Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
HD Hyundai’s agreement with U.S. construction and engineering company Kiewit is a plan to build a new American shipyard, not permission to construct U.S. Navy ships at HD Hyundai’s Korean yards. Announced on October 22, 2026, the joint venture expects construction to start in 2027, operations to begin in 2029 and to create about 3,000 U.S. jobs. Its initial scope includes commercial ships, Navy support vessels, and ship blocks and modules for American yards.
Whether a South Korean yard may build a new U.S. Navy vessel is a separate legal question. Federal statutes and recurring Defense appropriations restrictions generally require U.S. Navy ships to be built domestically. A reported proposal allowing a foreign shipbuilder that makes major U.S. investments to build up to two initial vessels in its home country remains contingent: it had not been enacted or implemented as of October 26, 2026.
As an Amazon Associate I earn from qualifying purchases.
What is HD Hyundai building in the United States?
The Kiewit venture is intended to create a U.S.-based industrial platform. The partners say they will examine commercial shipbuilding, vessels that support the U.S. Navy, and the manufacture of blocks and modules that can be delivered to existing American yards. The announced schedule calls for construction in 2027 and targeted operations in 2029, with approximately 3,000 jobs.
That makes the project a domestic-capacity investment rather than a Korean Navy procurement program. A U.S. facility could bid for work that must be performed in the United States, while HD Hyundai’s Korean facilities would remain subject to the laws governing foreign-yard construction.
Popular on Amazon
- The model is built based on the largest first-class battleship built by the United States during World War II and the last first-class battleship in the world to be retired from active service. The finished size of the USS Missouri battleship is: 32.68*4.13*9.45 in.
- MISINI WW2 military series product M6320 (Iowa), the Iowa-class battleship USS Missouri is a majestic sea beast, famous for its spectacular body and powerful firepower. Every brick is part of its majestic structure, and every detail has been carefully rendered, from bow to stern.
- We know that a perfect building block must first of all be of high quality raw materials. The building block boat is composed of 2228 easy-to-install parts, all made of high-quality environmentally friendly ABS material. The building block parts are smooth and polished, and each part fits well, feels smooth and comfortable to hold, and is not easy to loosen. Compatible with mainstream building blocks on the market.
- If you're looking for immersive, fun, and unprecedented brick building challenges, look no further than this MISINI M6320 brick building kit for greater challenge, complexity, and detail. Looking forward to becoming one of your choices.
- Comes with detailed instructions in color with pictures and text, perfect for gifts and personal use. If you encounter any problems during assembly, please feel free to contact us at any time.
Does the Kiewit investment let HD Hyundai build U.S. Navy ships in Korea?
No. Spending money on a U.S. yard does not automatically amend the statutes or appropriations provisions that govern where U.S. Navy ships may be constructed. The investment can improve HD Hyundai’s eligibility for U.S.-based work, but a Korean yard would need a valid statutory or executive-branch exception for new Navy-ship construction.
The distinction matters because several kinds of cooperation are often described together even though they have different legal status:
Free tools Windows power users keep installed
One-click scans. No signup required.
- Industrial cooperation: sharing shipbuilding practices, training and technology.
- U.S. investment: buying, partnering with or building American shipyard capacity.
- Maintenance, repair and overhaul (MRO): servicing existing U.S. Navy vessels at qualified South Korean facilities.
- New-ship construction in Korea: building a new U.S. Navy vessel in a foreign yard, which remains the most restricted channel.
The Congressional Research Service (CRS) reported in March 2026 that no new U.S. Navy ship had yet been constructed in a South Korean yard. It did identify examples of the first three cooperation channels.
What does U.S. law say about foreign-yard construction?
CRS identifies several specific barriers. 10 U.S.C. §8679 generally prohibits construction of ships for the U.S. armed forces in foreign shipyards. 14 U.S.C. §1151 addresses Coast Guard ships, while 10 U.S.C. §8680 limits foreign-yard MRO for U.S. Navy vessels.
