Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Downtown Burlington businesses spent more than two years coping with blocked entrances, torn-up sidewalks, detours and sharply reduced foot traffic while the Great Streets BTV Main Street project rebuilt underground utilities and redesigned the corridor. The city says the main streetscape work was completed in summer 2026, but a separate water-main closure on October 19 shows that localized construction disruptions have not ended. Owners describe a real short-term business crisis even as some support the infrastructure improvements and expect a more walkable, attractive downtown once remaining work is finished.
Why are Burlington businesses frustrated with Main Street construction?
The disruption was both prolonged and physical. Construction began in February 2024, requiring deep sewer and utility excavation alongside new sidewalks, drainage and public-space features. Storefronts and restaurants faced changing detours, fenced work areas and entrances that were difficult or temporarily impossible to reach.
As an Amazon Associate I earn from qualifying purchases.
Outdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchWindows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstall“We are almost completely blocked off at this point,” Grey Jay and Honey Road owner Cara Tobin told NBC5. Outdoor Gear Exchange executive director of sales strategies Peter Hiskes described the broader effect more bluntly: “We’re struggling down here. I think pretty much every business is.”
The complaints were not limited to a few isolated shops. More than 120 businesses signed a 2025 open letter asking for safer access, better communication and mitigation, according to NBC5. A late-March business meeting drew nearly 100 people, Seven Days reported.
Popular on Amazon
- Sturdy Material: These traffic posts are made of impact proof material, suitable for long-term outdoor use
- Weighted Base: The total weight of the post and heavy-duty rubber base weighs about 7lbs and keeps the large traffic cones in place where you place them
- Highly Visible And Tall Enough: Our large 42-inch safety post has a suitable height for drivers to see, the bright orange color and 4-inch reflective tape are visible during day and night
- Portable And Easy To Store: The orange cones and removable rubber base are two separate parts for easy to assemble and store, and the handle on the top of the pole for easy movement and carrying
- Wide Range Of Uses: Can be used for traffic control, parking lots, parking practices, garages, road construction sites, blocked off the street
How much business did downtown companies say they lost?
Individual accounts show why the project became an economic emergency for some operators, although the figures are owners’ estimates rather than a citywide measurement.
- Café HOT.: Co-owner Travis Walker-Hodkin told NBC5 that staffing fell from 18 employees to six and business was down 40%.
- Henry’s Diner: Owner Patricio Ortiz estimated that sales were 20–30% below the prior year during the 2025 construction pause.
- Kountry Kart Deli: Employee Sarah Brochure said business had not been good but added, “We’re realists. We know it has to be done.”
Businesses responded by cutting hours, changing sales tactics, reducing staffing or closing. Walker-Hodkin summarized the dilemma to Seven Days: “Sacrificing now for later is a really tall order.” A prolonged daytime access problem could not be offset simply by allowing occasional evening or weekend traffic.
What was the Great Streets BTV project supposed to deliver?
The project combined essential infrastructure replacement with a redesigned public realm. Crews worked on a sewer system roughly 150 years old, replaced utilities and added streetscape elements intended to improve walking, outdoor space and stormwater collection. The long-term case is that reliable underground infrastructure and a safer, more attractive corridor can support downtown activity after construction ends.
The financing and scope were complicated. Burlington voters approved a $25.9 million tax-increment-financing bond in 2022. When construction bids came in nearly twice the expected cost, the city reduced the planned corridor before work proceeded. That reduction helped contain the project but did not eliminate the access problems for the blocks under construction.
Also popular on Amazon
- ANSI- and OSHA-Compliant: Our Bilingual, High visibility safety sign meets the rules ensuring safety and regulatory compliance for indoor and outdoor use.
- Expandable & Retractable for Maximum Flexibility: Adjusts to fit different spaces, ideal for driveways, traffic zones, and event crowd control.
- Heavy-Duty & Weather-Resistant: Built with durable materials, designed to withstand outdoor conditions in construction sites, warehouses, and parking lots.
- Perfect for Home & Commercial Use: Use it as a driveway barrier to protect kids and pets or for professional safety control at work sites and venues.
