Black Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan NowBlack Friday PreviewAmazon USThe best pick may show up before FridayAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction

Home Improvement Contracts: The Scope, Payment, and Change-Order Checklist

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

A home improvement contract should spell out the work and materials, the price or pricing method, payment schedule, estimated dates, contractor details, and important promises. Put any change in a written document signed by both sides before the changed work begins, with the revised cost and any payment or schedule impact. Exact legal requirements vary by state and locality, so use this as a general U.S. checklist—not a substitute for checking the rules where the property is located.

What should a home improvement contract include?

A useful contract makes it possible to tell what the contractor agreed to do, what the homeowner agreed to pay, and how the parties will handle changes. The Federal Trade Commission (FTC) recommends getting the project details in writing, including a description of the work and materials, payment schedule, estimated start and completion dates, and the contractor’s contact and license information where required. Promises made in conversation about the scope, labor, or material costs should also appear in the written agreement.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

There is no single nationwide contract form or universally applicable list of mandatory terms established by the sources cited here. State law, local rules, the type of project, and the circumstances of signing can affect what must be included. Treat the checklist below as a way to make expectations clear, then confirm any local requirements with the relevant state or local consumer agency.

How specific should the scope of work and materials be?

Describe what will be done, where it will be done, and what materials or specifications are included. The more clearly the written scope distinguishes included work from exclusions, the easier it is to compare bids and identify whether a later request is truly a change.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

A phrase such as “renovate bathroom” may not tell either party enough to assess the finished work. A more useful description identifies the work areas and tasks, the materials or specifications agreed upon, and any important limits or exclusions. For example, if a proposal names a particular material, product grade, or finish, make sure that detail is carried into the signed agreement rather than left only in a sales conversation. This is practical drafting guidance based on the FTC’s recommendation to describe work and materials; it is not a claim that every state requires a particular level of detail.

Record what is not included as well as what is. If a task, material, or service is outside the agreed price, state that clearly so it is not mistaken for part of the job. The contract should also capture any promises about labor or material costs that affected the homeowner’s decision.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How should price and payments be written?

State the total price when the work has a fixed price. If the project is priced on a time-and-materials basis, identify the applicable rates and how costs will be estimated, tracked, or billed, as well as what may be charged separately. The agreement should make clear whether a figure is a fixed price, an estimate, or a pricing method that can change as work proceeds.

List the deposit and each later payment, together with the date or milestone that triggers it. A schedule should be understandable before work starts: both parties should be able to identify what work or event makes a payment due. Do not rely on a vague promise to “pay as we go” if the contract can describe the intended schedule more clearly.

The FTC recommends negotiating a reasonable down payment and cautions that some states limit down payments. It does not establish one deposit percentage for the entire country. Check the rules where the project is located rather than treating a percentage found in another contract or article as a national standard. The FTC also advises homeowners not to pay the full amount up front and not to make final payment until the work is complete and satisfactory. Keep invoices and receipts for payments.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

A payment schedule is especially important when a project has stages or when a change affects the price. If the parties approve added work, the written change order should say whether the existing progress-payment plan changes, whether an additional payment is due, and how the revised total will be paid.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Which dates and schedule details belong in the agreement?

Include estimated start and completion dates. If the job is staged, list the principal phases or milestones so the schedule is not reduced to a single end date. These are estimates, not a guarantee that no delay can occur; the important point is to record the schedule the parties are using as their baseline.

When a change affects the expected finish, state the schedule impact in the change order. California’s Contractors State License Board sample contract includes the effect of a change on the completion date among the change-order details. That is a useful official example, not proof that the same wording is mandatory in every jurisdiction.

What contractor information and promises should be recorded?

Write down the contractor’s name, address, and phone number, along with a license number where required. The FTC recommends checking a contractor’s license with the relevant state or county government and asking for proof of insurance before committing. Verify the information with the appropriate local authority rather than assuming that a number on a proposal is current or sufficient.

Put material promises in the signed agreement: this includes agreed scope, labor or material costs, and other commitments that matter to the project. Keep supporting documents such as estimates and written correspondence with the contract. The contract is easier to use later when its terms can be read alongside the records that explain what was agreed.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

How should a change order work?

Use a written change order signed by both the homeowner and contractor before work on the changed item begins. The document should describe the revised work and materials, add or subtract the cost, show the new contract total, and explain any effect on payments or the expected completion date.

