A construction company’s financial health is best judged by its liquidity, work-in-progress (WIP) reporting, debt, profit trend, backlog, bonding capacity and payment record—not by annual revenue alone. Before hiring, request documents in proportion to the money and schedule at risk, compare at least three years of trends, and corroborate the company’s numbers with its surety, bank, suppliers, public records and references. Commercial owners and general contractors can often make this package a condition of award; a homeowner usually has fewer rights to demand tax returns or audited statements, so the process relies more on practical proxies.
This guide explains what to request, how to read it, which ratio benchmarks conflict, and when a warning deserves a question rather than an automatic rejection. The figures are U.S.-focused practitioner conventions, not legal or universal underwriting rules; licensing, lien, tax and bonding requirements vary by state and by project type.
As an Amazon Associate I earn from qualifying purchases.
Quick wins for a faster PC:
Scan for outdated or missing drivers - takes under a minuteDriver Scan →Repair Windows errors before they cause bigger problemsFix Now →Why check a contractor’s finances before signing?
A financially weak contractor can run out of cash before your project produces enough billings. The consequences include unpaid subcontractors and suppliers, work stoppage, mechanics’ liens, disputes and the cost of hiring a replacement. USA Construction Consultants says lenders commonly require a general contractor’s tax returns, profit-and-loss statement and balance sheet during construction-loan approval because avoiding a weak contractor is easier than rescuing a half-built project.
Construction is unusually dependent on working capital. As Claire Wilson, Head of Construction Solutions at Siteline, writes for the Construction Financial Management Association (CFMA), “In commercial construction, every job starts in a negative cash position, as expenses are incurred before any revenue is generated.” Payroll, materials, equipment, subcontractor invoices and overhead arrive before the owner’s payment. A company can therefore report substantial revenue while lacking the cash or borrowing room to finish another job.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
Financial review is also a protection for the rest of the project team. CFMA’s subcontractor-prequalification guidance says financial information can show whether a subcontractor can weather a downturn, continue performance and pay downstream parties, reducing the risk of bond or lien claims. The same logic applies when a developer hires a general contractor.
Do not treat one ratio as a verdict. Matthew Nash, CPA, of Meyers Brothers Kalicka, puts it plainly: “No single ratio will provide an overall picture for the health of a construction company.” Look for consistent evidence across statements, WIP, bonding, payment behavior and explanations from management.
What documents should you request?
Scale the request to the contract value, the project’s complexity and the damage a failure would cause. A small repair does not justify the same package as a hospital, public bridge or custom home.
| Contract value | Practical minimum package | What it helps you test |
|---|---|---|
| Under $50,000 | Business-credit report (such as a PAYDEX-style report) and current insurance verification | Payment history, legal entity and basic ability to operate |
| $50,000–$250,000 | Add trade references and a bank letter | Whether suppliers are being paid and whether a credit line exists |
| $250,000–$500,000 | Add a WIP report and financial-ratio review | Whether reported profit and backlog are realistic |
| Over $500,000 | Add CPA-reviewed financial statements and a surety bonding-capacity letter | Independent assurance, adjusted capital and room for this job |
Prices checked November 2026.
This ladder comes from Construction Cost Accounting’s 2026 guidance; it is an operating policy, not a law. For a serious award, request three fiscal years of balance sheets and income statements, the latest interim statements, a detailed WIP schedule, accounts-receivable (A/R) and accounts-payable (A/P) agings, backlog and job-level profitability. For contracts above $500,000, ask whether the statements are compiled, reviewed or audited and whether the company’s surety has accepted that level of assurance.
Most sureties expect year-end statements within 90 to 120 days of the fiscal year-end. Grit Insurance Group and CostaRothbort CPAs both identify this timing as typical. A late package is not proof of insolvency, but repeated lateness is a management signal worth explaining.
How much CPA assurance is enough?