Also popular on Amazon
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up.
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs.
- PREMIUM SERIES USS MIDWAY AIRCRAFT CARRIER - 2 Sheet Model with a challenging difficulty level. Once assembled, dimensions are 8.27 L x 2.24 W x 1.38 H inches. 1:1410 Scale.
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all.
Presidential national-security waivers and other exceptions exist, but they are not automatic. The President must notify Congress, and annual Defense appropriations language has continued to restrict Navy construction in foreign yards. Congress can therefore shape, narrow or block an exception even when an administration supports overseas construction.
On October 26, Chosun reported an administration proposal under which a foreign shipbuilder making significant U.S. investments could build up to two initial U.S. Navy vessels in its home country. The report also described different House and Senate positions and said the system was not final. Until Congress enacts the authority and the executive branch implements it, the proposal should be treated as contingent rather than as a current authorization.
Outdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchPC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11How does the U.S. project fit HD Hyundai’s wider strategy?
HD Hyundai has been building a multi-stage U.S. strategy. In 2025, the company discussed potential U.S. shipyard targets and said it needed a domestic manufacturing base. Its naval unit set a goal of 3 trillion won, reported as about $2.2 billion, in annual U.S. Navy warship revenue by 2035.
In April 2025, HD Hyundai signed a best-practice-sharing memorandum with Huntington Ingalls Industries. By January 2026, it had won two U.S. Navy MRO deals, showing that maintenance work can proceed through existing facilities even while new-ship construction remains restricted. Reporting in August 2026 said the company was examining U.S. acquisitions and equity investments after previously emphasizing partnerships.
Also popular on Amazon
- Plastic model kit
- Paints sold separately unless stated
The Kiewit yard would add physical U.S. capacity to those relationships. It could also provide a base for workforce development, supplier qualification and security-compliant production, all of which are harder to establish through a foreign yard alone.
Is the U.S. Navy request for information a contract?
No. An RFI is an information-gathering step, not a binding tender or award. On July 8, 2026, Yonhap reported that the Pentagon and Navy sent RFIs to HD Hyundai and Hanwha Ocean concerning destroyer design and construction capabilities. A separate RFI on medium-sized naval tankers also included Samsung Heavy Industries.
Responses to an RFI help the government understand available designs, pricing, delivery terms, industrial capacity and technical feasibility. They can influence a later solicitation, but they do not guarantee funding, selection or a production schedule. Neither the Kiewit announcement nor the reported RFI identifies a firm Navy production contract for the new yard.
Why are U.S. shipyards short of workers and suppliers?
Workforce capacity is the immediate execution risk. Reuters quoted HD Hyundai naval-unit executive Woo-maan Jeong saying that many U.S. shipyard workers leave within a year and that training new workers can take three to five years. He said establishing a U.S. manufacturing base would become necessary.
Also popular on Amazon
- Difficulty Level: Primary skill level required for assembly, suitable for beginners starting their model building journey
- Finished Dimensions: Length measures 440 mm with deck length of 308 mm when fully assembled
- Complete Model Kit Contents: Includes ship model kits and upgrade accessories for enhanced building experience
- Premium Upgrade Accessories: Features brass cannons, lifeboat model kits and other detailed brass parts for authentic detailing
- Scale Replica Design: 1/96 scale model of the Harvey 1847 classic antique wooden sailboat for historical accuracy
A 2024 U.S. Government Accountability Office survey, as reported by Chosun, found that 85.7%—90 of 105 surveyed shipbuilding and repair companies—reported severe difficulty hiring. The same account identified additional constraints:
- limited depth among domestic suppliers;
- high labor and vessel costs;
- environmental and construction permitting;
- military security and quality certifications; and
- the risk that a new yard will be underused without dependable orders.
These issues mean that breaking ground is only one milestone. The venture must recruit, retain and certify workers, qualify suppliers and secure enough commercial or military work to cover the facility’s fixed costs.
