Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversEarly Black FridayAmazon USEarly Black Friday picks are worth checking nowAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run Scan×
BETTESWORTHConstruction

How ECLIPSE Shrinkage-Reducing Admixture Controls Concrete Drying Shrinkage

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

ECLIPSE shrinkage-reducing admixture is a liquid concrete admixture designed to limit drying-shrinkage strain as hardened concrete loses moisture. In North American documentation, the family includes ECLIPSE 4500 for broad concrete, mortar, grout and shotcrete use, and ECLIPSE Floor 200 for indoor slab-on-grade floors. The manufacturer describes the mechanism as lowering the surface tension of pore water, reducing the capillary forces that pull the cement paste inward during drying.

Neither formulation is a universal cure for cracking. Cement and pozzolan content, water, paste volume, aggregate, other admixtures, curing, environment and construction practice all affect the result. The defensible way to specify ECLIPSE is to run project-specific trial mixtures, compare them with a reference concrete and measure drying shrinkage with ASTM C157 before construction.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is ECLIPSE shrinkage-reducing admixture?

ECLIPSE is a liquid admixture added to concrete or cementitious mixtures to reduce drying shrinkage. As concrete dries, water leaves the capillary-pore system and surface-tension forces create tensile stress in the paste. Chryso describes ECLIPSE 4500 as reducing pore-water surface tension, which lowers the shrinkage strain that develops during drying. The product does not replace sound mix design, curing, joints or crack-control reinforcement.

The current US technical data sheets are dated September 26, 2025. They give typical dosage ranges, addition guidance and application limits, but require the specifier to confirm the current local technical and safety data sheets before ordering or batching. Product names, formulations and performance data can vary by region.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

Read the ECLIPSE 4500 product information with the current US ECLIPSE 4500 technical data sheet, and use the separate ECLIPSE Floor 200 technical data sheet for indoor slabs.

Which ECLIPSE formulation fits the project?

ECLIPSE 4500 is the general-purpose choice in the US documentation; ECLIPSE Floor 200 is specifically positioned for indoor slab-on-grade construction where reduced curling and longer joint spacing may be objectives. Select by application and exposure, not by the product name alone.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Formulation Documented applications Typical US dosage Important qualification
ECLIPSE 4500 Precast, prestressed and post-tensioned concrete; ready-mix; mortar; grout; wet-mix shotcrete; all cement types listed by the datasheet 0.5–1.5 gal/yd³ (2.5–7.5 L/m³); broader rates may be used to meet project requirements In freeze-thaw concrete, verify air content and all specified durability criteria. Set is typically extended by less than one hour.
ECLIPSE Floor 200 Indoor slab-on-grade concrete, including projects seeking reduced curling or extended joint spacing 0.5–1.5 gal/yd³ (2.5–7.5 L/m³); lower and higher rates have also been used according to the datasheet The datasheet says it meets or exceeds ASTM C494 Type S. Do not apply that classification to other ECLIPSE formulations without their own documentation.

These are manufacturer guidance ranges, not guaranteed prescriptions. The effective concentration depends on mix water and on the cementitious system. A slab exposed to de-icing salts, a post-tensioned member and a dry-mix repair mortar may need different qualification work even when the nominal dosage is similar.

How does ECLIPSE reduce drying shrinkage?

Drying shrinkage is driven by moisture loss from pores in cement paste. Capillary tension increases as the pore water menisci become more curved, pulling the solid skeleton inward. The ECLIPSE mechanism is to lower pore-water surface tension, reducing that capillary pull at a given moisture state. The result is a lower measured shrinkage strain in a compatible mixture, not an elimination of all volume change.

Concrete can still crack because of thermal movement, restraint, settlement, plastic shrinkage, poor curing, excessive water, thermal gradients or construction loads. ECLIPSE therefore works as one part of a crack-control strategy that also includes aggregate selection, water control, curing, joint layout and reinforcement detailing.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

What dosage and batching sequence should be used?

