Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Benjakitti Forest Park is a public wetland park created on the former site of a tobacco factory in central Bangkok. Its transformation replaced much of an almost entirely paved brownfield with wetlands, islets and porous ground, while retaining trees and reusing buildings and concrete. The design was intended to manage monsoon runoff, improve water quality, support habitat and provide public space—not just add ornamental landscaping.
The project shows how landscape and construction decisions can work together: excavated and reused material shaped a water-sensitive site, and existing assets became part of the new park. But reported water figures describe different systems and should not be treated as interchangeable proof of flood reduction.
As an Amazon Associate I earn from qualifying purchases.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
What was Benjakitti Forest Park before it became a wetland?
The park occupies a former tobacco-factory property in Bangkok’s Khlong Toei area. The Cultural Landscape Foundation describes the completed park as approximately 102 acres and dates its completion to 2022. The site had been an industrial property with extensive paved ground; the American Society of Landscape Architects (ASLA) describes it as almost entirely paved before redevelopment.
That starting condition matters. A large paved site sheds rainwater rather than allowing much of it to soak into the ground. In a city that experiences monsoon rainfall, the project team’s challenge was therefore not simply to make the former factory grounds greener. The design had to reorganize the land so it could accommodate water, create varied ecological conditions and remain usable as a public park.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
Turenscape and Arsomsilp are credited as the design team. The ASLA award entry identifies Thailand’s Ministry of Finance as the client. The project is associated with the “sponge city” approach: using landscape form and ecological systems to absorb, hold, filter or otherwise manage water while serving other urban needs. That description is a design framework, not by itself a measurement of how much flooding the park prevents.
How did the design transform the paved brownfield?
The documented design moves were to preserve existing trees, adapt factory buildings for reuse, recycle demolished concrete for earthwork and paving, and use cut-and-fill to create wetlands, porous areas and islets. In combination, these decisions changed both the site’s surfaces and its topography.
Cut-and-fill means excavating material in some places and using it elsewhere to shape the site. At Benjakitti, the ASLA project account links that approach to creating wetlands and islets. Rather than treating excavation solely as a way to clear the site, the design used changes in ground level to make room for water and establish different landscape conditions. The available sources do not give detailed construction drawings, quantities of excavated material or a construction sequence, so those should not be inferred from the finished landscape.
Replacing hard ground with a porous landscape was central to the transformation. Wetlands and planted ground can interact with rainwater differently from continuous paving: the design intent was to retain stormwater during monsoon periods and create a landscape that could support water-related and ecological functions. This does not mean every paved area was removed, or that the park alone manages Bangkok’s rainfall. The project description supports a site-scale design strategy, not a claim that the wider city’s drainage needs have been solved.
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
Retaining trees and reusing structures also made the existing site part of the design rather than treating it as a blank slate. Factory buildings were adapted for reuse, according to the ASLA account. The sources do not specify which buildings now serve which uses, or quantify the amount of demolition avoided. The sound conclusion is narrower: the project incorporated existing trees and buildings into its redevelopment plan.
Recycling concrete gave material from demolition a second use in earthwork and paving. That can reduce the need to discard material and bring in entirely new fill or paving inputs, although the cited project account does not provide tonnage, transport distances, embodied-carbon calculations or a quantified waste reduction. The material-reuse strategy is documented; its precise environmental savings are not.
Recommended Free Tools
How is the park intended to manage stormwater?
The park’s water strategy combines landform, wetlands and a connected constructed wetland system. The functions described by project and institutional sources include retaining rainwater, treating polluted runoff and cleaning canal water. Those functions are related, but they are not the same, and the published figures refer to different scopes.
ASLA’s 2024 award entry says the design is expected to retain up to 200,000 cubic metres of stormwater during monsoon season. This is an expected retention capacity stated in the project account—not a measured annual flood-reduction result. The Cultural Landscape Foundation separately describes four lakes with capacity for one million cubic metres of stormwater. Its retrieved page does not state a year for that figure, and the available descriptions do not explain how it relates to ASLA’s estimate.
Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
A third figure refers to water treatment, not rainwater storage. The Centre for Liveable Cities’ 2025 Bangkok case study reports that a connected constructed wetland can clean up to 8,152 cubic metres of canal water per day. A daily treatment flow describes water moving through a treatment system; it cannot be added to a storage capacity or used as a substitute for one.
| Reported figure | What the source says it describes | Source and date |
|---|---|---|
| Up to 200,000 m³ | Stormwater expected to be retained during monsoon season | ASLA, 2024 |
| One million m³ | Capacity of four lakes described as holding stormwater | The Cultural Landscape Foundation; year not stated on the retrieved page |
| Up to 8,152 m³ per day | Canal water cleaned by a connected constructed wetland | Centre for Liveable Cities, 2025 |
These are separate reported claims, not three measures of one performance outcome. The sources do not establish a common measurement method or reconcile the two storage figures. For a construction or landscape project, that distinction is essential: a design capacity, a lake volume and a daily treatment flow answer different questions. None alone demonstrates how the site performs through a particular storm, season or year.