How do the U.S.-yard and Korean-yard routes compare?
| Factor | New U.S. yard | South Korean yard |
|---|---|---|
| Legal eligibility | Aligned with domestic-build rules for work required to be performed in America. | New U.S. Navy ship construction requires a statutory or appropriations exception. |
| Capital and timing | New construction is planned through 2027, with operations targeted for 2029. | Existing facilities can support MRO sooner, but they do not create U.S. production capacity. |
| Workforce and supply chain | Must recruit, train and retain U.S. workers and rebuild supplier depth. | Benefits from concentrated industrial capacity already operating in Korea. |
| Order certainty | RFIs signal interest but are not awards; no firm Navy production contract has been identified for the venture. | MRO has produced contracts, but future deal flow and dock availability remain uncertain. |
| Likely initial scope | Commercial ships, Navy support vessels, blocks and modules. | Design support, technology, training, MRO and potentially foreign-built vessels only if legally authorized. |
OECD data cited in the available data show HD Hyundai represented 44.1% of Korean shipbuilding capacity in 2024, while the country’s ten largest firms controlled 99.7%. That concentration helps explain the appeal of Korean expertise, but it does not remove U.S. location and legal requirements.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What are MASGA and the other major investments?
South Korea’s government and the Maritime Administration’s Shipbuilding and Global Advancement (MASGA) framework was described by CRS in 2025 as a $150 billion commitment supporting U.S. shipbuilding. CRS also said the framework’s financing details and timing were unclear. It should not be read as a $150 billion cash payment to HD Hyundai.
Also popular on Amazon
- HOBBY MODEL KIT – Unassembled model packed in a gift envelope with easy to follow instructions. Ideal for ages 14 and up
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs
- USS MISSOURI – 3 Sheet Model with a challenging difficulty level. Once assembled, dimensions are 12” (L) x 1.5"(W) x 3.25"(H).
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all.
Separately, Hanwha announced a planned $5 billion infrastructure program at Philly Shipyard, including two docks and three quays. These investments illustrate the scale of the industrial push, but each project still depends on permitting, workforce development, supplier capacity and actual orders.
What should happen next?
- Permitting and design: The Kiewit venture must finalize the site, engineering plan and required environmental and construction approvals.
- Workforce build-out: Recruiting, retention, training and certification programs will determine how quickly the yard can reach productive capacity.
- Supplier qualification: Domestic vendors must meet naval quality, cybersecurity and security requirements where military work is involved.
- Order conversion: Commercial, support-vessel or module contracts would provide the utilization needed before a major Navy production program could be considered.
- Legal decisions: Any Korean-yard construction of new U.S. Navy ships would still require Congress and the executive branch to establish and implement a lawful exception.
Frequently Asked Questions
Can blocks made in South Korea be used in a U.S. Navy ship?
Potentially, but only under the requirements of the specific U.S. contract and applicable security, quality and origin rules. Supplying a block or module is not the same as authorizing a foreign yard to build an entire Navy vessel.
The Tool Desk
Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →What does an RFI response require from a shipbuilder?
A company typically describes its designs, facilities, workforce, production methods, estimated pricing and delivery assumptions. Government officials use those responses to shape requirements and assess feasibility before deciding whether to issue a formal solicitation.
Why does the U.S. share of global shipbuilding matter to this project?
Reuters, citing UN Trade and Development data, reported that U.S. yards held 0.04% of global shipbuilding market share in 2024, while China and South Korea together held 83%. The imbalance helps explain the policy interest in importing expertise and rebuilding American capacity, but it does not waive domestic-build laws.
Could the proposed two-vessel overseas exception take effect automatically?
No. The reported proposal would need enacted legal authority, implementing rules and the required congressional notifications or appropriations treatment. Until those steps occur, it cannot be used as a basis for assuming Korean-yard Navy construction is permitted.

