Driver FixRecommendedSound, Wi-Fi or graphics acting up? Check drivers firstFind missing or outdated drivers fast.Check DriversOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run Scan×
Skip to content
Bettesworth Construction
Agenda 111

Ghana Begins Construction of Three 160-Bed Regional Hospitals

Ghana’s Health Minister says contractors have moved to site for 160-bed regional hospitals in Oti, Western North and Savannah. Savannah’s site and expected duration have been reported; key details for the other projects remain unconfirmed.

By Bettesworth Construction Team 3 min read
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Ghana’s Health Minister says contractors have moved to site for new 160-bed regional hospitals in Oti, Western North and Savannah. The projects are under construction, but the available announcements do not establish completion dates or opening dates for all three.

Where are the three hospitals being built?

Health Minister Kwabena Mintah Akandoh announced at the Ministry of Health’s Sector Update in Accra on 7 October 2026 that contracts had been signed and contractors had moved to site for regional hospitals in Oti, Western North and Savannah. Each is planned to have 160 beds. Modern Ghana reported the announcement and quoted the minister. Modern Ghana

As an Amazon Associate I earn from qualifying purchases.

Savannah: Soalepe, near Damongo

The Ghana News Agency reported that work had begun on the Savannah Regional Hospital and Referral Facility at Soalepe, a suburb of Damongo in West Gonja Municipality. The site was handed to FRIDOUG Limited. The report said the project was expected to take two years; that is a stated expectation for Savannah, not a confirmed completion date and not a schedule for the other two hospitals. Ghana News Agency

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Reported components include an outpatient department, patient wards, laundry facilities, a recovery garden, accommodation, streetlights, internal access roads and other supporting infrastructure.

#1 Best Overall
Revell 1:25 ’79 GMC C-35 Dually Pickup Model Kit 14593 – “El Jefe” Custom Big Rig Style Truck, Diesel Engine, Opening Hood, 41 Parts, Skill Level 4 Advanced Build for Adults & Teens (12+)
  • ICONIC “EL JEFE” CUSTOM DUALLY TRUCK - Build the legendary 1979 GMC C-35 squarebody pickup reimagined with bold big-rig styling for a truly unique display piece.
  • DIESEL ENGINE DETAIL WITH OPENING HOOD - Features a detailed turbo-diesel engine under an opening hood, showcasing power and realism in every build.
  • BIG-RIG STYLE CUSTOM FEATURES - Includes sky-high exhaust stacks, air horns, mud flaps, step bumper, and sleeper compartment for a semi-inspired custom look.
  • HEAVY-DUTY DUALLY CHASSIS DESIGN - Detailed chassis rides on big-rig style wheels with six tires, giving the model an aggressive stance and realistic presence.
  • PREMIUM MATERIALS & FINISH OPTIONS - Molded in white and clear with chrome-plated parts and soft black tires for enhanced realism and customization.

Oti and Western North: sites not specified

The minister named both regions, but the announcement and the cited project report do not identify the exact sites or contractors for Oti and Western North. No project-by-project construction schedule is established for those two hospitals.

What is known about capacity, funding and timing?

Project detail What has been reported
Planned capacity 160 beds at each hospital, according to the Health Minister’s 7 October 2026 announcement carried by Modern Ghana.
2026 budget allocation GH¢600 million allocated for construction of the three regional hospitals in Savannah, Oti and Western North, according to the Ministry of Health’s budget announcement. This is an allocation, not evidence of spending or a final contract sum.
Savannah location and contractor Soalepe, near Damongo; FRIDOUG Limited, according to Ghana News Agency.
Savannah expected duration Two years, as reported by Ghana News Agency. The report does not establish a verified completion date for all three projects.
Oti and Western North locations, contractors and contract values Not stated in the cited announcements.

The GH¢600 million figure covers the three hospitals collectively. The Ministry has not published a project-by-project cost breakdown in the cited announcement, so it should not be treated as an equal per-hospital cost. The sources also do not establish how much has been disbursed, construction progress percentages, or when any hospital will open.

Rank #2
Jixin Xyzhi Construction Kits Stem Metal 3D Puzzle Machine Vehicle Model Car Construction Set Toy Parent-Child Interaction Play Sets Gifts for Children Age 4-16 Years
  • 6-in-1 Multi-Functional Design】:This construction vehicle building set includes 6 assembly options, allowing kids to create model cars and construction vehicles like excavators, bulldozers, and cranes. Assemble one model at a time, with the flexibility to disassemble and rebuild for endless fun. Perfect for boys and girls aged 4-6-16 and a great STEM toy for kids aged 4-6-12-16.
  • 【Inspires Creativity and Hands-On Skills】:With 6 unique building set options, this construction vehicle building set encourages creativity and problem-solving. Kids can enhance logical thinking, focus, and fine motor skills through assembling and reassembling. A great screen-free activity for kids who love cars and toys.
  • 【Perfect for Parent-Child Bonding】:The 1-2 hour assembly process makes this construction vehicle building set an ideal parent-child bonding toy. Building together creates lasting memories and strengthens family bonds. A fun indoor activity for family fun and group play, especially for boys who enjoy building sets
  • 【Ideal Gift for Any Occasion】:Combining fun and educational value, this construction vehicle building set keeps kids engaged while reducing screen time. It’s the perfect birthday gift, Christmas toy, or holiday gift for boys and girls aged 6-16, offering both enjoyment and a sense of accomplishment. A great choice for kids who love building kits.
  • High-Quality and Safe Materials】:Made from eco-friendly materials with smooth edges, this construction vehicle building set ensures a safe building experience for kids. Suitable for children aged 6-16, it’s a trusted choice for parents seeking a safe and educational toy. The metal and plastic parts are durable and designed for long-lasting play.