For both US products, the normal starting range is 0.5–1.5 gal/yd³ (2.5–7.5 L/m³). The final rate should be selected from trial mixtures that use the actual cementitious materials, aggregates, water-reducing admixtures and environmental conditions expected on the job. Do not copy a rate from another project without confirming the formulation and units.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  1. Confirm the local documents. Obtain the current technical data sheet and safety data sheet for the product supplied in your region. Check whether the project calls for ECLIPSE 4500 or Floor 200 and whether the exposure requires air entrainment or other durability limits.
  2. Calculate the batch quantity. Convert the selected rate to the plant’s batch volume and verify the dispenser calibration. Keep gallons per cubic yard and litres per cubic metre distinct; they are equivalent ranges stated in the US sheets, not interchangeable labels for a different concentration.
  3. Add after dry materials and most of the water. The ECLIPSE 4500 sheet generally recommends introducing the liquid after the dry materials and most of the mixing water. Follow the supplier’s current sequence for the specific plant and admixture package.
  4. Allow adequate mixing. Use the plant’s established mixing time needed to distribute a liquid admixture uniformly. Confirm slump, air, temperature and other fresh properties before discharge.
  5. Recheck field adjustments. Water added at the jobsite changes the admixture’s concentration relative to mix water and can erase the intended shrinkage benefit. Record any water or admixture adjustment and its timing.

ECLIPSE 4500 has slight retarding properties; the 2025 US sheet says set is typically extended by less than one hour. That is a typical observation, not a guaranteed limit for every cement, temperature or admixture combination. Plan finishing and protection around measured setting behavior.

How should a trial mixture be designed?

A trial program should reproduce the production materials and compare ECLIPSE with a relevant reference concrete. Chryso’s TB-1000 bulletin identifies water content, paste fraction, admixtures, cementitious and pozzolan types and quantities, aggregate characteristics and proportions as major influences on drying shrinkage.

  1. Define the performance target. State whether the project needs a lower ASTM C157 strain, reduced curling, longer joint spacing, a durability limit or a combination. A target joint spacing is not itself a shrinkage result.
  2. Prepare a reference mixture. Use the proposed production mixture without ECLIPSE. Keep its materials, air, slump, temperature and curing conditions documented so comparisons are meaningful.
  3. Prepare at least two ECLIPSE rates. TB-1000 recommends low- and high-dose ECLIPSE mixtures in the test matrix. The normal US range of 0.5–1.5 gal/yd³ (2.5–7.5 L/m³) is a practical starting window, subject to the project data sheet.
  4. Include water-reduced variants when relevant. The bulletin specifically recommends including superplasticized and mid-range water-reduced mixes because these admixtures can change the attainable shrinkage reduction.
  5. Control fresh properties. Measure and record slump or flow, air content, temperature, density, setting behavior and strength specimens as required by the specification. Keep curing and specimen handling consistent.
  6. Use a qualified laboratory. Shrinkage results are sensitive to specimen preparation, curing and measurement. Have a qualified laboratory perform the selected standard and report deviations.

How is shrinkage measured with ASTM C157?

ASTM C157 is the reference method identified in the ECLIPSE documents for evaluating drying shrinkage of concrete prism specimens. The key decision is comparative: evaluate the ECLIPSE mixtures against an otherwise relevant reference made with the same project materials and procedures. A single percentage copied from another formulation cannot predict a field slab.

Specify the specimen age, curing period, drying environment, measurement schedule and acceptance criterion in the test plan. Keep the laboratory report with the mixture submittal, including the exact ECLIPSE product, regional data sheet, dosage, batch sequence and all companion admixtures. If the reference mixture changes, the shrinkage comparison may no longer answer the design question.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

What performance figures have been published?

A UK GCP product page reports that ECLIPSE Floor at a stated dosage of 7.5 L/m³ achieved up to an 80% reduction in ASTM C157 drying shrinkage at 28 days and up to 50% at one year or beyond. Those are manufacturer-reported, formulation- and test-specific figures from a UK source. They should not be presented as a guaranteed result for the US Floor 200 sheet, ECLIPSE 4500 or a different concrete.

Regional formulation, cement chemistry, aggregate, water-to-cementitious ratio, curing and test conditions can all change the outcome. Use the UK ECLIPSE FLOOR information only as context, then qualify the locally supplied product under the project test plan.

What changes in freeze-thaw concrete?

ECLIPSE 4500 may be used in freeze-thaw work only when the complete durability design is maintained. Its US data sheet calls attention to air content and other specified mix criteria because a shrinkage admixture does not substitute for a properly entrained air-void system.

Measure air in the fresh concrete and verify the specified spacing factor, strength, water-to-cementitious ratio and exposure requirements through the project’s normal qualification process. Do not assume that an unchanged air-entraining-admixture dose will produce unchanged air after ECLIPSE is introduced; confirm it in the actual mixture.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How should ECLIPSE be compared with another shrinkage strategy?