  1. Describe the change. Identify the work or materials being added, removed, or revised. Avoid a change order that says only “extra work” without defining what that means.
  2. Show the price effect. State the amount added or subtracted and the revised total. If the pricing method means the final amount is not yet known, clearly record the method and any estimate or limit that applies, subject to local rules.
  3. Update payments and timing. Explain whether progress payments change, when any payment for the change is due, and whether the completion date or project sequence shifts.
  4. Date and sign it before proceeding. Include the date and signatures of both parties. Keep a copy with the original contract and other project records.

Official examples illustrate why location matters. New York City’s Department of Consumer and Worker Protection says its local requirement is that change orders be written and signed by the contractor and consumer, and its checklist references the additional-work cost, new contract price, and payment due date. California’s Contractors State License Board sample contract calls for a written order signed before changed work starts and describing its scope, price adjustment, and effect on progress payments or completion. These examples support a sound process, but their exact statutory requirements should not be generalized to every state.

Pennsylvania provides a separate example for certain covered time-and-materials contracts: its Attorney General’s FAQ describes a written initial estimate, a ceiling of 10% above that estimate, and a written change order signed by the owner and contractor before exceeding that amount. That is Pennsylvania-specific guidance for the contracts it covers, not a nationwide threshold. Confirm how the rules apply to the particular project before relying on it.

What should you do before signing?

Read the entire agreement and any attachments, fill in blank spaces, and make sure the signed documents reflect the deal you intend to make. The FTC warns against leaving blanks and recommends retaining invoices and receipts. Keep a complete signed copy, estimates, change orders, correspondence, and notes together so there is a record of the project’s terms and later decisions.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Check whether a cancellation notice or other disclosure is required for the circumstances. The FTC describes a three-business-day cancellation right for certain contracts signed in the home or somewhere other than the seller’s permanent place of business. It does not apply to every home improvement contract or situation, and state requirements can differ. Do not assume the right applies—or that the same deadline governs—without checking the relevant guidance.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

Before committing, verify the contractor’s license where applicable and ask for proof of insurance. If something important is missing, unclear, or left blank, ask for a completed written version before signing rather than relying on a verbal assurance to fix it later.

How can you compare home improvement bids?

Get estimates from more than one contractor and compare what each proposal actually includes, not just the bottom-line number. The FTC’s 2022 home repair handout recommends getting three written estimates. This is consumer advice, not a statistical finding or a guarantee that a particular number of bids will produce a better result.

  • Scope and materials: Are the work, specifications, exclusions, and cleanup described clearly enough to compare?
  • Price basis: Is the figure fixed, an estimate, or based on time and materials? What may be billed separately?
  • Payments: Are the deposit and later payment triggers stated clearly?
  • Schedule: Are estimated start and completion dates included, and are stages identified where useful?
  • Changes: Does the proposal explain how added or revised work will be described, priced, approved, and reflected in the schedule?
  • Credentials and promises: Are contractor details, applicable license information, insurance, and project commitments documented?

The FTC advises against automatically choosing the lowest bid and recommends asking about a large price difference. A lower figure may reflect a narrower scope, different materials, or an assumption that is not obvious from the total alone. Ask each contractor to clarify material differences in writing so the comparison is between comparable work.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What belongs in the project record after signing?

Keep the signed contract and all attachments in one place, then add each estimate, invoice, receipt, signed change order, and relevant letter or message. The FTC advises homeowners to keep notes and copies of letters and documents, as well as invoices and receipts. A simple project log can help organize dates, decisions, and documents, but it is not a contract form and does not ensure legal compliance.

After a conversation that changes an expectation, summarize the point in writing and ask the contractor to incorporate any actual scope, price, payment, or schedule change into a signed change order before that work begins. This avoids treating a casual discussion as a reliable substitute for an agreed written record.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

Frequently Asked Questions

Can I make a home improvement contract myself?

You can write down project terms, but a generic template may not include disclosures or clauses required for your location or circumstances. Check state and local requirements before relying on a form, and consider local legal advice if the project or terms are complex.

What if my contractor wants to start changed work before signing a change order?

Ask to pause that changed work until the revised scope, price, payment effect, and schedule are documented and both sides have signed. If the contractor will not do that, contact the consumer or licensing agency for the project’s location about your options before authorizing additional work.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Do I always have three days to cancel a home improvement contract?

No. The FTC describes a three-business-day cancellation right for certain contracts signed at home or away from the seller’s permanent place of business, not every project. The contract’s location and circumstances matter, and other state rules may apply.

Should I sign a contract with blank fields if the contractor promises to fill them in later?

It is safer to ask for a complete version first: a blank can leave uncertainty about a key term or allow later disagreement about what was written. The FTC specifically warns homeowners not to leave blanks and recommends keeping a copy of the signed documents.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.
Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
Windows Errors? Fix Them Before They SpreadFree repair scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.