DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowBlack Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsPC HealthRecommendedCrashes, freezes, slowdowns? Check your PC nowSpot repairable issues before they interrupt work.Check PC×
BETTESWORTHConstruction

How a Wisconsin Medical Center Used a Voided Biaxial Slab to Cut Concrete and Structural Weight

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

A voided biaxial slab can remove concrete from the low-stress central zone of a two-way floor while retaining the reinforcement and concrete needed for structural action. In the project covered here, ProHealth Care’s 76,140-square-foot D.N. Greenwald Center in Mukwonago, Wisconsin, used BubbleDeck void formers; Building Design + Construction reported a 30% reduction in non-axial dead load and 786 cubic feet of concrete saved.

Those numbers describe one 2016 case study, not a guaranteed result for every building. The slab still requires project-specific engineering for stiffness, shear, openings, local code compliance, construction sequencing and support conditions.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is a voided biaxial slab?

A voided biaxial slab is a reinforced-concrete floor designed to span in two directions, with hollow formers placed in the slab’s central region. The central zone is close to the slab’s neutral axis, where concrete contributes less to bending resistance than the concrete near the top and bottom faces. Replacing selected central concrete with hollow plastic formers reduces self-weight while leaving a two-way reinforced-concrete system around the voids.

BubbleDeck describes its system as recycled-plastic void formers held in reinforcement modules and embedded in a cast-in-place slab. The manufacturer’s product overview distinguishes this from a conventional solid slab: the voids are distributed through the panel rather than concentrated in a single service trench or beam pocket. The result is still a concrete slab, not a lightweight finish or a suspended ceiling system.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

“Biaxial” refers to load transfer in two perpendicular directions. That matters in square or nearly square floor panels supported by columns, walls or beams on more than one side. A project engineer must still determine whether the proposed geometry, span-to-depth ratio, support layout and loading justify two-way action; the presence of void formers does not automatically make any floor a biaxial slab.

What did the D.N. Greenwald Center case study report?

The project was ProHealth Care’s D.N. Greenwald Center in Mukwonago, Wisconsin. Building Design + Construction’s January 20, 2016 case study describes a 76,140-square-foot facility with a medical walk-in clinic, emergency services, an ambulance garage and expanded imaging services.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Project fact Reported information
Facility ProHealth Care D.N. Greenwald Center
Location Mukwonago, Wisconsin
Area 76,140 square feet
Slab system BubbleDeck voided biaxial reinforced-concrete slab
Reported non-axial dead-load reduction 30%
Reported concrete saving 786 cubic feet
Reported fabrication-drawing schedule saving Eight weeks
Case-study source Building Design + Construction, 2016

The article says the recycled-plastic void formers displaced concrete along the slab neutral axis. It attributes the 30% reduction in non-axial dead load and the 786-cubic-foot concrete saving to this project. The article does not disclose the baseline slab quantity, the calculation method, or independent verification of those figures, so they should be read as reported project results rather than a performance guarantee.

The named project team included Eppstein Uhen Architects, Pearson Engineering for mechanical, electrical and plumbing work, Mortenson as construction manager and GRAEF for fabrication drawings. The case study says GRAEF’s drawings saved eight weeks; that is a project-specific schedule statement, not a standard duration for every BubbleDeck job.

How is a BubbleDeck slab assembled?

The exact sequence depends on whether the project uses cast-in-situ reinforcement modules or a precast half-slab. In both versions, the voids must be located accurately, restrained during the pour and coordinated with reinforcement, supports, penetrations and temporary works.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
  1. Set the formwork or precast base. For a cast-in-situ solution, crews place traditional horizontal formwork. The manufacturer’s precast half-slab option uses a precast concrete bottom layer that replaces the horizontal portion of the formwork.
  2. Position the reinforcement modules and void formers. BubbleDeck’s Type B installation manual describes reinforcement modules containing the plastic void formers. Their spacing, cover, edge conditions and support-zone details follow the project drawings.
  3. Install remaining reinforcement. Bottom and top reinforcement, punching-shear reinforcement, perimeter bars, column strips and local solid zones are completed as required by the engineer.
  4. Check services and openings before concrete. Medical buildings often have dense mechanical and electrical coordination. Penetrations that were not designed into the slab can conflict with voids or reinforcement and may require a revised detail.
  5. Place and consolidate concrete. The modules are encased in concrete on site. Pour planning, vibration, cover checks and protection of the void formers are construction-control issues, not optional finishing steps.
  6. Cure, strip and inspect. Formwork removal, curing and inspection follow the project specification. A precast half-slab can reduce horizontal formwork, but it introduces lifting, delivery, bearing and temporary-propping requirements that must be planned.

