Early Black FridayAmazon USEarly Black Friday picks are worth checking nowAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix NowEarly Black FridayAmazon USDo not wait for carts to sell out - compare earlyAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction

How the BJCC Legacy Arena Replaced Its Brutalist Concrete Front with a Daylit Curtain Wall

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

The Birmingham-Jefferson Convention Complex (BJCC) Legacy Arena was opened up by removing its south-facing concrete facade and installing a three-story curtain wall. The renovation turned a bunker-like arrival into a transparent lobby with daylight and views toward downtown Birmingham, while the specified Solarban 72 Acuity glass was selected to limit solar heat gain on the predominantly south-facing elevation.

This was not a new arena project. It was a targeted intervention in the 1976 building, followed by a much broader upgrade to entrances, circulation, seating, concessions, restrooms and event systems. The facade work shows how an existing, structurally robust arena can gain a more public presence without rebuilding its primary frame.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What changed at the Legacy Arena?

The central move was straightforward to describe but substantial to execute: the project team removed the existing concrete wall on the arena’s south side and replaced it with a three-story glazed curtain wall. The result exposes the lobby to natural light and gives visitors a visual connection to downtown rather than the blank, heavy exterior that had characterized the original entry.

The arena is part of the BJCC in downtown Birmingham, Alabama. Designed originally by George W. Qualls, it opened in 1976. The curtain-wall intervention was designed by Populous with CCR as a design participant. Trulite, based in Lithia Springs, Georgia, is identified in the project profile as the glass fabricator; photography is credited to Tom Kessler. Those roles are distinct: the architects developed the design, the design participant contributed to it, and the fabricator produced the glazing components.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

Building Enclosure’s project profile and Vitro Architectural Glass’s account describe the facade as part of a renovation of the existing multipurpose arena, not a replacement building.

Why use a curtain wall on a brutalist arena?

The stated design objective was to make the lobby dramatic, open and light-filled while adding views of downtown. Populous Principal Jim Swords said the curtain-wall system was chosen for those purposes. A glazed wall can provide a broad visual opening without asking the arena’s occupied floors to carry the weight of a conventional masonry enclosure; the building frame supports the curtain-wall anchors while the wall carries its own glass and framing loads.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

For an arena, the change also affects wayfinding. Visitors can see activity in the building before passing through security or ticketing, and the concourses were opened to provide direct views into the seating bowl. That visual connection helps the building read as a civic venue rather than a sealed event box.

Transparency was not the only criterion. The new elevation faces predominantly south, so the design team had to balance daylight and views against unwanted heat from direct sun. The glass choice therefore formed part of the building-envelope strategy, not merely an aesthetic finish. Solar-control coating, frame design, shading conditions, air and water management, and the quality of installation all influence the final performance of a curtain wall.

What glass was specified for the south-facing facade?

The project account names Solarban 72 Acuity glass, a triple-silver coated product on an Acuity low-iron substrate. Low-iron glass is used when a design calls for a clearer, less green appearance, while the coating is intended to admit useful daylight and reduce solar heat entering the lobby.

Vitro reports two headline figures for this product in its 2024 project account:

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
  • 67% visible light transmittance (VLT): the manufacturer’s stated share of visible light transmitted through the glass.
  • 72% solar heat gain blocked: the manufacturer’s stated product figure for reducing solar heat entering through the glazing.

Those numbers should be read as product data supplied by Vitro, not as a measured result for the installed Legacy Arena facade. The sources reviewed do not provide post-occupancy energy savings, an independent facade test, or a comparison with another glass system. Actual performance depends on the complete insulating-glass build-up, framing, orientation, surrounding buildings, interior loads, controls and workmanship.

How did the project handle the existing structure?

The project account says the existing arena was robust enough for the entire south side to be removed without structural modifications. That is a significant adaptive-reuse advantage: the team could change the enclosure while retaining the primary building structure. It avoided the cost and schedule exposure of reinforcing the main frame merely to create the new opening.

