate each rectangle, triangle, cylinder or other solid, then add the volumes. For a triangular section, use base × height × thickness ÷ 2. For a round pier, use π × radius² × height. Keep all results in the same unit before adding them.

A measurement and unit checklist

Before doing the arithmetic, write down every element of the pour. Record whether a dimension is an inside form dimension, an outside excavation dimension or a finished surface dimension. A plan may show a nominal slab thickness while the excavation is deeper in places, or it may call for thickened perimeter beams that are not included in the slab rectangle. Measure those portions as separate solids.

Choose one working unit. Feet and cubic feet are convenient when the bag yield is stated in cubic feet. For inch measurements, convert thickness by dividing by 12 before multiplying by dimensions in feet. If a supplier quotes in cubic yards, divide the cubic-foot total by 27 only after adding all sections. Do not round each small section too early; keep several decimal places, add the sections, and round the final bag count.

For a project with several identical pads, calculate one pad and multiply by the number of pads. For different pads, steps or piers, calculate each shape independently. This makes it easier to find a measurement error and to explain the order to a supplier or inspector.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How to calculate premixed concrete bags

Premixed concrete bags state a yield, usually in cubic feet per bag. The yield is the controlling number for the purchase calculation:

Number of bags = required project volume ÷ labeled yield per bag

Always read the current package or technical sheet. Bag size and yield vary by product and formulation; a yield from one product is not a universal value for another.

Rank #2
Sale
DEWALT 20V MAX Drill and Impact Driver (DCK240C2) | Includes 2 Batteries, Charger and Bag (
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

Worked slab calculation

Suppose the slab above requires 40 cubic feet and the selected product label states a yield of 0.60 cubic feet per bag:

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  1. Divide volume by yield: 40 ÷ 0.60 = 66.67 bags.
  2. Round up: buy 67 bags as the mathematical minimum.
  3. Check whether the package’s stated yield is based on the exact bag size and product you will purchase.

The 0.60-cubic-foot figure is an example for an 80-pound concrete-mix bag in a manufacturer training presentation, not a universal yield. Verify the current package information in the manufacturer’s training material and on the product you intend to use.

Illustrative bag-count table

The following figures are arithmetic examples using a 0.60-cubic-foot yield. They are not product recommendations; replace 0.60 with the yield printed on your bag.

Required concrete Calculation at 0.60 ft³/bag Whole bags to round up
0.60 ft³ 0.60 ÷ 0.60 1
1 ft³ 1 ÷ 0.60 = 1.67 2
2 ft³ 2 ÷ 0.60 = 3.33 4
3 ft³ 3 ÷ 0.60 = 5.00 5
4 ft³ 4 ÷ 0.60 = 6.67 7
5 ft³ 5 ÷ 0.60 = 8.33 9
10 ft³ 10 ÷ 0.60 = 16.67 17

If the label instead says 0.45 cubic feet, divide by 0.45; if it says 0.80 cubic feet, divide by 0.80. Do not estimate yield from the bag’s weight alone.

How to read a premixed-bag label

Confirm that the product is actually a concrete mix rather than cement-only, mortar, topping or another formulation. Locate the stated yield and note the bag weight to ensure you are using the right line in a product family. Follow the specified water range and mixing instructions; adding extra water can change the concrete’s performance even though it does not change the printed yield calculation. Check whether the technical sheet uses cubic feet, litres or another unit and convert your project volume to that unit before dividing.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

If bags from different lots or products are being considered, do not average their yields. Use one product with one documented yield for the calculation, or perform separate calculations and confirm that the products are compatible with the project specification.

How to calculate Portland cement for a batch made from separate ingredients

When you buy Portland cement, sand and gravel separately, the bag yield for premixed concrete is irrelevant. The project’s mix design or specification must state how much cement is required for the batch. Calculate:

Number of cement bags = specified cement mass ÷ cement mass per bag

  1. Find the required cement mass in the approved mix design. Confirm whether it is stated per batch, per cubic yard, per cubic metre or for the entire pour.
  2. Confirm the actual bag weight, such as 94 pounds, from the package or data sheet.
  3. Use matching units. Convert kilograms to pounds or pounds to kilograms before dividing.
  4. Divide the specified cement mass by the bag mass.
  5. Round up to whole bags and keep the remaining ingredients in the proportions required by the mix design.

