Driver FixRecommendedSound, Wi-Fi or graphics acting up? Check drivers firstFind missing or outdated drivers fast.Check DriversBlack Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan Now×
BETTESWORTHConstruction

How Marlborough’s Green Streets Linked Stormwater Control and Community Space

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

The Downtown Marlborough Green Infrastructure Streetscape is a Kansas City, Missouri, neighborhood project that paired stormwater management with places to walk, gather, learn, and play. Phronesis’s plan connected a green street corridor with Arleta Park, a transit hub, an outdoor classroom and community center, and an ecoplayground and nature park. It was part of a broader city effort to control sewer overflows—not a standalone drainage project, and not the separate complete-streets project in Marlborough, Massachusetts.

For construction and public-works readers, the central lesson is how a watershed-scale infrastructure requirement can shape a neighborhood corridor and its destinations. The evidence also has limits: the reported watershed cost and overflow reduction are not dated on the case-study page, and the available accounts do not establish the current operating or maintenance status of every planned element.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Where is the Downtown Marlborough project?

It is in the Marlborough neighborhood of Kansas City, Missouri. The name can be confusing: a separate transportation project in Marlborough, Massachusetts, concerns Granger Boulevard between Mechanic Street and Main Street. That Massachusetts project is described in the Boston Region Metropolitan Planning Organization’s transportation program and is not the subject of this case study.

The American Society of Landscape Architects (ASLA) presents the Kansas City work as a Phronesis landscape-architecture case study in community development. Its scope reaches beyond a single street segment: the case study connects a green street corridor to parks, transit, community space, and recreation. That distinction matters when interpreting both its design and its results. The project is best understood as a neighborhood-scale public-realm strategy situated within a larger watershed program.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

ASLA’s Downtown Marlborough case study is the primary source for the project’s stated components, engagement approach, and watershed statistics. A separate KCUR report from May 2018 documents neighborhood context and features described at that time. It is useful historical reporting, not confirmation of present-day construction or maintenance status.

Why did Kansas City need green infrastructure?

Kansas City’s Clean Water Act settlement addresses sewer overflows and pollution associated with urban stormwater. The EPA says the city must use green infrastructure—such as rain gardens, permeable pavement, and green roofs—alongside structural controls. In a combined sewer system, stormwater entering the system can contribute to overflow events; reducing or slowing runoff before it reaches the sewer is one way to help manage that pressure. The city’s obligations and settlement context are described by the EPA’s Kansas City settlement page.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Green infrastructure works by managing water closer to where rain falls rather than relying only on pipes and centralized conveyance. A rain garden can receive runoff and allow it to infiltrate; permeable pavement can let some water pass through the surface; green roofs can retain or slow rainfall on buildings. These are examples of the broader methods cited by EPA, not a complete inventory of what was installed on this particular corridor. The available project account describes the initiative’s intent as capturing stormwater at source while supporting walking, biking, parks, and neighborhood development.

That pairing is important for a public-works project. A conventional drainage intervention is often evaluated chiefly by its hydraulic role. A green street can also alter the experience and usefulness of the public realm. But those benefits do not make the drainage function incidental: the design has to serve water management and public use together, and the project’s evidence should be read at the scale at which each result was reported.

What did the Marlborough plan include?

ASLA lists several connected pieces rather than describing one isolated stormwater feature. Together they make the project legible as a corridor and network of destinations.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
  • A green street corridor: the organizing route for green infrastructure and neighborhood connections, intended to capture runoff at its source while supporting walking and biking.
  • Arleta Park: a public-space destination included in the case-study description.
  • A transit hub: a transportation element in the broader corridor vision, linking public space and mobility.
  • The Rachel Morado outdoor classroom and community center: a place for outdoor learning and community activity, tying the landscape work to social use.
  • An ecoplayground and nature park: a recreational and nature-oriented destination in the project’s program.

The list demonstrates the breadth of the concept, but it should not be treated as a verified as-built inventory. ASLA’s page identifies these elements in the case study; the sources provided do not document the completion date, current condition, or ongoing maintenance status of every item. Likewise, KCUR’s 2018 account describes a stormwater reservoir, porous sidewalks, a sunken garden designed for drainage, and parks in development in the surrounding neighborhood. Those observations illuminate what residents and reporters saw then; they do not establish the current status of all project features.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

From a construction perspective, the integrated scope raises coordination questions even when a source does not provide the technical drawings or contract details. A street corridor, transit stop, park, learning space, and play area involve different users and functions. Water must be managed without undermining safe access or the usability of destinations. The case study supports the broad conclusion that the project brought those purposes into one planning frame; it does not provide enough detail to claim particular grading, material specifications, phasing, or maintenance procedures.

How did community engagement shape the project?

Phronesis says it used monthly stakeholder and public meetings, along with door-to-door conversations with businesses, to gather community wants and needs. The process connected watershed planning to neighborhood development and helped identify feasible destinations for the corridor.

That engagement is relevant to infrastructure delivery because residents and businesses understand local patterns of movement and use that are not captured by a drainage objective alone. A corridor’s value depends not only on where runoff goes, but also on whether people can reach and use its parks, transit connections, and gathering places. The case study frames engagement as part of the work of linking the technical watershed approach to community priorities, rather than as a separate outreach exercise.