Why does the Ministry say regional hospitals are needed?

The Ministry’s stated rationale is to bring secondary and tertiary services closer to residents and reduce long journeys for specialist care. In September 2026, Ministry spokesperson Tony Goodman cited Oti residents travelling to Accra and said a regional hospital could help provide quality care nearer home, as reported by Citi Newsroom. That is the government’s case for the projects, not a measured estimate of reduced travel or improved health outcomes. Citi Newsroom

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

A Ministry plan for 2026–2029 lists Oti, Western North and Savannah without regional hospitals in its facility inventory. The inventory is based on DHIMS 2 data dated 16 November 2024; it is useful baseline context, not a current 2026 count and not proof that the regions lack other hospitals, clinics or health services. National Development Planning Commission

Rank #3
Revell 85-2627 Peterbilt 359 1:25 Scale 302-Piece Skill Level 5 Model Car Building Kit
  • Revell Model Kit #85-2627, Skill Level 5, Contains 302-Parts, Recommended for ages 13 and up
  • Turning front wheels. Opening doors.
  • Lift-off roof with full sleeper interior.
  • Chains and hoses included. Opening hood with twin turbo diesel engine.
  • Molded in white and clear with chrome plated parts and soft black tires. Requires paint and glue. (not included)

How do the projects relate to unfinished Agenda 111 hospitals?

The decision to start regional hospitals while some Agenda 111 district hospitals remain unfinished has drawn criticism. Former Health Minister Bernard Okoe Boye questioned starting new regional projects before completing those district hospitals and argued that funds could instead finish some of them.

Goodman rejected the suggestion that the regional projects meant abandoning unfinished district hospitals. He described needs at multiple levels and said work on health posts was also continuing. The cited reports do not establish comparative costs, project readiness or which category of facility should take priority, so they do not resolve the policy dispute.

Rank #4
MPC 1984 GMC Pickup 1:25 Scale Model Kit (Black Version)
  • OFF-ROAD KIT FOR INTERMEDIATE MODELERS: MPC’s 1/25 scale GMC Deserter Pickup makes for a great off-road build. Pick it up and start building today!
  • TOUGH TRUCK GOODIES: Built to go off-road! The GMC Deserter kit includes oversized Desert Dog Formula tires and big chrome wheels, a detailed V-8 engine, heavy-duty roll bar with flood lights, front deluxe bull bar with winch, and more! Fully paintable, it features ALL NEW water-slide decals with classic stripes and rad options—wrapped up nicely in eye-popping packaging!
  • QUICK SPECS: 1/25 Scale, 150+ Parts, 7.625 Inches long once assembled. Parts molded in black, clear and transparent red, with black vinyl tires. Some parts are chrome plated. Plastic model kit paint and cement required (Testors or Tamiya brands recommended). Paint guide included in kit. Skill Level 2. For ages 10+
  • THE PERFECT PRESENT: Don't know what to get dad for his birthday? Or maybe you have an avid hobbyist or collector in your life. This model kit makes an ideal gift for any occasion!
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What remains unconfirmed?

  • Exact sites and contractors for Oti and Western North.
  • Individual contract sums for each hospital and actual funding disbursed to date.
  • Verified completion schedules for all three projects, construction progress percentages, and opening dates.
  • Detailed staffing and equipment plans.
  • Whether the other three regional hospitals mentioned by the minister will proceed: he said he had authorization to begin processes toward initiating them in 2027, which is an expectation rather than evidence that contracts or sites are in place.

Until project-specific schedules and progress updates are published, “under construction” describes the reported status; it does not mean a hospital is complete or operational.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Best Value
Nayihoop European Ambulance Building Set, Emergency Rescue Vehicle Model Kit Collectible Truck City Car for Adults & Teens 14+ Compatible with Lego 648PCS
  • Faithful Real-World Design: This building set replicates a real European ambulance, featuring a bright yellow exterior, red-blue warning stripes and authentic medical markings
  • Authentic Structural & Interior Details: This building set features a removable roof, opening side doors, functional medical bay, stretcher space and realistic cockpit, ideal for display and play
  • 648 Piece Building Set: This building set includes a colorful instruction manual, elivering a rewarding building experience
  • Ideal Gift for Ambulance Enthusiasts: Perfect for emergency vehicle fans and creative builders, makes a memorable birthday, Christmas, holiday, or collection-worthy surprise gift
  • Missing Parts Guarantee: Contact us for prompt replacement support

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Site Office

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.