Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Scan for outdated or missing drivers - takes under a minute3Clear out junk files and repair common Windows errorsFrench engineering firm Matière is expanding its Sierra Leone work through the MATIERE/SECON joint venture, which won Lot 1 of the World Bank-financed Sierra Leone Connectivity and Agricultural Market Infrastructure Project (P178683). The award, notified on 28 September 2026, covers the design and construction of two climate-resilient long-span bridges and their link roads. The signed contract is worth US$24,195,636.29 and has a 30-month delivery period.
What Matière is building
Lot 1 combines bridge engineering with the roads needed to connect each crossing to the surrounding network. The contract is not limited to replacing a bridge deck: it requires design and construction of two long-span crossings and their link roads, with resilience to Sierra Leone’s challenging weather and river conditions built into the project brief.
As an Amazon Associate I earn from qualifying purchases.
The World Bank procurement notice records the signed price as US$24,195,636.29. That is the contract value stated at award, rather than an estimate or a recurring annual budget. The 30-month term establishes the planned delivery window from contract commencement; actual completion will depend on mobilisation, site conditions, approvals and construction progress.
Crashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minuteWindows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallHow the MATIERE/SECON joint venture is structured
Matière is delivering the work with Sierra Leonean partner Sean Parpah Chendeka through the MATIERE/SECON joint venture. The award notification identifies Marcel Matière and Philippe Matière as French beneficial owners, each holding at least 25% of the joint venture, alongside Chendeka.
#1 Best Overall
- BUILD A REAL DA VINCI INSPIRED BRIDGE Construct a working model based on Leonardo da Vinci’s famous self-supporting bridge design. This hands-on wooden STEM kit demonstrates real engineering principles through an engaging and rewarding building experience.
- EDUCATIONAL STEM LEARNING EXPERIENCE Explore concepts in engineering, architecture, physics, and history while building. Great for students, hobbyists, makers, homeschool projects, classroom activities, and anyone interested in mechanical design.
- APPROXIMATELY 1 HOUR BUILD TIME Designed to provide an immersive yet manageable project experience. The completed bridge makes an impressive display piece and conversation starter once assembled.
- HIGH-QUALITY WOODEN MODEL KIT – AGE 14+
- Made from durable precision-cut wood components with detailed illustrated instructions. A thoughtful gift idea for teens, adults, engineers, history enthusiasts, and STEM lovers.
This ownership disclosure matters because World Bank-financed procurement places responsibility on the named joint venture while also making its beneficial ownership visible. The arrangement pairs an international bridge contractor with local participation, which can support permitting, workforce coordination, local subcontracting and knowledge of site access and operating conditions. Those potential benefits should be judged against the project’s actual staffing, subcontracting and delivery records as construction proceeds.
Where the contract fits Sierra Leone’s infrastructure programme
The award is part of a broader push to make rural transport usable throughout the year. Sierra Leone’s Ministry of Information and Civic Education has described four earlier bridges—Manowa, Gendema, Tompare and Mattru-Senehun—as investments in agricultural connectivity, movement of people and goods, and community resilience.
The ministry also reported advanced procurement for bridges at four further locations:
Rank #2
- Build 20 different models that each teach about force, load, compression, tension and more
- Over 285 interchangeable building pieces
- Includes 36-page, illustrated experiment manual and Assembly guide
- Skill level: Intermediate
- Komrabai
- Kabba Ferry
- Sumbuya
- Moselolo
These locations are a pipeline, not part of the US$24.2 million Lot 1 contract unless separately awarded. They show how the government is sequencing bridge investments beyond the two crossings covered by Matière and SECON.
The Sierra Leone Roads Authority reported that 443.86 kilometres of roads and 56 bridges were constructed or rehabilitated between 2018 and 2025, including 18 major bridges. The figures describe the authority’s reported national delivery over that period; they do not represent the output of this single contract.
Why climate-resilient bridges matter for farm-to-market travel
For rural producers, a bridge can determine whether crops reach a market at all during the wet season. Flooding, damaged approaches or a weight-restricted crossing can force long detours, raise transport costs and interrupt access to schools, health services and trading centres.
Rank #3
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up.
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs.
- PREMIUM SERIES GOLDEN GATE BRIDGE - 2.5 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 14.45 L x 0.94 W x 2.95 H inches. 1:7535 Scale.
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all.
President Julius Maada Bio has framed the issue in food-security terms: “Farmers cannot access markets without roads and bridges. If our farming communities are not connected, we cannot achieve food sufficiency.” The Matière/SECON scope addresses that connectivity problem by pairing long-span bridges with link roads, rather than treating the crossing as an isolated structure.