KCUR’s reporting adds local voices and historical context. It describes neighborhood coalition leaders and quotes residents discussing park use and neighborhood aspirations. Those perspectives help explain why public destinations mattered alongside sewer and stormwater concerns. They should be understood as accounts from 2018, not as evidence of current resident opinion or a later project evaluation.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

What do the project’s cost and overflow figures actually measure?

ASLA reports a $40 million green-infrastructure investment for the broader 744-acre Middle Blue River watershed and a 78 percent reduction in combined sewer overflows into the Blue River. Those are watershed-level figures, not a cost or performance result attributable solely to the Marlborough streetscape.

The case-study page does not state the year for the investment figure or the measurement period and year for the reported reduction. Accordingly, the numbers should be quoted with their scope and caveat intact; they should not be presented as a current project budget, a Marlborough-only expenditure, or a result measured exclusively from this corridor. The available account also does not specify the method used to calculate the reduction.

A second figure appears in KCUR’s 2018 reporting: Brenda Thomas, president of the Marlborough Community Coalition, cited a $50 million city green-infrastructure investment to update the sewer system and control flooding. This is a distinct figure and scope from ASLA’s $40 million Middle Blue River watershed account. The two values should not be combined or treated as competing estimates for the same project without more information.

KCUR also reported that 5th District Council Member Alissia Canady cited 1,500 water mains replaced, 400 trees planted, and more than 2,000 trash and recycling bins distributed while discussing multiple neighborhood benefits. These counts describe wider neighborhood or city activity in that report; they are not construction quantities for the Downtown Marlborough streetscape.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What can the case study teach other public-works projects?

The project offers a planning model more than a transferable construction specification. It shows how a sewer-overflow-control obligation can be connected to a street corridor and community destinations, and how public participation can help establish which destinations are relevant. It does not provide enough evidence to reproduce its engineering details or claim that the same configuration will work in another watershed.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

For a comparable project, decision-makers should keep several questions distinct:

  • What is the scale of the water problem? Identify whether a claim applies to a parcel, corridor, neighborhood, sewer district, or watershed. Marlborough’s headline cost and overflow numbers apply to the broader watershed investment.
  • What is being built, and what is only planned? Separate a case-study program or design list from confirmed completion records. The available sources do not establish the present status of all listed destinations.
  • How will water management coexist with access? The stated goals include stormwater capture, walking, biking, transit, and recreation. A project must make those purposes compatible in its design and delivery, although the cited sources do not detail the technical resolution.
  • Who has a voice in selecting destinations? Monthly public and stakeholder meetings and business outreach were part of Phronesis’s described process. Local priorities can make infrastructure more relevant to residents, but engagement claims should be attributed to the project account.
  • What evidence will demonstrate performance over time? A percentage reduction is more useful when accompanied by a measurement period, baseline, method, and defined project boundary. Those details are not supplied on ASLA’s case-study page, so the reported 78 percent figure requires qualification.
  • Who will maintain the assets? Green infrastructure and public spaces both need ongoing care. The sources reviewed do not establish the current operating or maintenance arrangements for this project, so no specific responsibility or present condition should be assumed.

These questions help avoid a common case-study error: transferring an impressive outcome from a broad infrastructure program to one visible street project. A sound comparison with another green-street project would use consistent measures for stormwater capture and overflow outcomes, watershed footprint, walking/biking/transit connections, community destinations and engagement, implementation timing, and ongoing maintenance evidence. The cited material supports those comparison dimensions but does not supply complete, current data for each one at Marlborough.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How should readers interpret the project’s broader claim?

Phronesis’s statement, as quoted by ASLA, says the work “not only met the technical requirements of Kansas City’s overflow control program requirements, but also became a catalyst for economic development and community enhancement.” The quotation captures the project’s intended dual role: infrastructure compliance and neighborhood improvement. It is an attributed project characterization, not an independent measurement of economic impact.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

ASLA also attributes to Phronesis the claim that the work expanded the vision of green infrastructure as community building in Kansas City and was replicated in other watersheds. That is a statement about influence and replication from the project team as presented by ASLA. The source material does not specify the other watersheds or provide a separate evaluation of what was replicated, so the claim should not be expanded into a detailed account of later projects.

The strongest evidence-based conclusion is narrower and more useful: Marlborough’s case study presents green infrastructure as a way to join stormwater objectives with public-space planning and neighborhood destinations. Its stated engagement process and program provide a clear account of that approach. Its headline performance figures belong to a larger watershed, lack dates on the case-study page, and should remain distinct from corridor-level outcomes.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

Frequently Asked Questions

Is the Downtown Marlborough Green Infrastructure Streetscape in Massachusetts?

No. This case study concerns the Marlborough neighborhood in Kansas City, Missouri. Massachusetts has a separate complete-streets transportation project on Granger Boulevard, which is unrelated to the Kansas City case.

Who designed the Marlborough green infrastructure project?

ASLA presents the case study as a Phronesis landscape architecture project. The material cited here does not identify an individual designer or provide a full consultant and contractor roster.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Did the Marlborough streetscape itself reduce Blue River overflows by 78 percent?

The cited 78 percent reduction is reported for Kansas City’s broader green-infrastructure investment in the 744-acre Middle Blue River watershed. The case-study page does not isolate the streetscape’s contribution or provide a measurement period.

Are the parks and community spaces still operating today?

The available sources identify the spaces in the project account and provide a neighborhood snapshot from 2018, but they do not establish the current operating condition or maintenance status of each destination. Current status should be confirmed with an up-to-date local source.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
Windows Errors? Fix Them Before They SpreadFree repair scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.