Halloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix NowHalloween DealsAmazon USOctober picks are moving - compare before checkoutAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction
building carbon footprint

How to Calculate a Building’s Carbon Footprint

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

To calculate a building’s carbon footprint, first define the boundary, reporting period, geography and purpose. For an annual operational footprint, collect electricity, fuel and purchased heating or cooling data, multiply each activity quantity by an emissions factor that matches its fuel and location, and add the results as metric tonnes of carbon dioxide equivalent (CO2e). A whole-life carbon assessment goes further: it includes the emissions embodied in materials and construction, plus maintenance, repair, replacement, refurbishment and end of life.

There is no useful single number until those choices are stated. The same building can have different totals under operational-only, whole-life, location-based and market-based accounting. This guide shows how to make those choices, perform the calculation, document uncertainty and report a result that can be compared with another building or design option.

As an Amazon Associate I earn from qualifying purchases.

Start by defining what the footprint means

A footprint is an accounting result, not a permanent property of a building. Its meaning depends on the boundary and period used to produce it. Write these decisions down before collecting data.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Choose the accounting boundary

  • Operational carbon: emissions from energy used to run the building during a stated period, normally one year. This is the scope most directly supported by utility bills and meter records.
  • Whole-life carbon: operational emissions plus embodied emissions from material extraction, manufacturing, transport, installation, maintenance, repair, replacement, refurbishment, demolition and waste treatment over a declared life-cycle period.
  • User carbon: emissions associated with occupants or users, such as commuting. RICS identifies this as a separate category. Include it only when the assessment boundary explicitly requires it.

Do not add user travel to an operational building total merely because the data are available. Conversely, do not describe a utility-bill calculation as a whole-life assessment.

#1 Best Overall
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

Set the period, geography and purpose

State the reporting year or exact 12-month period, the building location, the floor-area convention and the intended use. A screening estimate, corporate inventory, benchmarking exercise, design comparison and formal project assessment can all use different data-quality and documentation requirements.

For a whole-life study, also state the assumed service or life-cycle period and the assessment stage. Early design estimates rely more heavily on generic quantities and assumptions than a completed-building assessment, so they should not be presented with false precision.

Calculate an annual operational footprint from energy data

The core calculation is:

emissions from a source = activity data × emissions factor

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Calculate each energy source separately, convert the result to a common CO2e unit, and then sum the sources:

total operational emissions (kg CO2e) = Σ [activity for source i × factor for source i]

Divide by 1,000 for metric tonnes of CO2e. Keep the source, unit, factor, year and calculation visible in your worksheet.

1. List every energy source in the boundary

For a typical building, the list may include:

  • Purchased electricity.
  • Natural gas or other fuel burned on site.
  • Heating oil, LPG, diesel or other on-site fuels.
  • Purchased district heating.
  • Purchased district cooling.

Include on-site generation only according to the accounting method you have selected. Record electricity exported to a grid separately from electricity consumed on site; exports and renewable generation can change the result and must not be hidden in a single net figure.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

2. Gather consistent activity data

Use invoices, interval meters, sub-meters or validated landlord statements. For every entry, record the quantity, unit, meter or account, start and end dates, fuel type and the part of the building covered. Keep the coverage consistent: a bill for a whole campus cannot be compared directly with a meter serving one tenant floor.

Source Useful activity units Checks before calculation
Electricity kWh or MWh Confirm whether the reading is imported electricity, net electricity after on-site generation, or a supplier-specific quantity.
Natural gas kWh, therms or volume Confirm the utility’s conversion to energy and whether the bill is estimated or actual.
Liquid fuels litres or gallons Identify the exact fuel grade and use the factor for that fuel, not an electricity factor.
District heating or cooling Supplier-reported kWh, MWh or other billed unit Obtain the supplier or utility factor and clarify whether it is location-based, contractual or otherwise defined.

If a month is missing, flag the gap and document the estimation method. Do not silently substitute a different period or a neighboring building’s consumption.

3. Select an emissions factor for each source

An emissions factor connects an activity quantity to greenhouse-gas emissions. Match it to the fuel, geography and inventory year. Record the publisher, release or version, unit and whether the factor represents direct combustion, purchased energy or a supplier-specific product.

For U.S. electricity, EPA eGRID provides regional power-sector generation, emissions, emissions-rate and resource-mix data. Select the release that corresponds to the reporting year and the region serving the building. Electricity factors are not timeless: a different year or grid region can produce a different result from the same kWh.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #2
Sale
DEWALT 20V MAX Drill and Impact Driver (DCK240C2) | Includes 2 Batteries, Charger and Bag (
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

Outside the United States, use the applicable national, regional, utility or supplier-specific source. ENERGY STAR Portfolio Manager is U.S.-oriented. Its help documentation says that properties outside the United States and Canada use U.S. emissions rates and the national average for electricity, a limitation that makes those default factors unsuitable as universally representative international factors without adjustment.