Assurance describes what the CPA did—and did not do—to the numbers. It is not the same as a guarantee that the contractor will finish.
| Statement level | What the CPA generally does | Typical bonding context in the sources | Questions to ask |
|---|---|---|---|
| Compiled | Formats management’s figures; does not verify them | Small programs, often up to roughly $500,000–$1 million of single-job capacity in Grit’s broker guidance | Are the WIP and A/R agings complete? What supports unusual balances? |
| Reviewed | Performs analytical procedures and inquiries, but not an audit’s testing | Mid-size programs, generally about $1 million–$5 million of single-job capacity in Grit’s guide | What changed from last year, and how were estimates and receivables corroborated? |
| Audited | Tests and verifies evidence under audit procedures | Large programs and the highest capacity in Grit’s description | Read the auditor’s report and any material weakness or going-concern language |
James Moore & Co. says most sureties require reviewed or audited statements and that compiled statements often fall short for larger programs. Michael J. Costa, CPA, CCIFP, CCA, likewise says the required level rises with the bond program and that the surety agent can state the exact requirement. A reviewed statement on a $40,000 project may be proportionate; a compilation with no usable WIP on a multimillion-dollar job is not.
What should you look for on the balance sheet?
Start with dollar working capital, then test whether the current assets are actually collectible. Working capital equals current assets minus current liabilities. For a contractor, current assets can include cash, receivables, materials, WIP and retainage receivable; current liabilities can include payables, accrued costs, short-term debt, billings in excess of costs and contract-retainage payable.
Current ratio
Current ratio = current assets ÷ current liabilities. The sources publish different floors:
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
- Matthew Nash’s 2024 guidance says above 1.0; a ratio below 1 means short-term assets may not cover imminent debts.
- Grit uses 1.2 or higher as a favorable level and below 1.0 as a red flag.
- James Moore & Co. says sureties often want at least 1.25 to 1.
- Construction Cost Accounting calls 1.25 or higher healthy and below 1.0 a red flag in its 2026 table.
These are not contradictory laws. They are different underwriting conventions. A ratio of 1.08 may pass a small, short job but provide little cushion for delayed payment. A ratio of 1.30 may still be weak if most “current assets” are old receivables or related-party balances.
Free tools Windows power users keep installed
One-click scans. No signup required.
Quick ratio
Quick ratio, or acid-test ratio, excludes inventory: (current assets − inventory) ÷ current liabilities. CFMA describes the numerator in practical terms as cash, cash equivalents and receivables. CFMA’s cited ideal range is roughly 1.1 to 1.5; CCA calls at least 1.0 healthy and below 0.8 a red flag. Ask what portion of receivables is more than 90 days old before accepting the headline number.
Adjusted liquidity and the bank line
Surety underwriters may discount receivables older than 90 days, amounts due from owners or related companies, prepaid expenses, questionable inventory and shareholder loans. CostaRothbort and Grit both emphasize these adjustments. A polished current ratio supported by stale invoices or unexplained related-party IOUs is much weaker than cash and collectible trade receivables.
Request a banker letter confirming the credit line, account history and good standing. A $500,000 line with only $50,000 available is 90% drawn, according to CCA’s example. Frequent bank switching or covenant breaches deserve an explanation; an available, lightly drawn line is a strengthener, not a substitute for working capital.
What is a good debt-to-equity ratio for a construction company?
Debt-to-equity (total liabilities ÷ equity, or net worth) measures how much creditor funding sits ahead of the owners’ cushion. The published thresholds conflict, so use them as comparison axes rather than a single pass/fail rule.
The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →| Source | Published interpretation | How to use it |
|---|---|---|
| Matthew Nash, 2024 | Above 2.0 can indicate excessive debt | Investigate leverage and interest coverage |
| CFMA’s Claire Wilson | Above 2.0 is generally considered bad for construction companies | Consider whether debt could jeopardize bonding or credit |
| Grit Insurance Group | Below 2.0 generally favorable; above 3.0 heavy leverage | Bonding perspective, not a universal industry rule |
| Construction Cost Accounting, 2026 | 1.5–3.0 healthy; above 4.0 a red flag | An internal subcontractor-screening convention that is more permissive |
A ratio between 2 and 3 should be explained, not automatically passed or failed. Ask for interest coverage (EBIT ÷ interest expense), maturity dates, collateral and covenant status. Net worth should generally grow through retained earnings, not asset revaluations. Declining or negative equity over several years, or large owner distributions that drain retained earnings and working capital, removes the cushion you are trying to verify.
