DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowThanksgiving DealsAmazon USThanksgiving week: Black Friday picks start earlyAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan Now×
BETTESWORTHConstruction

Construction of a new residential quarter begins in Minsk between Hlaholieva, Hurskaha and Ponomarenka streets

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Construction has begun on a planned residential quarter in Minsk between Hlaholieva, Hurskaha and Ponomarenka streets. The reported plan covers five apartment buildings with more than 40,000 square metres of residential floor area. Two nine- to ten-storey buildings make up the first stage; excavations were ready and soil was being compacted for strip foundations when the report was published on 27 October 2026. Three more residential buildings and several utility facilities are scheduled for later stages. The site was formerly industrial, while existing private houses on the edge of the project area are designated for removal but had not been demolished at the time of reporting.

Where is the new Minsk residential quarter being built?

The quarter is planned inside Minsk on land bounded by Hlaholieva, Hurskaha and Ponomarenka streets. The site was previously an industrial zone. City authorities approved the development plan in 2021, and industrial buildings were demolished in 2025 as the area was cleared for redevelopment.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The report says project implementation began in February 2025. By 27 October 2026, activity had moved from site clearance to foundations for the first residential buildings.

How many buildings and homes are planned?

The reported scheme contains five residential buildings with a combined planned area of more than 40,000 square metres. The source does not state the number of apartments, their layouts, the tenure mix or the eventual height of the three buildings in the later stage.

Popular on Amazon
SnapHouse Architectural Scale Model Building Kit, Ages 13+ | Modular 452 Piece Architectural Scale Model Building System, For Adults, Kids, Educators and Home Design Hobbyists
  • Custom Architectural Scale Models: Design and build custom Architectural Scale Models of your own unique house designs at 1:48 scale
  • Easy to Use: No special skills or additional materials are required
  • Reusable Parts: All parts are reusable so you can design, build, dismantle, and rebuild as often as you like
  • Versatile Design System: Each unique shape in the SnapHouse system can be used for multiple purposes and orientations
  • Flexible Architectural Styles: Create your own architectural style from traditional to ultra-modern and everything in between
Stage Residential buildings Height or area reported Construction status
First stage Two Nine to ten storeys each Excavations prepared; soil compaction for strip foundations under way on 27 October 2026
Later stage Three Not stated Planned after the first stage and utility works
Overall project Five More than 40,000 square metres in total Reported plan, not a guaranteed final delivery

What is included in the first and later stages?

The first stage is limited to two apartment buildings. Once those structures are advanced, the plan calls for essential network infrastructure before the remaining residential blocks are built.

First stage: two apartment buildings

Both initial buildings are designed at nine to ten storeys. The published progress description places them at the groundworks stage: excavations had been completed and builders were compacting soil for strip foundations. No completion date or handover schedule was provided.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Utility infrastructure after the first buildings

The next planned works include a distribution transformer substation, a sewage pumping station and a booster pumping station. These facilities are intended to support power, wastewater and water-pressure requirements for the quarter, but the report does not give capacities, technical specifications or commissioning dates.

Also popular on Amazon
Sale
Architecture Kit for Kids - Architect Home Model Kit - Girls & Boys Gifts | 8 9 10 11 12 Year Old Girl Gifts - Boys Toys Age 8-10 - STEM Toys for Ages 8-13 - 12 Year Old Boy Birthday Gift for Girls
  • REAL ARCHITECT STUDIO: Spark a passion for architectural design with a professional studio for kids. The kit combines authentic drafting tools with a unique magnetic building system. Kids sketch detailed floor plans and instantly turn them into 3D models using the included acrylic walls — the perfect blend of art and building.
  • WATCH DRAWINGS POP INTO 3D INSTANTLY: Transform a flat sketch into a standing model in minutes. With the magnetic grid base and acrylic walls, kids can physically "snap" their floor plans into place. It’s a thrilling way to visualize space, test room layouts, and see their ideas stand tall immediately.
  • ALL INCLUSIVE KIT: Everything a future architect needs in one box: magnetic grid floor-base, 30 magnetic acrylic walls (in 4 sizes), tracing paper, design patterns, blueprint-elements tracing sheets, reusable door & window wall-cling stickers, T-ruler and triangle, compass, dry-erase marker, drafting pencil with eraser, colored pencils, Architecture Adventure Book, and Step-by-step Design Learning Guide — Includes all required to plan, design, and build from the first layout to the final structure.
  • ARCHITECTURE ADVENTURE BOOK & GUIDE: Much more than a manual — it’s a design journey! The included Architecture Adventure book teaches kids to "think like an architect" by revealing cool secrets, fun facts, and real lingo in a way that is easy to understand. Additionally, it includes a clear, illustrated instruction guide, so young builders can jump straight into creating their dream home.
  • PLAN, DRAFT, BUILD: Learn the real-world architectural workflow in four fun steps. Plan the layout on the grid, draft crisp lines with the tools, decorate with textures, and build the structure vertically. It is a rewarding project that teaches logic, patience, and creative confidence.

Second residential stage

Three additional residential buildings are planned after the first two and the listed utility works. Their storeys, floor areas, construction timetable and apartment count have not been published in the report.

What happened to the existing industrial buildings and private houses?

The industrial part of the site has already been cleared: the report says industrial buildings were demolished in 2025. Existing private houses are a separate issue. They were still standing when the 27 October 2026 account was published, but the approved plans designate them for demolition to make way for the quarter.