- Quick & Easy Setup: Expands and collapses effortlessly, making it a practical solution for instant safety wherever needed.
Why did the schedule and traffic pattern keep changing?
Construction sequencing, utility conditions and cost changes moved the finish line. In April 2025, Seven Days described work continuing through November 2026. The city’s 2026 address instead said the main project would be completed in summer 2026, and completion-event coverage reported traffic beginning to return. Those statements refer to different points in a changing schedule, not proof that every downtown construction activity ended at once.
In August and September 2025, the city opened Main Street to two-way traffic on nights and weekends as a mitigation measure. That created limited access during periods when daytime work could not stop. Owners said the arrangement did not replace the customers lost during business hours, when lunch, shopping and service visits normally occur.
Do these 3 things before closing this tab:
1Clear out junk files and repair common Windows errors2Fix the driver behind crashes, sound loss and screen glitches3Repair Windows errors before they cause bigger problemsWhat help did the city offer businesses?
City measures included a public-involvement coordinator, business contacts, detour maps, parking promotions and efforts to keep crews working at night or on weekends where possible. Property owners were also offered water-line replacement connected with the construction. The city’s construction portal identifies schedules as tentative, while its Small Business Support page lists business-development contacts.
Those tools addressed information and access, but communication itself remained contested. Owners wanted earlier notice of changes, consistent routes to entrances and mitigation that reflected the difference between a brief closure and months of reduced visibility. A detour map cannot restore a customer who assumes a shop is closed, and a parking promotion cannot fully replace lost pedestrian circulation.
Also popular on Amazon
- 𝗕𝗨𝗟𝗜𝗧 𝗧𝗢 𝗟𝗔𝗦𝗧: Our 4 panels multifunctional fabric fence are made of high density 600D oxford which is coated with waterproof coating to increases tear resistance and effectively prevent small amount of liquid from leaking into the fabric!Constructed of high strength 1" diameter PVC tube which is incredibly durable and impact resistant,high pressure resistant,scratch resistant.UV blocking function prolongs the service life underneath the hot sun and/or in wet weather without fading or rusting
- 7.𝟴𝗙𝗧 𝗜𝗡 𝗟𝗘𝗡𝗚𝗧𝗛 𝗔𝗡𝗗 𝟯.𝟮𝗙𝗧 𝗜𝗡 𝗛𝗘𝗜𝗚𝗛𝗧: The safety barricade system comes with 3 detachable panels in 23"length and 39" heigh.With the butterfly connect locks,you can connect multiple barriers together to form any width or shape,or divide the barriers into two or three panels,adjust the barricade as desired for the amount of coverage needed,you can get max 70 inches width when fully extended,quickly establish a temporary restricted area to prevent staff or pedestrian from entering in
- 𝗘𝗔𝗦𝗬 𝗧𝗢 𝗔𝗦𝗦𝗘𝗠𝗕𝗟𝗘 𝗔𝗡𝗗 𝗙𝗢𝗟𝗗 𝗜𝗡 𝗦𝗘𝗖𝗢𝗡𝗗𝗦: The mobile safety barrier is easy to assemble.All the necessary tools are included!This is a perfect “Do Not Enter” barricade,it only takes a few seconds to complete the folding,the size is only 23"L and 39"H after folded,when you're not using it,you can lean it against the wall or hide it in a corner!Light weight makes it convenient to carry,transport and store
- 𝗛𝗜𝗚𝗛 𝗖𝗢𝗡𝗧𝗥𝗔𝗦𝗧 𝗧𝗘𝗫𝗧: High contrast text meets safety standards.The ANSI approved bright yellow color and black graphics are easily seen and 'Caution' in English is bolstered by the universally recognized 'do not enter' icon,font is clear,not easy to fade!Highly visible yellow and black color scheme make the barrier gate more eye-catching
- 𝗠𝗨𝗟𝗧𝗜𝗣𝗨𝗥𝗣𝗢𝗦𝗘 𝗨𝗦𝗘: Our safety barricades are ideal for creating an effective barrier in pedestrian traffic zones and work zones,separating crowds from entering restricted areas,creating awareness to potential hazards.Great for security elevator and escalator maintenance,construction area,electrical safety.Useful for maintenance workers,repairmen,and other professionals.Used at manufacturing facilities, subways,bus stations,airports ,warehouses,military ect
Is the finished streetscape likely to help downtown?