4. Multiply activity by factor without mixing units

Convert activity data to the unit expected by the factor before multiplying. If a factor is expressed in kilograms of CO2e per kWh, electricity must be in kWh. If a fuel factor is expressed per litre, do not multiply it by a value still expressed in gallons unless you first convert the volume.

Keep gases and units compatible. A factor reported in grams of CO2e per kWh must be divided by 1,000 before it is combined with a result reported in kilograms. Apply a gas-specific factor only when the method requires separate carbon dioxide, methane and nitrous oxide calculations; otherwise use the published CO2e factor as specified.

5. Sum the sources and report the period

Add the calculated emissions for electricity, fuels and purchased thermal energy. Report the result as metric tonnes CO2e for the stated year or 12-month period. Show the source-level subtotal so another person can identify whether electricity, gas or district energy drives the total.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Illustrative utility-bill calculation

The following is a method example, not a benchmark factor. Suppose a building used 120,000 kWh of electricity, 18,000 kWh of natural gas and 40,000 kWh of district heat during the same reporting year. If the documented factors were respectively E, G and D kilograms CO2e per kWh, the worksheet would show:

  • Electricity: 120,000 × E kg CO2e.
  • Natural gas: 18,000 × G kg CO2e.
  • District heat: 40,000 × D kg CO2e.
  • Total: (120,000E + 18,000G + 40,000D) ÷ 1,000 metric tonnes CO2e.

Replace the letters with factors documented for the building’s location and reporting year. Never apply the electricity factor to gas or district heat.

Choose the correct electricity accounting method

Electricity can be reported using location-based or market-based accounting. They answer different questions and can produce different totals, so label the method next to the result.

Method What it represents Documentation to retain
Location-based The average emissions intensity of the regional grid supplying the building. Grid region, factor source, release or year and electricity consumption.
Market-based The emissions attributes associated with contractual instruments, supplier-specific factors or qualifying green-power purchases, where the method permits them. Supplier factor, contract or certificate information, eligibility and accounting year.

ENERGY STAR reports location-based and market-based outputs separately and treats green power differently under those approaches. Do not choose the lower number without identifying what it represents. If a report contains both methods, keep them as parallel results rather than averaging them.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Renewable generation, purchases and exports

Document whether solar or other on-site generation is consumed behind the meter, exported, or both. Record purchased renewable electricity and any contractual instruments separately from physical electricity use. The treatment depends on the accounting framework and the quality of the supplier evidence. A claim that a building is “zero carbon” is not supported merely by subtracting an unverified renewable purchase from a location-based grid result.

Calculate whole-life carbon when the question includes the building’s materials

Utility data capture only the operational part of a building’s footprint. Whole-life carbon adds impacts that occur before the building opens and after its operation, including material sourcing and manufacturing, transport, construction, maintenance, repair, replacement, refurbishment, demolition and waste treatment.

“The WLCA standard provides the detailed methodology to enable consistent measurement and quantification of whole life carbon emissions, inclusive of all embodied and operational carbon throughout the whole life cycle of the asset, from initial design to end of life.” — RICS, Whole life carbon assessment (WLCA) for the built environment.

Rank #3
Sale
Push to Unlock,Katerk 6pcs 1/4 inch Hex Shank Aluminum Alloy Screwdriver Bit Holder Light-Weight Quick-Change Extension Bar Keychain Drill Screw Adapter Portable,Black Carabiner,Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

The second edition of the RICS WLCA standard is a current professional methodology for consistent assessment of built assets and is in full effect for RICS members from 1 July 2024. It can be incorporated into life-cycle assessment tools and BIM workflows. Use the current standard, its reporting templates and supporting implementation material for a formal assessment rather than assembling an informal total from unrelated calculators.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Organize the inventory by life-cycle stage

Collect quantities and specifications for structural materials, envelope, finishes, building services and external works. Then map the associated transport, installation, maintenance, replacement, refurbishment, demolition and waste-treatment assumptions to the relevant life-cycle modules in the chosen framework.

Operational energy is reported in the RICS framework as module B6. Break it down by fuel type and end use where possible, such as heating, cooling, lighting, ventilation and equipment. Keep B6 assumptions consistent with the operational calculation described earlier; do not combine a modeled future energy total with historic utility bills without explaining the difference.

Use a declared life-cycle period

A roof, boiler, heat pump, façade component or interior finish may be replaced during the building’s life. State the assumed service life for each component and include replacement and maintenance events in the period. A design comparison that uses a 60-year period cannot be compared directly with one using a 30-year period unless the difference is disclosed and reconciled.

