DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowEarly Black FridayAmazon USEarly Black Friday picks are worth checking nowAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run Scan×
BETTESWORTHConstruction

Costing Steelwork 21 explained: historical UK rates, models and lessons for whole-building cost

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Costing Steelwork 21 is a September 2022 UK market and cost-model update, not a current quotation. Produced by AECOM, the British Constructional Steelwork Association and Steel for Life, it reports Q2 2022 conditions and updates five building models to Q3 2022. Its most useful lesson is methodological: compare the whole building on a like-for-like basis. A steel frame that costs more in the structural package can still produce a lower building cost when lighter foundations, faster erection and shorter preliminaries are included. Conversely, a frame advantage can disappear when roof geometry, services, fit-out, location or fire protection changes. The figures below preserve the report’s historical scope and assumptions so they can be used as a benchmark, not mistaken for a 2026 tender price.

The original Costing Steelwork 21 report was published in September 2022. It combines a market commentary with indicative frame-and-floor rates and five refreshed cost models covering offices, education, distribution, retail and a hotel tower. The models were originally developed for the 2010 Target Zero work and updated through the Costing Steelwork series.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What did Costing Steelwork 21 say about the UK construction market?

The report describes sentiment weakening during the second quarter of 2022 even though workload stayed broadly steady. Contractors and suppliers were dealing with a tight labour and skills market, difficulty recruiting and retaining people, trade-related administration, higher transport and logistics costs, volatile material and energy inputs, and uncertainty about the wider economy.

AECOM reported that construction wages rose 4.5% year on year in Q2 2022, while still increasing more slowly than consumer-price inflation. Its composite building cost index, covering material and labour costs, rose 12.6% in the 12 months to June 2022, with materials driving much of the acceleration in Q2. These are measurements reported at the time; they are not current wage or cost-index readings.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

AECOM’s contemporaneous forecast was for tender prices to rise 6% from Q3 2022 to Q3 2023 and a further 4% from Q3 2023 to Q3 2024. The report said the near-term pricing risk was predominantly upward, while noting that a weaker global economy could reduce some energy and commodity pressure. Those percentages were forecasts made in 2022, not realised outcomes or a present-day forecast. The article’s wording was that “the balance of risks to pricing are clearly still to the upside over the near term,” attributed to the September 2022 AECOM market update rather than to a named speaker.

How should you read the Costing Steelwork 21 frame-cost table?

Use the table as an early comparative benchmark. First select the nearest frame type, then add the chosen floor system and any required fire protection. Finally apply the appropriate BCIS location factor. The ranges reflect changes in major cost drivers; an estimate outside a range is a prompt to check the design, quantities, specification and assumptions rather than evidence that the table is wrong.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Issue 21 indicative rates, £/m² of gross internal floor area (GIFA), base location factor 100; historical figures checked Nov 2026
Component Indicative range (£/m² GIFA) Basis or note
Steel frame to low-rise building 147–178 Steelwork design based on 55 kg/m²
Steel frame to high-rise building 247–279 Steelwork design based on 90 kg/m²
Complex steel frame 279–330 Steelwork design based on 110 kg/m²
Composite metal-deck floor with lightweight concrete topping 85–132 Two-way spanning deck, typical 3 m span, topping up to 150 mm
Precast concrete composite floor with concrete topping 123–173 Hollowcore planks with structural topping spanning between primary steel beams
Fire protection, 60 minutes 21–31 Factory-applied intumescent coating to columns and beams
Fire protection, 90 minutes 26–42 Factory-applied intumescent coating to columns and beams
Large-span single-storey portal frame, low eaves (6–8 m) 107–140 Steelwork design based on 35 kg/m²
Large-span single-storey portal frame, high eaves (10–13 m) 130–167 Steelwork design based on 45 kg/m²

“£/m²” here means pounds per square metre of GIFA, not a price per tonne of steel or per square metre of site area. The structural-weight assumptions are crucial: changing spans, grids, loads, storey height, openings or robustness requirements can move a project from one range to another.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

What is the worked £297/m² example?