Hypothetical mix-design example

If a specification requires 600 pounds of cement and the bags weigh 94 pounds:

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

600 ÷ 94 = 6.38, so the purchase quantity is 7 bags.

Rank #3
Sale
Push to Unlock,Katerk 6pcs 1/4 inch Hex Shank Aluminum Alloy Screwdriver Bit Holder Light-Weight Quick-Change Extension Bar Keychain Drill Screw Adapter Portable,Black Carabiner,Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

This example calculates only the cement component. It does not establish the sand, gravel, water or admixture quantities, nor does it prove that the mix is suitable for a structural element. A qualified designer or the project specification must set those values.

What the five-to-six-bag example does—and does not—tell you

A Portland Cement product data sheet from QUIKRETE describes a typical example of five to six 94-pound bags of Portland cement, with appropriate sand and gravel proportions, for one cubic yard of concrete. That is a manufacturer example, not a universal recipe or a substitute for a project-specific design. The source is the Commercial Grade Portland Cement data sheet.

Two projects with the same volume can require different cement masses because their specified strength, exposure class, aggregate grading, slump, air content and other requirements differ. Never reverse-engineer a structural mix from the bag count in a general example.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Batching controls that affect the result

Use the same calibrated measure for each batch and keep the aggregate and water quantities tied to the approved proportions. Record the number of bags opened, the batch sequence and any changes authorized by the project documents. A cement bag count can be arithmetically correct while the finished concrete is inconsistent if the aggregate is measured by a different method each time or if water is added without control.

Why premixed-bag and cement-bag calculations differ

What you buy What the package or specification provides Calculation What else is required
Premixed concrete Yield per bag, usually in cubic feet Project volume ÷ bag yield Water and the manufacturer’s mixing and placement instructions
Portland cement plus separate aggregate Cement mass required by the mix design Specified cement mass ÷ bag mass Specified sand, gravel, water and any admixtures
Delivered ready-mixed concrete Supplier-confirmed volume and mix designation Order volume based on the project calculation and supplier requirements Truck access, discharge plan, crew, finishing sequence and delivery timing

Concrete volume and cement content are related but not interchangeable measurements. The cement percentage reported by the American Cement Association is useful for understanding the distinction; it is not enough information to calculate bags for a particular job.

How to decide between bags, separate batching and ready-mix

Premixed bags suit small, accessible work

Bagged concrete can make sense when the volume is modest, the site cannot accommodate a truck, and the crew can mix, place and finish each batch consistently. Count bags from the product yield, plan a reliable water supply, and use equipment capable of producing a uniform mix.

Separate ingredients require tighter control

Batching cement, sand and gravel separately can be appropriate when a documented mix design and suitable measuring and mixing equipment are available. It demands accurate proportioning and enough labor to maintain consistency from batch to batch. The cement-bag count alone does not control the quality of the finished concrete.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Ready-mixed concrete changes the logistics

For larger or time-sensitive pours, compare bag mixing with delivered ready-mix rather than applying an arbitrary volume cutoff. Consider supplier minimums, truck access, discharge distance, placement rate, crew size, weather, finishing capacity and the required mix designation. ASTM C94/C94M covers freshly mixed and unhardened ready-mixed concrete; its listing notes that purchaser requirements govern where they differ from the standard. Review the current ASTM C94/C94M listing and the project documents.

The American Cement Association’s guidance on working with concrete emphasizes coordinating mixing, transport, placement and finishing. Ordering enough material is only one part of completing a successful pour.