The manufacturer’s implementation guidance presents the system as conventional reinforced-concrete design with system-specific adjustments. That means the formers are not a substitute for structural drawings, a pour plan or a temporary-works design.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How much concrete and weight did the project save?

For the D.N. Greenwald Center, the published figures are 786 cubic feet of concrete saved and a 30% reduction in non-axial dead load. Building Design + Construction linked the reduction to removing concrete from the slab’s central region while maintaining biaxial strength.

Neither figure can be converted into a universal percentage for another project without a new design. Results depend on panel dimensions, slab thickness, column spacing, design loads, support conditions, edge zones, openings, required fire and acoustic performance, and how much of the floor must remain solid for shear or services. A building with many irregular penetrations or heavy concentrated loads may have less voided area than a regular grid.

The case study does not publish the original concrete volume, so the 786-cubic-foot saving cannot be independently reconstructed from the article alone. It also does not provide a life-cycle assessment, embodied-carbon calculation or independent verification that every environmental claim was achieved on the building. Reduced concrete volume can be a useful project objective, but environmental conclusions require a defined baseline and a full assessment of reinforcement, plastics, transport, lifting, formwork and end-of-life treatment.

Does reducing dead load change the structural design?

Yes. Removing concrete changes more than the truck quantity. The engineer must account for the lower permanent load, altered stiffness and reduced shear capacity in voided portions. BubbleDeck’s implementation guidance says designs generally begin with conventional solid-slab methods under applicable local standards, then apply system-specific adjustments.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

Shear is especially important near columns, walls and other supports. The manufacturer indicates that high-shear regions may remain solid or receive additional shear reinforcement. A void that is acceptable in the middle of a span may be inappropriate beside a column because punching shear and load-transfer demands are concentrated there.

Lower self-weight can affect several downstream decisions:

  • Support reactions: Columns, walls, foundations and piles may see lower permanent reactions, but the revised load path must be calculated rather than assumed.
  • Deflection and vibration: Lower mass does not automatically mean lower deflection. The engineer must use the system’s adjusted stiffness and check serviceability under the governing code.
  • Shear and punching: Voided zones have less concrete available for shear resistance, so solid bands, thicker regions or added reinforcement may be required.
  • Fire, acoustics and durability: Cover, fire rating, impact, sound transmission and exposure requirements remain project requirements. The available data does not establish a universal fire or acoustic rating for every configuration.
  • Openings: A later penetration can cut reinforcement or intersect a former. The manufacturer’s FAQ says post-construction openings require confirmation from the BubbleDeck Group; the project engineer must approve any alteration.

What should the design team verify before specifying a voided slab?

Owners should ask for a documented engineering basis before treating the system as a value-engineering option. A practical review includes:

  1. Define the structural grid and loads. Provide spans, column sizes, wall lines, live loads, equipment loads, partitions, façade reactions and any vehicle or impact loads.
  2. Map solid and voided zones. Identify column strips, wall supports, transfer areas, balconies, edges, cantilevers, penetrations and locations where high shear requires solid concrete.
  3. Confirm the code path. The engineer should identify the current local structural and fire standards, material design strengths, load combinations and any approval or peer-review requirements.
  4. Check serviceability. Review deflection, vibration, crack control and long-term effects using the adjusted stiffness rather than assuming solid-slab behavior.
  5. Coordinate services early. Freeze major penetrations, sleeves, drains, medical-gas routes and equipment anchors before reinforcement modules are fabricated.
  6. Design temporary works. Account for delivery, lifting, propping, pour sequence, construction loads and the capacity of formwork or precast bearings.
  7. Plan quality control. Specify checks for module placement, cover, reinforcement continuity, concrete consolidation and records of any field changes.
  8. Set an alteration protocol. State who may approve drilling, coring, scanning or cutting after construction and require written confirmation before work begins.