“Climate-resilient” is a project requirement, not a guarantee that a bridge will never be disrupted. Performance will depend on the final design, foundations, drainage, approach protection, maintenance and the quality of construction. The useful test will be whether the completed routes remain safe and passable through heavy rains and normal agricultural traffic.
Delivery lessons from earlier rural bridge works
Earlier implementation records show why schedule management will be important. A 2024 World Bank update placed physical progress on four rural bridges between 25% and 48%. Heavy rains halted works from July to November 2023. An attempted coup on 26 November 2023 and the two-week curfew that followed affected contractor mobilisation and the resumption of work.
Rank #4
- THE WOODEN SYDNEY BRIDGE 3D MODEL KIT COMES WITH UNIQUE DESIGN YOU WILL LOVE - Be proud to display your assembled Sydney 3D Bridge Wood Puzzles and share your love for iconic landmarks in Sydney Australia. This wooden 3d puzzle bridge makes a model kit for kids who loves architecture model kits, bridge building kit, and 3D building sets for adults. Ideal for kids to start getting interested in building bridges or young engineers building kit.
- THE SYDNEY 3D BRIDGE WOODEN MODEL KIT PUZZLE IS FOR EVERYONE WHO LOVES ICONIC PUZZLES - The Sydney Bridge 3D wooden puzzles for adults and kids is a craft kit to build for those who love playing mind games. Parents can gift 3D wooden puzzles, or architecture model building like this Sydney Bridge to improve mental speed and problem solving skills of their kids. A good bonding project for family, or as kids architecture kit project for school.
- INCLUDED WITH THE PURCHASE OF THE 3D BRIDGE WOOD PUZZLE KIT - Includes 1 Sydney 3D Bridge Wood Craft Puzzle Decor Model Kit with 55 unfinished natural wood puzzle pieces, manual, and 1 paper for sanding the edges. This DIY puzzle bridge building kit for kids can be painted or colored for a more personalized look. Most parts doesn't require glue as the pieces are interlocking. It measures 16.54Lx4.13Wx5.31H inches. Paint and Glue not included.
- HIGH-QUALITY WOODEN PUZZLES FOR ADULTS AND KIDS - This miniature iconic 3D Puzzle Sydney Bridge Wood Model Kit is made of high-grade 3mm natural wood. All wooden puzzle pieces are laser cut and sanded thoroughly to ensure smooth edges. This bridge building educational 3D puzzle feature realistic details of the Sydney bridge, like its arch and towers. Playfully paint this architecture puzzle toy bridge model kit for kids after assembling.
- IDEAL USE FOR THE SYDNEY 3D BRIDGE ADULTS AND KIDS WOOD BUILDING KITS - Challenge your kids or even yourself to build this DIY 3D wooden puzzle Sydney bridge. A perfect addition to your kids wood project, wooden building kits for adults, or wooden Australia puzzles collection. This architecture model building kit puzzle toy can help kids develop their skills in building wood bridge, raise their IQ, problem solving, and shape recognition.
The Bank proposed extending that project’s closing date to 30 June 2025 so the bridges could be completed. Those events do not establish that the new Lot 1 contract will be delayed, but they identify concrete risks for any bridge programme in the country: seasonal access constraints, security-related restrictions, remobilisation time and the need to align the work schedule with the rainy season.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What to monitor during the 30-month term
Design and resilience decisions
Watch for the approved bridge designs, foundation and flood-protection measures, drainage details and standards for the link roads. These decisions will show how the resilience requirement is being translated into buildable work.
Mobilisation and local participation
Early evidence should include site establishment, surveys, access works, local hiring and disclosed subcontracting. The joint venture’s performance will indicate whether local participation is substantive rather than only a legal feature of the bid.
Best Value
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs
- BROOKLYN BRIDGE – 2 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 5.39"L x 0.91"W x 1.97"H (13.7 x 2.3 x 5 cm)
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all
Schedule and contract management
Progress updates should be compared with the 30-month contractual window and should explain any weather, security, land-access or design changes. A missed milestone is most useful when the cause, revised date and mitigation are made clear.
Connectivity outcomes
After opening, the practical measures are year-round passability, travel-time reliability, safe movement of farm goods, and access for communities on both sides of each crossing. Those outcomes will determine whether the investment delivers more than a completed structure.
The significance of the award
Matière’s Lot 1 award gives the French firm a defined role in Sierra Leone’s rural connectivity programme: two climate-resilient long-span bridges, their link roads, a US$24,195,636.29 contract and a 30-month schedule under a World Bank-financed project. Its wider importance will be established by delivery—on time, with effective local participation, and with roads that keep agricultural communities connected when seasonal conditions are at their worst.
The Tool Desk
Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