For a typical low-rise frame, the report takes the midpoint of the relevant frame, floor and fire-protection ranges:

  • Low-rise steel frame midpoint: £162.50/m²
  • Composite metal-deck floor midpoint: £108.50/m²
  • 60-minute intumescent protection midpoint: £26.00/m²

The sum is £297/m² before a location adjustment. It is a worked illustration of the issue’s method and 2022 rates, not a quotation for a particular building. It also does not remove the need to define connections, temporary works, edge conditions, detailing, tolerances, finishes and interfaces in a project estimate.

How do I adjust a steel frame cost for location?

Multiply the base rate by the BCIS location factor divided by 100. Issue 21 uses a base factor of 100 and gives, for Q3 2022, Central London at 125, Manchester at 103 and Glasgow at 92.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
Illustration using the report’s £297/m² worked example; historical factors checked Nov 2026
Location Factor Illustrative adjusted rate Calculation
Central London 125 £371.25/m² £297 × 1.25
Manchester 103 £305.91/m² £297 × 1.03
Glasgow 92 £273.24/m² £297 × 0.92

These calculations change only the location factor; they do not update the 2022 material, labour, design or programme assumptions. A current estimate needs the current BCIS factor and current market rates, with the project location and base index stated explicitly. Treating a regional adjustment as a substitute for a new estimate can produce false precision.

Does a steel frame make the whole building cheaper?

Not automatically. The five models show why the frame-and-floor line must be tested against substructure, roof, preliminaries, services, fit-out, programme and building-specific constraints. The selected results below are total building figures from the Q3 2022 models, not universal rankings of materials.

Costing Steelwork 21 case-study totals, £/m²; Q3 2022 model figures checked Nov 2026
Building model Options compared Selected total-building results and explanation
City of London office, One Kingdom Street Cellular steel composite beams with lightweight concrete slab on metal deck; post-tensioned concrete flat slab Steel composite frame and upper floors: £533; concrete: £505. Total building: steel £3,351 versus concrete £3,416. The lighter structure reduced foundations and the faster programme reduced related costs.
Merseyside secondary school, Christ the King Centre for Learning Steel with precast hollowcore; in-situ concrete flat slab; steel composite with metal deck Total building: £3,741, £3,705 and £3,679 respectively. The composite option’s lower substructure, roof and shorter-programme preliminaries outweighed its higher frame-and-floor cost than the concrete flat slab.
Stoke-on-Trent distribution warehouse Steel portal frame; hybrid concrete columns with glulam beams/timber rafters; steel portal frame with northlights Total building: £847, £908 and £888 respectively. Efficient steel spans helped the plain portal frame; the hybrid involved multiple suppliers, while northlights required extra roof framing and glazing.
Asda food store, Stockton-on-Tees Steel portal frame; glulam columns and rafters; steel portal frame with northlight roof Total building: £3,064, £3,104 and £3,077 respectively. Services and fit-out formed a large share of the total, so changing the frame had a smaller proportional effect.
Holiday Inn tower, MediaCityUK, Manchester Steel frame with Slimdek floors; concrete flat slab; composite deck on cellular beams in offices and universal-column beams in hotel Total building: £3,409, £3,218 and £3,154 respectively. The composite deck/cellular-beam arrangement was lowest in this model. The Slimdek arrangement reflected a late accommodation change and time constraints, so it is unusual for this building type.

What can these five models teach a cost planner?

  1. Compare the same scope. Confirm whether each option includes the same floors, cores, stairs, roof, fire strategy, finishes, services, preliminaries, overheads, profit and contingency. The report’s cost plans include those allowances where specified, but a comparison is only meaningful when the scope is aligned.
  2. Separate package cost from total cost. A cheaper frame can require heavier foundations, more complex temporary works or a slower erection sequence. A dearer structural package can lower substructure and preliminaries enough to reduce the building total.
  3. Model the programme. Erection speed affects labour, site overheads, finance exposure and handover. The school example specifically attributes part of the composite option’s advantage to a shorter programme; that is a model result, not a guaranteed steel benefit.
  4. Check roof and daylight requirements. Northlights add framing and glazing. Warehouse and retail models show that roof geometry can reverse the apparent advantage of a plain portal frame.
  5. Identify dominant non-structural costs. In the food-store model, services and fit-out diluted the effect of frame selection. On a project with a high services or fit-out content, small structural differences may matter less than coordination and procurement risk.
  6. Document exceptional constraints. The hotel model’s Slimdek solution followed a late change and time pressure. Recording such circumstances prevents a one-off arrangement being reused as a generic benchmark.