Compare the full cost, not just the material price

For bagged concrete, list the number of bags, transport, a mixer or other equipment, water supply, labor for handling and mixing, and disposal of damaged or unused material. Separate batching adds the cost and handling of sand and gravel plus measuring and mixing equipment. Ready-mix pricing may include a supplier minimum, delivery charge, waiting time or access requirements; confirm those terms directly with the supplier. The lowest price per bag or per yard is not necessarily the lowest completed-pour cost if the crew cannot place and finish the material within the available time.

Rank #4
Sale
2 Pack Carpenter Pencils Mechanical Pencils with 12 Refills, (2 Colors)
  • Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
  • Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
  • Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
  • Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
  • Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed

Coordinate the placement sequence

Before ordering, map where material will be mixed or discharged, how far it must be moved and who will consolidate, screed and finish it. A bag operation needs a steady sequence so mixed batches do not sit while the crew is still measuring water or carrying bags. A ready-mix operation needs a clear truck route, a discharge point and enough people and equipment to keep up with deliveries. The required volume calculation is the starting point; the placement plan determines whether that quantity can be used successfully.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Account for real-site conditions without inventing a fixed waste percentage

Rounding up handles fractional bags, but the calculated volume may still differ from the amount actually consumed. Check the site for:

  • Uneven excavation or subgrade that increases thickness.
  • Wider or deeper footings than shown on a simple plan.
  • Voids around reinforcement, forms or embedded items.
  • Spillage, damaged bags or material left in a mixer.
  • Losses caused by handling, transport or difficult access.
  • Changes to the pour after the original measurement.

No single overage percentage applies to every site, and the available sources do not establish a universal allowance. Document the measured volume, discuss site conditions with the supplier or designer, and follow the project specification rather than adding an unsupported percentage.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Common mistakes and how to correct them

Using a cement-bag count for premixed concrete

Symptom: You divide the slab volume by the weight of a Portland-cement bag. Correction: Use the premixed product’s cubic-foot yield; aggregate and cement are already combined in that bag.

Using a premixed yield for Portland cement

Symptom: You use “0.60 cubic feet per bag” to decide how many cement-only bags to buy. Correction: Obtain cement mass from the mix design and divide by the cement bag mass.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Mixing feet and inches

Symptom: A four-inch slab is entered as a thickness of 4 feet. Correction: Convert 4 inches to 0.333 feet before multiplying.

Rounding down

Symptom: A result of 66.67 bags is ordered as 66. Correction: Round up to 67 mathematical bags, then review site conditions and availability.

Assuming every 94-pound cement bag has the same role

Symptom: A general one-cubic-yard example is treated as the required design for a footing or slab. Correction: Confirm the specified strength and cement content for the actual project.

Ignoring the current label

Symptom: A yield copied from an old calculator or another product is used. Correction: Read the current package and technical sheet for the exact product, bag size and region.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Adding dimensions from different elements incorrectly

Symptom: Slab length, footing width and pier diameter are combined in one multiplication. Correction: calculate each geometric element with its appropriate formula, convert the results to one volume unit, and then add them.

Best Value
Milwaukee 48-22-3104 Inkzall Point Marker, Fine, Black, 4-Pack
  • Milwaukee Ink all Fine Point Marker, Black, 4 Per Pack
  • 4 per pack Features Clog Resistant Marker Tip Writes through Dusty, Wet and Oily Surfaces Durable Marker Tip for Writing on Concrete, OSB and Rough Surfaces
  • Clog resistant tip writes on dusty, wet and oily surfaces and is optimized for rough surfaces such as OSB, cinderblock and concrete
  • Hard hat clip- attaches for easy access
  • Quick dry time with reduced smearing and marking

A printable calculation worksheet

  1. Project element: record whether it is a slab, footing, pier, step or another shape.
  2. Dimensions: write length, width and thickness in one unit.
  3. Volume: multiply dimensions and convert to the unit used by the product or supplier.
  4. Material choice: mark premixed concrete, separately batched ingredients or delivered ready-mix.
  5. Premixed route: record the exact label yield, divide volume by yield and round up.
  6. Separate-batch route: record the specified cement mass, bag mass, divide and round up; list aggregate and water requirements separately.
  7. Verification: compare the result with the project specification, supplier information, access constraints and the planned placement rate.