“Without structural modifications” did not mean that demolition was uncomplicated. Large entry stairs were removed, and storm-water pumps located beneath those stairs also had to be removed. Below-grade drainage and waterproofing are critical when an old entry sequence is altered. Any replacement slab, pit, trench or utility route must keep water away from the new lobby and maintain a reliable path for roof and site runoff.

A curtain wall also transfers wind pressure, dead load and movement demands to its anchors. Even when the main frame remains unchanged, the engineer must verify edge conditions, attachment locations, tolerances and movement joints. Existing construction rarely aligns perfectly with new modules, so surveys and field verification become as important as the design drawings.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What would a curtain-wall replacement sequence look like?

The published project coverage does not provide a day-by-day construction schedule. A practical sequence for this type of renovation, however, follows the building-envelope and life-safety constraints below. The exact order is project-specific and must be set by the contractor, engineer and authority having jurisdiction.

  1. Survey the existing facade and below-grade services. Record structure, utilities, pumps, drainage, hazardous materials and the location of every proposed opening. Confirm that the existing frame can remain while the enclosure is removed.
  2. Set the temporary works and protection plan. Arena renovations require separation between demolition, public circulation and event operations. Temporary weather barriers, dust control, fire protection and egress routes must be established before the old wall is opened.
  3. Remove the entry elements and concrete enclosure in controlled zones. The Legacy Arena work included removal of the large stairs and the pumps beneath them. Demolition boundaries should preserve structural stability and prevent water from entering occupied areas.
  4. Prepare the slab edges and anchors. New embeds or anchors are surveyed against the curtain-wall shop drawings. Tolerances, corrosion protection, thermal breaks and fire-containment details are resolved before glazing begins.
  5. Install framing, perimeter seals and fire stopping. A curtain wall is a system, not just a grid of glass. Mullions, pressure plates or captured components, gaskets, backer materials, perimeter fire containment and transitions to the roof and side walls must work together.
  6. Set the insulating glass and complete closures. Solarban 72 Acuity units are installed according to the fabricator’s handling, setting-block and sealant requirements. Glass protection remains in place until adjacent trades are finished.
  7. Test and commission the enclosure. Water, air and structural testing are normally performed on representative areas or installed sections under the project’s specifications. The available data does not report results for this arena, so no project-specific test outcome should be assumed.
  8. Finish the lobby and reconnect building systems. Interior ceilings, floors, lighting, security, ticketing and mechanical systems must be coordinated with the new daylight and the altered entry geometry.

How does the new facade change the visitor experience?

The most immediate change is visual. Daylight reaches a lobby that had previously been behind a heavy concrete face, and people approaching the arena can see downtown through the glazed elevation. The stated goal was an open, light-filled lobby with views, so the curtain wall functions as both enclosure and orientation device.

Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

The opened concourses add a second layer of visibility: views into the seating bowl. That can make the arena feel active even before an event begins and helps visitors understand where they are in a large, complex building. It also creates design obligations. Glare, reflections, acoustics, bird-collision risk, cleaning access and nighttime light spill all need to be addressed in the detailed design, even though the published project sources do not report the specific measures used at Legacy Arena.

South-facing glass can produce high contrast between bright exterior conditions and darker interior surfaces. A high VLT product supports daylight, but interior finishes, lighting controls and shading strategy determine whether that daylight is comfortable. The manufacturer’s 72% solar-heat-blocking figure addresses a key part of the problem, but it does not by itself describe occupant comfort or annual energy use.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What other work was included in the arena renovation?

The curtain wall was one visible part of a wider modernization. The project included a new street-level main entrance after the large entry stairs were removed, along with new stairs, elevators and escalators. A tree-lined entry reshaped the approach to the building.

Inside, the scope included interior renovation, new signage, upgraded concessions and restrooms, premium seating levels with club boxes and VIP suites, new sound and lighting systems, and 360-degree ribbon boards. A larger loading dock was added for concerts and special events. These changes matter because an arena’s performance depends on circulation, back-of-house logistics and event technology as much as on its public facade.