What should be included when preparing a project estimate from the table?

Start with the building brief and a stated measurement basis. Record GIFA, storey count, grid, spans, imposed and environmental loads, floor depth, roof form, openings, robustness requirements, fire resistance, connection assumptions and erection constraints. Select the closest frame and floor categories only after those decisions are visible.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

Then build the estimate in layers:

  1. Structural frame: apply the relevant low-rise, high-rise, complex or portal-frame range and state the assumed steel weight per square metre.
  2. Floor system: add composite metal deck, precast hollowcore or another system on a like-for-like performance basis. Check span, topping thickness, vibration, acoustic and fire requirements.
  3. Fire protection: add the required duration and system. Issue 21’s £21–31/m² and £26–42/m² allowances are for factory-applied intumescent coating to columns and beams, so a different protection strategy needs a different allowance.
  4. Substructure and roof: quantify the effect of structural weight, column reactions, foundations, roof framing, rooflights or northlights and drainage interfaces.
  5. Programme and preliminaries: test erection sequence, site access, craneage, temporary stability, logistics and likely duration. A shorter structural programme can change preliminaries, but only a project schedule can establish the saving.
  6. Location and date: apply the appropriate BCIS factor and identify the price base. Do not present a Q3 2022 rate as a 2026 market price.
  7. Risk and sensitivity: show how the total changes if steel weight, span, fire rating, programme or location moves toward the top of its range.

A result outside an issue 21 range should trigger an assumption review. Possible explanations include an unusually heavy frame, transfer structures, irregular geometry, difficult access, unusually high fire requirements or a mismatch between GIFA and the measured scope. It should not be “corrected” simply by forcing the number back inside the published range.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How current is Costing Steelwork 21?

It is a historical snapshot. The source article covers Q2 2022 market conditions and Q3 2022 cost plans. The SteelConstruction.info archive lists later Costing Steelwork updates, including issue 36 in July 2026. For a live budget, use the latest relevant issue, current indices, project quotations and a defined procurement date; retain issue 21 for understanding the comparison method and the historical models.

The original Building feature, “Costing Steelwork 21: Market update”, and the comparative-costs guidance on SteelConstruction.info provide useful context. AECOM states that the article’s rates are for comparative purposes and should not be relied on for another purpose without further discussion with AECOM. That limitation matters: an early-stage benchmark is not a contractor’s offer, a bill of quantities or a final account forecast.

What is the practical takeaway for clients and design teams?

Use Costing Steelwork 21 to ask better questions, not to select a material by headline rate. Define the same building, at the same date and location, with the same performance requirements; compare frame and floor cost alongside foundations, roof, programme, preliminaries, services and fit-out; and show the assumptions behind every adjustment. Steel is advantageous in some of the issue 21 models, while concrete or another hybrid is competitive in others. The deciding factor is the whole-building outcome under the project’s actual constraints.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

Frequently Asked Questions

Is Costing Steelwork 21 still a valid 2026 price guide?

No. It is a September 2022 publication with Q3 2022 rates and forecasts made at that time. It remains useful as a historical benchmark and comparison method, but a 2026 budget needs current indices, location data and project-specific quotations.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What does GIFA mean in the Costing Steelwork tables?

GIFA is gross internal floor area: the building’s measured internal floor area used as the denominator for the indicative rates. It is different from site area, net lettable area and the weight of steel purchased, so changing the measurement basis can make two apparently similar £/m² figures incomparable.

Why is fire protection shown as a separate allowance?

The report separates 60- and 90-minute factory-applied intumescent coating from the frame and floor components so the required resistance can be added to the chosen system. If a project uses board protection, concrete encasement or a different tested build-up, its cost and detailing should be assessed separately rather than substituted directly.

What should I do if my estimate falls outside an issue 21 range?

Audit the assumptions first: structural weight, spans, transfers, geometry, fire rating, access, erection sequence, location factor and measured area. An out-of-range result may be reasonable for an unusual building, but it should be explained and supported by current project information rather than hidden by selecting a wider published category.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 13, 2026 8:21 am GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.