The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →Why combine water management with habitat and public space?
The project is described as serving several purposes at once: regulating monsoon stormwater, filtering polluted urban runoff, providing habitat for native species, and offering downtown residents recreation and cultural space. The landscape is therefore not presented as a single-purpose drainage basin. Wetlands, planted areas, pathways and retained structures contribute to a public environment as well as to water-related aims.
The ASLA entry describes a planting strategy intended to establish a semi-natural community across varied micro-environments, with limited maintenance. This is the project’s design intent, not an independently measured finding about long-term maintenance needs. The sources provided do not give a maintenance budget, staffing plan, survival rate for planting or long-term ecological monitoring results.
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
Habitat claims also need a date and attribution. An International Union for Conservation of Nature report from 2025 gives a figure of 91 bird species in its park summary. That is a reported biodiversity figure, not a current census established by the sources here. It offers evidence that the park has ecological significance, while leaving open how species numbers change over time and how they were surveyed.
What can visitors experience in the park?
Project materials describe boardwalks and a skywalk that connect parts of the park and offer a route through tropical foliage. These features allow visitors to experience the landscape at different levels and move through planted areas rather than viewing the park only from its perimeter. They are part of the project’s public-recreation role, alongside its ecological and water-management aims.
Current opening hours, entry arrangements, facilities and access rules were not verified in the sources used for this account. Visitors should consult current information from the park authority before planning a trip rather than relying on older project descriptions for logistics.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What can construction projects learn from the transformation?
Benjakitti Forest Park is useful as a case study in making site constraints part of the design brief. The starting point was a paved former industrial property. The documented response connected earthwork, water, materials, existing trees and buildings, habitat and public use instead of treating each as an isolated issue.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
- Plan grading around water as well as access. Cut-and-fill can form wetlands and islets, but the sources do not provide project-level grading data. The transferable lesson is to coordinate landform and water goals early, not to assume this park’s exact earthwork solution fits another site.
- Inventory what can remain or be reused. Existing trees, factory buildings and demolition concrete were incorporated into the project account. A careful site inventory can identify assets before clearance decisions are made, though the extent of reuse and its savings need project-specific documentation.
- State performance metrics precisely. Retention capacity, lake storage and daily water treatment are distinct quantities. Project teams should identify the system, time basis, source and whether a figure is expected, designed or measured.
- Design for more than one public benefit. The park’s stated aims include water regulation, runoff treatment, habitat, recreation and cultural use. A multifunctional brief can help explain why the landscape includes both ecological systems and visitor routes.
- Separate design intent from operational evidence. A planting plan intended to need limited maintenance is not proof of actual maintenance performance. Long-term claims require monitoring information that is not supplied in the project summaries cited here.
The construction story is thus not simply “factory site becomes park.” It is a change in how the site’s ground, water and existing assets are organized. Its strongest documented lessons are about integrating earthwork and material reuse with a broader landscape plan, while being careful not to overstate results that the available sources do not measure.
What the project demonstrates—and what it does not
Benjakitti Forest Park demonstrates that a former, heavily paved industrial site can be reworked as a public landscape that combines wetlands, planted ground, reused structures and recreation. The project descriptions make a credible case for an integrated design strategy, supported by explicit accounts of cut-and-fill, tree preservation and recycled concrete.
Do these 3 things before closing this tab:
1Scan for outdated or missing drivers - takes under a minute2Clear out junk files and repair common Windows errors3Fix the driver behind crashes, sound loss and screen glitchesThey do not, on their own, establish a long-term flood-reduction percentage, a common reconciliation of published water-capacity figures, or quantified carbon and waste savings. Reading the project accurately means holding both points together: it is a substantial brownfield transformation with multiple intended functions, and its reported capacities and ecological outcomes must remain attached to their specific sources and definitions.
Frequently Asked Questions
Who commissioned Benjakitti Forest Park?
The ASLA award entry names Thailand’s Ministry of Finance as the client and credits Turenscape and Arsomsilp as the design team. The Cultural Landscape Foundation also associates the project with those firms.
What rainfall context did the project account cite?
ASLA’s 2024 project entry gives about 1,500 millimetres as average annual precipitation for the regional context. That is rainfall context, not a measured amount captured by the park.
How many bird species are reported at Benjakitti Forest Park?
An IUCN report published in 2025 gives 91 bird species in its park summary. It should be read as a figure attributed to that report, not as a live or independently verified census.
Quick wins for a faster PC:
Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Repair Windows errors before they cause bigger problemsFix Now →