Include the required contingency allowance

The RICS second edition introduces a required contingency allowance. Its size depends on the assessment stage and data quality. Early estimates with generic quantities and assumed lifetimes should therefore show a larger or otherwise appropriate allowance than a detailed assessment supported by verified specifications. Report the allowance and the assumptions behind it instead of burying uncertainty in rounded numbers.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Data needed for a whole-life assessment

Data group Examples Why it matters
Quantities Concrete volume, steel mass, timber area, insulation thickness, glazing area, service equipment counts. Embodied calculations depend on the amount of each product or assembly.
Specifications Product type, recycled content, manufacturing declaration, efficiency, refrigerant and supplier information. Two products with the same quantity can have different factors and replacement profiles.
Transport and construction Distance, mode, delivery load, site energy and installation waste. These activities occur before operation and belong in the declared life-cycle boundary.
Maintenance and replacement Cleaning, repainting, filters, roof membranes, plant replacement and refurbishment cycles. Recurring impacts can exceed the initial product impact over a long life.
End of life Demolition method, transport, processing, recycling, reuse and disposal routes. End-of-life assumptions affect the final whole-life result and any reported benefits.
Operational model Annual energy by fuel and end use, operating schedule, expected changes and refrigerant leakage where applicable to the method. B6 must be based on a declared operational scenario rather than an unexplained guess.

Preserve the source of each quantity: bill of quantities, specification, manufacturer declaration, BIM schedule, contractor record or assumption. A formal assessment should allow another practitioner to trace a total back to the underlying quantity and factor.

Normalize the result so buildings can be compared

Report both the absolute total and an intensity. For operational emissions, a common expression is:

emissions intensity = annual emissions ÷ gross floor area

Use a stated denominator and unit, such as kg CO2e/m²·year or kg CO2e/ft²·year. ENERGY STAR defines energy-use intensity (EUI) by dividing annual energy by gross floor area; emissions intensity follows the same denominator principle but uses the emissions total. EUI is an energy metric, not a carbon-footprint result, and emissions do not affect the 1–100 ENERGY STAR score.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

State whether the area is gross, conditioned, lettable or another convention. Use the same convention when comparing buildings. A smaller reported intensity can simply reflect a larger denominator or an excluded unconditioned area.

What to place in the result table

Field Example entry format
Boundary Operational energy only; user commuting excluded.
Period 1 January–31 December 2025.
Location Building address or grid region.
Total Metric tonnes CO2e for the stated period.
Intensity kg CO2e/m²·year, with gross floor area in m².
Electricity method Location-based, market-based, or both reported separately.
Factors Publisher, release or year, geography and units for every source.
Data quality Actual meter data, estimated months, modeled design data or other qualification.
Contingency Allowance and rationale for a whole-life assessment.

Use tools without hiding their limitations

ENERGY STAR Portfolio Manager

ENERGY STAR Portfolio Manager is an online, U.S.-oriented tool for tracking building energy and emissions from property and utility data. It calculates emissions from on-site fuel combustion and purchased electricity or district energy. It can support a consistent operational workflow, but document its geography and factor limitations, especially when the property is outside the United States or Canada. The tool’s energy score is not a carbon total.

Rank #4
Sale
2 Pack Carpenter Pencils Mechanical Pencils with 12 Refills, (2 Colors)
  • Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
  • Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
  • Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
  • Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
  • Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed

Nearly 25% of U.S. commercial building space is actively benchmarking in Portfolio Manager, according to an EPA page whose reference year is not stated. Treat that figure as a qualified description of reported participation, not as a dated market trend.

EPA eGRID

Use the appropriate eGRID release for U.S. regional electricity factors. The dataset contains generation, emissions, emissions-rate and resource-mix information. Do not reuse a factor from an old release simply because the building’s electricity consumption has not changed.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

GHG Protocol guidance

GHG Protocol calculation guidance explains activity data, emissions factors and emissions scopes, and provides calculation tools. Its tools are complementary rather than mandatory. The important requirement is that the factor represent the relevant process, fuel, region and reporting year.

RICS WLCA methodology

For a professional whole-life assessment, follow the current RICS WLCA standard and its reporting materials. A specialist energy assessor, quantity surveyor, building-services engineer or life-cycle practitioner may be needed when quantities, service lives, product declarations and modeled energy demand must be integrated. ENERGY STAR notes that energy service providers and utilities can also help obtain building data.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Common calculation errors and how to correct them

Giving a number without a boundary

Problem: A report states “the building emits 500 tonnes” without saying whether that is annual operational carbon, embodied carbon, user carbon or a whole-life total.