Compare alternatives against the same project objective and the same reference mixture. A fair decision considers application and exposure, air-entrainment requirements, dose and addition sequence, compatibility with other admixtures, set and strength effects, target joint spacing and measured ASTM C157 performance.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
  • Choose ECLIPSE 4500 when the work spans ready-mix, precast, prestressed or post-tensioned members, mortar, grout or wet-mix shotcrete and the trial program supports the selected rate.
  • Choose Floor 200 when the documented application is an indoor slab-on-grade and the team is evaluating shrinkage and curling in that floor system.
  • Delay selection when the supplier, regional formulation, air behavior or compatibility with the existing admixture package has not been confirmed.
  • Retain conventional controls such as aggregate optimization, low water content, curing, jointing and reinforcement. ECLIPSE is an admixture, not a replacement for those measures.

What are the most common specification and field mistakes?

Most problems come from treating a typical dosage or product-page percentage as a promise. The following checks prevent the most avoidable errors.

  • Using the wrong formulation: Floor 200’s indoor slab positioning and Type S statement do not automatically apply to ECLIPSE 4500. Put the exact product name and data-sheet revision in the submittal.
  • Mixing regional data: The detailed dosage sheets are US documents, while the large percentage reductions cited above come from a UK page. Keep geography and formulation attached to every performance statement.
  • Skipping the reference concrete: Without a no-ECLIPSE control, a lower strain cannot be attributed confidently to the admixture.
  • Changing water after dosing: Jobsite water alters the concentration and can change slump, strength, set and shrinkage. Require approval and documentation for adjustments.
  • Ignoring set time: The typical sub-one-hour extension for ECLIPSE 4500 can matter during cold weather, long hauls or tight finishing windows. Confirm setting behavior in the trial.
  • Assuming lower shrinkage means no cracks: Restraint, joints, curing and thermal effects still govern cracking. Keep the structural and concrete-shrinkage details coordinated.
  • Using an uncalibrated dispenser: A nominal plant setting is not proof of delivered dosage. Calibrate, record and periodically verify the liquid delivery system.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What should a project submittal and placement checklist contain?

A complete submittal makes the admixture traceable from specification through placement. Include:

  • Exact formulation, manufacturer, regional technical data sheet date and safety data sheet.
  • Selected dosage in both the plant’s working units and the project specification units.
  • Reference, low-dose and high-dose trial results, including ASTM C157 conditions and laboratory qualifications.
  • Fresh-property data: slump or flow, air, temperature, density, setting observations and strength requirements.
  • Compatibility confirmation for cement, supplementary cementitious materials, air entrainer, water reducer, retarder, accelerator and other admixtures.
  • Batching sequence, dispenser calibration record, mixing time and rules for jobsite water additions.
  • Curing method, joint layout, expected joint spacing and the crack-control measures that remain independent of ECLIPSE.
  • Acceptance criteria and a process for handling a load that falls outside air, slump, temperature or set requirements.

Before construction, have the concrete producer, testing laboratory, installer and design team sign off on the same mixture identification. Requalify if the cementitious materials, aggregate source, admixture package, water content, curing regime or exposure changes materially.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Where can the technical documents be found?

Use the manufacturer’s current documents rather than an archived quotation or an unverified reseller listing. The primary references are the US ECLIPSE 4500 technical data sheet, the US ECLIPSE Floor 200 technical data sheet, and Chryso’s TB-1000 technical bulletin. Confirm availability, handling instructions and local compliance with the supplier before the first production batch.

Frequently Asked Questions

Can ECLIPSE eliminate concrete cracks?

No. It targets drying-shrinkage strain, while cracks can also result from thermal movement, restraint, settlement, plastic shrinkage, poor curing and joint or reinforcement details. Use it alongside a complete crack-control design and verify the actual mixture.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

Is ECLIPSE 4500 the same as ECLIPSE Floor 200?

They are separate formulations with different documented application scopes. Floor 200 is positioned for indoor slab-on-grade work and has its own ASTM C494 Type S statement; do not transfer that statement to ECLIPSE 4500 without current product documentation.

Can ECLIPSE be added at the jobsite?

The US ECLIPSE 4500 sheet generally places addition after dry materials and most of the water, with plant-controlled mixing. Any field addition or water adjustment should follow the current supplier instructions and be recorded because it changes concentration and fresh-concrete behavior.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Does a lower ASTM C157 result guarantee longer floor-joint spacing?

No. Joint spacing also depends on slab geometry, restraint, curling, temperature, reinforcement, curing and construction timing. Treat ASTM C157 as one qualification input, then have the design team confirm the joint layout for the actual floor.

What documents should be checked before specifying ECLIPSE outside the United States?

Obtain the technical and safety data sheets for the product supplied in that country. US dosage guidance and UK product-page results may describe different regional formulations, so local dosage, classification, handling and performance claims must be confirmed separately.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 13, 2026 8:21 am GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.