That designation describes the intended land-use outcome, not proof that every house had been acquired, vacated or scheduled for a particular demolition date. The report gives no information about individual property notices, compensation, relocation arrangements or the legal timetable for removals.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
DIY Paintable Model House Kit,3D Wooden Puzzles for Adults | 97Pcs Wooden Houses for Crafts,Beginner Friendly Building Kit,Family Art Project,Christmas Holiday Gift for Teens & Adults
  • Build & Paint Freely for Unlimited Creative Fun This blank wooden villa dollhouse arrives unfinished and unpainted, so you can fully customize its design! Style it as a cozy Christmas winter retreat, a warm fall Thanksgiving cottage, a bright summer home, or your very own colorful dream house. Markers, paint, and LED lights are NOT included — all creative freedom stays in your hands.
  • Beginner-Friendly 3D Wooden Puzzle: Relaxing Screen-Free Craft Fun The kit comes with 97 precision laser-cut wooden pieces. Thanks to clean interlocking slots, assembly takes just 1–2 hours and requires no complicated tools. It’s a wonderful offline hobby to step away from phones and screens, perfect for stress relief and slow crafting enjoyment.
  • A Heartwarming Family Bonding Activity for All Ages Suitable for kids, teens, adults, seniors and couples. Build and paint alongside family, your partner or friends! It makes a lovely interactive activity for weekend get-togethers, game nights, and holiday family time to create sweet shared memories.
  • Versatile Home Decor & Thoughtful Holiday Gift This pastoral-style miniature villa looks beautiful displayed on bookshelves, mantels and in living rooms. It’s an ideal gift for Christmas, Thanksgiving, birthdays and anniversaries. Delight your loved ones with this thoughtful, hands-on craft present!Finished villa dimensions: 7.7 × 7.7 × 6.7 in.
  • Premium Safe Natural Wood with Exquisite Villa Details Crafted from smooth natural plywood with precise laser cutting and zero sharp burrs. The realistic villa design includes balconies, a tiled roof, a garage, a front porch and multi-story windows. Carefully finished details bring your tiny miniature dollhouse scene to life.

What is the project timeline?

Date Reported milestone
2021 Minsk authorities approved the development plan.
February 2025 Implementation began after preparation of the former industrial area.
2025 Industrial buildings on the site were demolished.
27 October 2026 Excavations for the first two blocks were ready, with soil compaction for strip foundations under way.
Later phase A transformer substation, sewage pumping station, booster pumping station and three more residential buildings are planned.

What is not yet known about the Minsk development?

The published account establishes the location, broad scale, phasing and reported construction activity, but it does not identify a developer or general contractor. It also gives no apartment prices, sales or rental launch, financing terms, completion date, parking provision, school or commercial facilities, or detailed transport and landscaping plan.

Those omissions matter because a planning approval and early foundation work do not establish when units will be marketed or occupied. Building numbers, floor area and sequencing should therefore be treated as the current reported plan; they can change as design approvals, utility coordination and property-clearance decisions progress.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What should nearby residents watch next?

  • Publication of notices or schedules concerning the private houses marked for removal.
  • Progress on the first buildings from foundations to structural framing.
  • Detailed designs for the transformer, sewage and booster pumping stations.
  • Any official announcement naming the developer, contractor, apartment program or completion target.
  • Revisions to the approved layout that could alter building heights, access routes or the total floor area.

Until those details are issued, the clearest confirmed picture is a five-building quarter replacing a former industrial zone, with two blocks now in early foundation work and three more reserved for a subsequent stage.

Also popular on Amazon
Rustark 10Pcs Model Tools Set Modeler Building Kit for Basic Model Assembling, Building and Repairing
  • ✔ APPLICATION: The modeler basic tools set is suitable for a beginner and advanced modeler as well. You can use it to manufacture toys, cars, robots, cartoon, and other crafts.
  • ✔ FULL RANGE & COST EFFICIENT: Package include : 1 x side pliers, 1 x manual model tools file, 1 x pen knife and blade, 1 x yellow model separator, 1 x polishing cloth, 2 x double-sided polished bar, 2 x tweezers. And the items are protected by a plastic box in case of damage. Meet all beginner’s basic requirements.
  • ✔ DURABLE: Trimmer pen is tightly clamped and has high hardness. With safety protection cap to protect blade. The cutting pliers is made of carbon steels, good durability. The tweezers are made of high strength stainless steel, anti-static, anti-acid, anti-corrosion and anti-magnetic. Other items also have good quality.
  • ✔ LIGHTWEIGHT & PORTABLE: Model tools are lightweight and portable. When you use them, you will feel more handy. Packaged in a plastic box, easy to carry and store, you can carve your products anytime and anywhere. Looking forward to your masterpiece!
  • ✔ GREAT GIFTS: If you have an friend like animation, cartoon, and model very much, or she or he is a beginners of model, you can present this modeler tools set as a gift to your friends directly, or use the model tools to create a gift for your cherished friend. After accepting your unique surprise, your friend must have tears in his eyes. Your unique gift stands for your unique love!

Frequently Asked Questions

Can apartments in the new quarter be bought or reserved now?

No sales or rental launch is identified in the published report. Without a named developer or official sales channel, claims about reservations, prices or payment plans cannot be verified from the information currently available.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

When will the first buildings be finished?

No completion or handover date was reported. Foundation preparation in October 2026 indicates an early construction phase, but it cannot be converted into a reliable occupancy year without a published schedule.

Will every existing private house be demolished immediately?

The plans designate the houses for removal, yet the report records that they had not been demolished by 27 October 2026. Individual timing, notices and compensation arrangements are not specified, so the effect on a particular property requires separate official confirmation.

Who is developing the Minsk quarter?

The account does not name a developer, contractor or project company. That information would normally be needed to verify construction milestones, apartment sales and responsibility for utility works.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 23, 2026 9:32 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.