Worked example with several elements

Imagine a pour made of a 10-by-12-foot slab at 4 inches thick plus two round piers. The slab is approximately 40 cubic feet, as shown earlier. For each pier, measure its radius and height, calculate π × radius² × height, and multiply by two. Add the pier volume to the slab volume before converting to cubic yards or dividing by a bag yield. If the selected premixed product yields 0.60 cubic feet per bag, divide this combined total by 0.60 and round up once at the end. This method avoids buying a separate rounded-up quantity for every element, which can obscure the total, while still keeping the geometry transparent.

If the same project uses separately batched ingredients, do not convert the combined volume directly into cement bags. Give the total required volume to the designer or use the approved mix design to determine total cement mass, then divide that mass by the actual cement-bag weight. The two routes start with the same geometric volume but use different product or specification data after that point.

When professional confirmation is necessary

Use the project documents and qualified technical guidance for structural slabs, footings, columns, retaining walls, pavements carrying vehicles, engineered repairs and any work subject to inspection. A bag-count calculator can perform the arithmetic, but it cannot select a safe strength class, exposure class, reinforcement arrangement, water-cement ratio or curing plan.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

For any order, confirm the product label, current technical data, local availability and delivery conditions before paying. If the measured volume, specified mix and supplier quantity do not agree, stop and resolve the discrepancy rather than improvising a recipe.

Key formulas

  • Rectangular volume: length × width × thickness.
  • Cubic yards: cubic feet ÷ 27.
  • Premixed bags: project volume ÷ labeled yield per bag, rounded up.
  • Cement-only bags: specified cement mass ÷ bag mass, rounded up.

Frequently Asked Questions

How many bags of cement do I need for a slab?

First calculate the slab’s volume. If you are buying premixed concrete, divide that volume by the exact bag yield printed on the package and round up. If you are buying Portland cement for separate batching, use the cement mass in the approved mix design divided by the bag mass. There is no single bag count for every slab.

How do I calculate cement for a slab?

Multiply length by width by thickness after converting all dimensions to one unit. Then follow the material route: divide by labeled yield for premixed concrete, or divide specified cement mass by cement-bag mass for separately batched ingredients.

How many bags of concrete mix per cubic foot?

Divide one cubic foot by the product’s stated yield per bag and round up. At a 0.60-cubic-foot yield, one cubic foot requires 1.67 bags mathematically, so two whole bags. A different product yield produces a different answer.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Is a 94-pound Portland cement bag the same as a bag of concrete mix?

No. Portland cement is the binding ingredient. Concrete mix also contains aggregate and is sold with a volume yield. Use the cement mass from the mix design for cement-only bags and the labeled yield for premixed concrete.

Can I use the five-to-six-bag-per-cubic-yard example for my footing?

Not automatically. QUIKRETE describes five to six 94-pound Portland cement bags, with appropriate sand and gravel proportions, as a typical example for one cubic yard. Your footing may require different cement content based on its specified strength, exposure and other requirements.

Should I add a fixed percentage for waste?

Do not apply a universal percentage. Uneven excavation, spillage, damaged bags, mixer residue and access can change actual use, but the appropriate allowance depends on the site. Document those conditions and confirm the quantity with the supplier or project professional.

When should I choose ready-mixed concrete instead of bags?

Compare the required volume, supplier minimums, truck access, discharge distance, crew, placement rate, weather and finishing capacity. ASTM C94/C94M addresses ready-mixed concrete, but it does not establish one universal project-size cutoff for switching from bags.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What should I verify before placing an order?

Verify the measured volume, product type, current package yield or approved cement content, bag weight, units, local availability, delivery or pickup conditions, mixing equipment and the time needed to place and finish the concrete.

The Bottom Line

Measure the complete project volume first. Divide by the exact yield for premixed concrete, or divide the specified cement mass by the actual cement-bag weight for a separate batch. Round up, then verify the label, mix design, site conditions and delivery plan.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.