Correction: Put the boundary and period in the heading of the result table and repeat them in the methodology note.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Using the wrong electricity factor

Problem: A national average, a neighboring grid region or an outdated factor is applied without explanation.

Correction: Match the factor to the building’s grid region and reporting year, and retain the source and version. For non-U.S. buildings, do not assume a U.S. default is representative.

Applying one factor to every energy source

Problem: Electricity, gas and district heat are multiplied by the same factor.

Correction: Calculate each source with its own fuel- and supplier-appropriate factor.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Mixing location-based and market-based totals

Problem: A market-based renewable electricity result is subtracted from a location-based grid result, creating a hybrid total.

Best Value
Milwaukee 48-22-3104 Inkzall Point Marker, Fine, Black, 4-Pack
  • Milwaukee Ink all Fine Point Marker, Black, 4 Per Pack
  • 4 per pack Features Clog Resistant Marker Tip Writes through Dusty, Wet and Oily Surfaces Durable Marker Tip for Writing on Concrete, OSB and Rough Surfaces
  • Clog resistant tip writes on dusty, wet and oily surfaces and is optimized for rough surfaces such as OSB, cinderblock and concrete
  • Hard hat clip- attaches for easy access
  • Quick dry time with reduced smearing and marking

Correction: Report the two methods separately and identify the contractual evidence supporting any market-based factor.

Treating EUI as carbon

Problem: An energy-use intensity or score is presented as the building’s carbon footprint.

Correction: Convert energy activity to CO2e with emissions factors, then report energy and carbon metrics as distinct results.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Hiding estimates behind precise decimals

Problem: Missing bills, generic product factors and uncertain replacement dates produce a total with many decimal places.

Correction: Identify estimated months, generic factors, assumed lifetimes and contingency. Round the published result to a precision justified by the data quality.

Combining incompatible studies

Problem: Embodied emissions from one life-cycle period are added to operational emissions from another period, or two design options use different area conventions.

Correction: Align boundary, modules, life-cycle period, geography, factor year, floor-area denominator and electricity method before comparing totals.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Comparison checklist for buildings and design options

Before ranking two buildings or two design options, check every item below:

  • Are both results operational-only or whole-life?
  • Do they cover the same life-cycle modules and period?
  • Are electricity results both location-based, both market-based, or shown as separate parallel results?
  • Do the factor sources, versions, geographies and reporting years match?
  • Is gross floor area defined the same way, with the same intensity units?
  • Are the data quality, estimated inputs and contingency allowances comparable?
  • Are user emissions, renewable generation, exports and future grid changes included or excluded consistently?
  • Do modeled operational savings depend on assumptions about occupancy, weather, schedules or equipment replacement?

If an option has lower operational carbon but higher embodied carbon, show both components and the combined whole-life result for the same declared period. Do not call one option better based on a single component unless that is the stated decision objective.

A practical worksheet and review process

  1. Write the scope statement: name the boundary, period, geography, purpose, floor-area convention and treatment of user emissions.
  2. Create the source register: list every meter, bill, fuel, district-energy account, material quantity and life-cycle assumption.
  3. Normalize units: convert activity data to the units required by the selected factors and record every conversion.
  4. Assign factors: document source, release or year, geography, unit and accounting method for each energy and material entry.
  5. Calculate by line item: multiply each activity quantity by its factor; do not combine sources before this step.
  6. Run quality checks: compare bills with meter totals, investigate unusual year-on-year changes, check building coverage and confirm that no month is duplicated or omitted.
  7. Assemble the report: show source subtotals, total tonnes CO2e, intensity, assumptions, uncertainty and any contingency allowance.
  8. Obtain review: have a competent energy or life-cycle practitioner check factors, boundaries, material quantities and calculations when the result will support compliance, finance, procurement or a major design decision.

Keep the underlying worksheet with the published result. A transparent calculation that can be updated when better bills, product declarations or grid factors become available is more useful than an apparently exact number that cannot be audited.

What a defensible result looks like

A defensible building-footprint statement might read: “The building’s 2025 operational emissions were calculated from electricity, natural gas and purchased district heat for the period 1 January to 31 December 2025. Electricity uses the stated regional location-based factor for the 2025 reporting year; user commuting and embodied carbon are excluded. The total is reported in metric tonnes CO2e and normalized by gross floor area in kg CO2e/m²·year. Estimated bills, factor sources and any renewable-energy treatment are listed in the accompanying worksheet.”

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

A whole-life statement should additionally identify the life-cycle period, material and construction inventory, maintenance and replacement assumptions, end-of-life treatment, operational-energy scenario, RICS modules used and the required contingency allowance. That level of disclosure lets a client understand what the number answers—and what it does not.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.