The reported arena area is 335,000 square feet. Vitro’s project account lists capacities of 15,000 seats for basketball, 16,000 for center-stage concerts and 12,000 for end-stage concerts. Capacity varies by configuration because the floor, stage, back-of-house zones and spectator circulation change from event to event.

Reported Legacy Arena capacities
Configuration Reported capacity
Basketball 15,000 seats
Center-stage concert 16,000 seats
End-stage concert 12,000 seats

These figures come from Vitro’s 2024 project account. They are venue configuration figures, not evidence that the facade itself increased seating capacity.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

What can builders learn from the Legacy Arena facade?

Start with the public edge. Replacing a blank wall at the principal approach can change how an older building is perceived without altering every part of its structure. The value is architectural and operational: a clearer entry, better orientation and a stronger relationship with the city.

Check the structure before assuming replacement is impossible. The project team’s conclusion that the south side could be removed without structural modifications illustrates why existing-condition surveys and structural assessment should precede a concept decision. A robust frame can make an enclosure transformation feasible; a weak or irregular frame may make it expensive.

Treat solar control as an integrated decision. South-facing glazing requires more than selecting a coating by name. Designers must coordinate VLT, solar heat gain, color, reflectance, frame sightlines, shading, HVAC loads and interior lighting. Product figures are useful inputs, but they are not a substitute for whole-building modeling or field verification.

Plan below-grade work early. The pumps beneath the old entry stairs were an unexpected-looking but consequential part of the demolition scope. Drainage, waterproofing and utility conflicts can control the schedule even when the visible facade work appears straightforward.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Preserve event operations where possible. Arena work occurs around a calendar of games, concerts and conventions. Temporary egress, loading, security and weather protection should be designed as carefully as the permanent facade so that construction does not compromise life safety or the venue’s ability to host events.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What is not known about the project’s performance?

The available sources are a manufacturer project account and a trade-publication profile based on that coverage. They establish the design intent, named participants, product selection and reported capacities, but they do not publish independent post-occupancy measurements. There is no documented project-specific figure for energy savings, cooling-load reduction, daylight autonomy, glare complaints or installed-facade test performance.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

That evidence limit is important when interpreting the project. The Legacy Arena curtain wall can be described accurately as a transparency and daylight intervention using a solar-control glass product. It cannot be presented as proof of a particular energy payback, comfort outcome or superiority over an alternative glazing system without additional measured data.

Why does this renovation matter for existing convention and arena buildings?

Large public venues often inherit opaque envelopes, complicated entries and circulation systems designed for a different era of security, technology and audience expectations. A facade replacement can address those issues at the point where visitors form their first impression, while a coordinated interior and back-of-house program improves the rest of the event experience.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Legacy Arena demonstrates a focused strategy: retain a capable 1970s structure, remove the visual barrier at the city-facing side, use a high-transmittance solar-control glass, and pair the envelope change with circulation and event-infrastructure upgrades. The approach is neither a cosmetic glass box nor a wholesale rebuild. It is an adaptive-reuse decision shaped by orientation, structure, drainage, operations and the demands of a multipurpose venue.

Frequently Asked Questions

When did the original Legacy Arena open?

The arena opened in 1976 and was originally designed by George W. Qualls. The curtain-wall work is therefore a renovation of an existing venue rather than a new-arena construction project.

Does the new glass make the entire arena transparent?

No. The documented intervention is a three-story curtain wall on the south side, focused on the main public-facing lobby and adjacent concourse views. Other portions of the arena remain part of the existing enclosure.

Who fabricated the Legacy Arena curtain wall glass?

The project profile identifies Trulite, based in Lithia Springs, Georgia, as the glass fabricator. Populous is listed as architect and CCR as a design participant, so the credits should not be treated as interchangeable.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Are the 67% and 72% figures measured at the completed arena?

They are product figures reported by Vitro Architectural Glass for Solarban 72 Acuity in its 2024 project account. The available coverage does not report independent measurements of the installed facade or post-occupancy energy performance.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 13, 2026 8:21 am GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.