Business owners are divided between immediate survival concerns and conditional support for the end result. Alison Gibson, an owner of Honey Road, told Community News Service: “The infrastructure needed to happen. The beautification is going to be really lovely.” That view accepts the necessity of the underground work while recognizing that the benefits arrive later than the bills.
The potential gains are practical: smoother pedestrian routes, improved drainage, usable outdoor areas and fewer emergency utility failures. They are not guaranteed sales increases. Businesses still need customers to know they are open, entrances to remain legible and construction information to be accurate while localized work continues.
What is still affecting access after the main project?
Completion of the principal streetscape project did not make every construction impact disappear. An October 19, 2026 advisory documented a temporary closure for a separate water-main project. Such localized utility work can produce short detours or blocked sections even when the broader Main Street reconstruction is finished.
For a current trip, check the city construction portal’s latest detour information and confirm hours or entrance details directly with the business. Schedules are tentative, so a route that was open during a completion event may change for a utility repair or water-main connection.
Also popular on Amazon
- Versatile Use: PotatoLife plastic mesh fence gives you flexibility in how you can use it, from garden fencing, animal barriers, poultry netting, to construction safety fence, pool fencing and more. Its versatility makes it a practical solution for temporary outdoor fencing.
- Durable and reusable: The fence is made of UV-resistant plastic materials that can withstand harsh outdoor weather. Plus, it's reusable, making it a sustainable and cost-effective choice that helps reduce waste.
- Easy Installation & Disassembly: PotatoLife Fence is designed with ease of use in mind. It can be nailed to a post, fastened to a stake, or wrapped around a tree. When it's time to take it down, simply remove it, roll it up, and store it for future use. Say goodbye to the hassle of complicated fence setups and hello to a time-saving and effortless solution with our mesh fence.
- Customizable: Can be easily cut to desired dimensions with scissors or a utility knife, enabling customization to specific needs. The edges remain smooth after cutting.
- Convenient Combo Set: Our product package consists of a 4' x 100' (1.2m x 30m) mesh fencing roll that weighs 8.73 lbs. You'll also receive 100 zip ties to easily secure the PotatoLife Fence to any object, and 1 pair of gloves to make installation safe and comfortable. Posts are not included. If you encounter any issues with the product, please feel free to contact us. Our team is always available to assist you.
What does Burlington’s experience mean for other construction projects?
The dispute illustrates the difference between project-level success and business-level impact. A corridor can deliver needed infrastructure on schedule while individual merchants lose staffing capacity and revenue during the work. Effective mitigation therefore has to cover the whole customer journey: visible entrances, predictable daytime routes, parking and transit information, timely notices and a named city contact who can resolve problems quickly.
Downtown Burlington’s businesses were not arguing over whether aging utilities should ever be replaced. They were asking whether they could remain viable long enough to see the promised benefits. That tension will remain relevant as the city manages residual utility work and measures whether foot traffic actually returns.
Frequently Asked Questions
What is a tax-increment-financing bond in Burlington’s project?
A tax-increment-financing bond borrows against anticipated future growth in tax revenue from an area. Burlington voters approved $25.9 million for the Great Streets work in 2022; the bond is project financing, not a direct reimbursement for each merchant’s lost sales.
Are all downtown Burlington streets still closed?
No. The main streetscape project was reported complete in summer 2026, but closures can still occur for separate, localized utility work. The October 19, 2026 water-main advisory is an example of why conditions can vary by block and date.
Why can’t night-and-weekend openings make up for daytime construction losses?
Restaurants, retailers and service businesses often depend on lunch traffic, daytime errands and regular commuter patterns. Limited evening or weekend access may help some operators, but it does not recreate the customer mix or staffing economics of a normal weekday.
Where can a Burlington business report an access problem?
The city’s construction program identifies a public-involvement coordinator and business contacts, while the Small Business Support page lists business-development resources. Owners should document blocked entrances, unsafe routes or missed notices and report the specific location and date so the issue can be assigned.