BubbleDeck’s FAQ says the product requires professional-engineer endorsement. That manufacturer guidance reinforces a basic rule: the local project engineer, not a generic product diagram, controls the final design and code decision.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What are the construction trade-offs?

A voided slab can trade concrete volume for coordination and installation work. The cast-in-situ module approach retains familiar concrete placement but adds factory-made modules that must arrive in the correct sequence and stay accurately positioned. The precast half-slab can remove much of the horizontal formwork, yet it requires transport planning, crane capacity, bearing details and temporary stability.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

Regular floor plates are generally easier to module than heavily irregular plans. Dense openings, transfer structures, unusual edge geometry or concentrated loads can force more solid areas and reduce the potential saving. Site access also matters: a project may have enough lifting capacity for precast units but limited laydown space, or the reverse.

Cost should be evaluated as an installed system, not as a concrete-only comparison. The estimate should include void formers, reinforcement, fabrication drawings, engineering review, formwork or precast units, cranes, temporary propping, labor, concrete placement, inspection and any schedule effect. The supplied case study reports no installed price, so it cannot support a claim that BubbleDeck is cheaper than a solid slab on another project.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What does the eight-week schedule figure mean?

Building Design + Construction reported that GRAEF’s fabrication drawings saved eight weeks on the D.N. Greenwald Center project. The article does not define whether the comparison was against a particular baseline, nor does it establish that every project receives the same benefit.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

For a new project, schedule analysis should separate design production from manufacturing, delivery, erection, reinforcement, concrete pours and curing. Early release of coordinated drawings may help a fixed construction sequence, but late architectural or MEP changes can erase that advantage. Treat the eight-week figure as evidence of what the named team reported, not as a promised lead-time reduction.

Can a voided biaxial slab replace a solid slab on any project?

No. It is an option that may fit some regular two-way floor systems after engineering review. The correct comparison is project-specific: span and loading, dead load, stiffness, shear behavior, formwork, temporary works, lifting, concrete and reinforcement quantities, schedule assumptions, code basis and installed cost.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

A solid slab may remain preferable where the plan has many penetrations, severe support shear, transfer forces, short spans, unusual vibration criteria or limited access for modules. Conversely, a voided system may deserve study where self-weight is a major design driver and the floor grid allows repeatable modules. The case study supports investigating the option; it does not identify a universal winner.

What can be concluded from this case study?

The D.N. Greenwald Center demonstrates a specific use of voided biaxial construction: recycled-plastic formers displaced concrete near the neutral axis, and the published project account reports 30% lower non-axial dead load and 786 cubic feet less concrete. Those are useful reference points for an early feasibility discussion.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

They are not a generic slab calculator. The source does not publish the baseline quantity, calculation method or independent verification, and the manufacturer’s technical material is product guidance rather than independent test evidence. Any owner considering the system should request stamped calculations, local code documentation, fire and acoustic information where applicable, a temporary-works plan, coordinated opening details and a project-specific cost and schedule comparison before committing.

Frequently Asked Questions

Can contractors drill or core a BubbleDeck slab after construction?

Not without approval. BubbleDeck’s FAQ says post-construction openings need confirmation from the BubbleDeck Group, and the project engineer must check reinforcement, void locations, shear and the proposed opening detail before work starts.

Is the recycled-plastic void former itself a structural member?

No. The former creates an intentional void; the surrounding reinforced concrete and reinforcement provide the structural system. Its exact material, restraint and fire-related requirements must be accepted in the project design rather than inferred from the word “recycled.”

Is a 30% dead-load reduction normal for every voided slab?

No published evidence in this case establishes a typical percentage. The reported 30% applies to the D.N. Greenwald Center and will vary with slab depth, spans, support zones, openings, loads and the proportion of the panel that can safely be voided.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What information should be included in a tender for this system?

Include the structural grid, design loads, slab zones, void-module layout, concrete and reinforcement specifications, lifting or propping requirements, service penetrations, inspection hold points and the engineer’s alteration procedure. Requiring these items lets bidders price the complete installed system instead of comparing concrete volume alone.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.