Free tools Windows power users keep installed
One-click scans. No signup required.
Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Fort McCoy says two bridge projects completed in 2026 are now in use: a replacement crossing near Pine View Recreation Area and improvements to Bridge 4 in the cantonment area. The Army reports better access and safer, more reliable crossings, but has not published measured safety results or travel-time savings.
What bridge projects did Fort McCoy complete?
The projects serve different parts of the installation. NRP-03 crosses the La Crosse River near Pine View Recreation Area, while Real Property Bridge 04—also called Bridge 4—spans Tarr Creek in the cantonment area and provides access to the Wisconsin State Patrol Academy and Wisconsin Military Academy. Fort McCoy’s October 28, 2026 announcement says both projects are complete and in use.
As an Amazon Associate I earn from qualifying purchases.
Windows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallCrashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minute| Project | Location and users | Reported work | Access benefit |
|---|---|---|---|
| NRP-03 | La Crosse River crossing near Pine View Recreation Area | Replacement with a concrete box culvert, plus riprap, grading and restoration | Links the campground and Whitetail Ridge Ski Area without the staff detour around the area |
| Real Property Bridge 04 (Bridge 4) | Tarr Creek crossing in the cantonment area; serves the Wisconsin State Patrol Academy and Wisconsin Military Academy | Improvements; the earlier plan described a complete replacement, but the completion announcement provides less detail on the final construction scope | Maintains access to the two academies |
What was done at the Pine View crossing?
Fort McCoy replaced the NRP Bailey bridge near the campground with a concrete box-culvert structure and completed associated riprap, grading and site restoration. The Army says the crossing over the La Crosse River was complete by June 2026.
The change addresses a practical circulation issue in the recreation area. Supervisory Recreation Specialist Alex Karis said staff previously had to drive around the area when traveling between the campground and Whitetail Ridge Ski Area; the new crossing removes that detour for those trips. The Army described the project as improving transportation efficiency, but did not quantify distance or time saved.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
What changed at Bridge 4?
Bridge 4 spans Tarr Creek in Fort McCoy’s cantonment area and provides access to the Wisconsin State Patrol Academy and Wisconsin Military Academy. In January 2026, Directorate of Public Works Director Liane Haun said the bridge was slated for complete replacement during the year, with temporary access effects expected for the academies. The October announcement confirms the work is complete and the bridge is in use, but does not specify an exact completion date or give a detailed final construction scope.
The distinction matters: the Army’s announcement describes the two bridges as completed projects, but the publicly stated construction details are fuller for NRP-03 than for Bridge 4. It is accurate to report that Bridge 4 received improvements and that complete replacement had been planned; the available account does not establish precisely what elements were replaced in the final work.
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
What do the reported contract amounts cover?
The Army article reports two figures tied to different descriptions and award dates. In September 2025, Fort McCoy awarded Larson Construction Co. Inc. of Chippewa Falls, Wisconsin, a reported $1.58 million contract for repair of Real Property Bridge 04 and construction replacing the campground NRP Bailey bridge. Separately, the article reports an $847,271 award to Larson Construction in March 2026 for NRP-03, including the concrete box culvert and associated work.
Those figures should not be added together or treated as interchangeable project totals based on the announcement alone. The source does not provide contract documentation explaining the relationship between the earlier combined effort and the later NRP-03 award, such as whether one amended, supplemented or otherwise related to the other.
Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
What is known about safety and installation infrastructure?
Fort McCoy characterizes the completed crossings as safer and more reliable. Haun’s January planning-era comment about the Pine View Bailey bridge described it as failing and said its replacement would be safer; that was a forward-looking assessment before completion, not an independent post-project inspection finding.
The Army has not published bridge-specific crash counts, inspection ratings, condition scores, or measured safety outcomes for either project. Its announcement supports reporting that the installation says safety and reliability improved, not a claim that a particular risk reduction has been verified.
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
The work is part of a broader infrastructure context: at an April 2026 Installation Real Property Planning Board meeting, Haun noted that much of Fort McCoy’s existing infrastructure dates to the 1940s. The installation also supports more than 100,000 military personnel from all services nearly every year since 1984, according to the Army article. That figure describes installation-wide training support, not use of these bridges.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Frequently Asked Questions
Where is Fort McCoy?
Fort McCoy is a U.S. Army installation in Wisconsin. The bridge announcement identifies the two project areas as Pine View Recreation Area and the cantonment area, but does not give street addresses or visitor directions.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
When was the Pine View bridge completed?
The Army says the NRP-03 crossing was completed by June 2026. Its announcement does not identify a specific day in June.
Who received the reported bridge construction awards?
The Army article names Larson Construction Co. Inc. of Chippewa Falls, Wisconsin, for the reported September 2025 award and Larson Construction for the separately reported March 2026 NRP-03 award. The announcement does not include contract documents clarifying the relationship between the two awards.
Recommended Free Tools
Did the bridge projects reduce accidents or travel time?
The Army announcement provides no before-and-after accident data, inspection findings, or quantified travel-time savings. It reports improved access and describes the crossings as safer and more reliable.