How profitable should a construction company be?
Construction margins are thin, and the trend matters more than one impressive year. CFMA cites an average gross margin of about 26% from CSIMarket data covering Q1 2023 through Q1 2024, while the same article gives a general gross-margin rule of thumb of 5% low, 10% healthy and 20% high. Those are different claims: label the 26% figure as the cited period average and the 5/10/20 figures as a rule of thumb.
For net profit, CFMA cites an IBISWorld range of 3%–7% and a CSIMarket figure just over 8%. Construction Cost Accounting’s 2026 table calls 3%–6% healthy and below 2% a red flag. USA Construction Consultants uses roughly 5% net margin as a cushion and around 1% or less as a warning. The practical conclusion is that a contractor earning 3%–7% has little room for a major overrun, delay or collection failure.
CFMA’s article describes a 10%–15% healthy operating-profit range and a market average just over 15% from CSIMarket; it says operating margin below 5% can point to cost trouble, intense competition or a slowing market. Use the company’s own definition of operating income and compare it consistently across years.
Crashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minutePC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
Look for margin fade. CCA illustrates an early warning in which gross margin falls from 22% to 16% while revenue rises; it says that pattern can precede net losses by 12–18 months. The example is a practitioner illustration, not a published study. Two consecutive loss years are a serious surety warning, according to Grit. One bad year can have a documented cause; repeated losses or violent swings suggest estimating and cost-control problems.
Why is the WIP schedule often more important than the income statement?
“The WIP schedule is often the most scrutinized page in the report,” writes Michael J. Costa. It should show, for each open job, contract value, estimated total cost, costs incurred, billings to date, estimated gross profit, percentage complete and cost to complete. It reveals whether recognized profit and backlog are credible.
Underbilling and overbilling
Underbilling (costs and earned revenue in excess of billings) can reflect billing delays, overruns or optimistic estimates. Frequent underbilling may also signal cash-flow trouble or weak project controls. Overbilling is the reverse: billings exceed revenue recognized for the work performed. Some overbilling is normal, but chronic overbilling means the contractor is using one owner’s cash to fund other work. CFMA’s example is a project 30% complete but 40% billed; CCA describes $400,000 of net overbillings as revenue spent before it has been earned.
Profit fade and concentration
Compare the original estimated gross profit with the current estimate. Profit fade means the expected margin shrinks as the job advances, exposing unreliable estimates. Then check concentration: one unusually large job can dominate results, and a problem there can overwhelm the company.
Ask for a completed-contract schedule comparing estimated profit with actual profit. It is the estimator’s track record. A WIP report that omits cost to complete, billings to date or gross-profit adjustments cannot support a meaningful backlog assessment.
How should you evaluate backlog and growth?
Backlog is awarded work not yet finished, not cash in the bank. Two contractors can each report $5 million of annual revenue while one has $1 million of backlog and the other $15 million; the second may lack the working capital, staff, equipment and supervision to perform it. Ask how much backlog is bonded, how much is unbonded, when costs will peak and whether the firm has completed comparable projects.
CFMA defines average months in backlog as backlog value divided by monthly revenue. There is no universal “correct” number in the supplied sources: a thin backlog threatens continuity, while an unmanageable backlog threatens execution. Compare backlog and remaining cost with working capital, available bank capacity, current staffing, equipment and demonstrated project size.
Nash’s stretch warnings express the same risk. Working-capital turnover (sales ÷ working capital) above 30 may mean the company needs more capital to keep growing. Equity turnover (revenue ÷ equity) above 15 may signal that growth is outrunning the balance sheet. These are warnings about scale, not trophies for efficiency.
What does a bonding-capacity letter tell you?
A bonding-capacity letter is an outside underwriting signal from the contractor’s surety. It should state the single-project limit and aggregate limit, identify the surety and agent, and be current for the proposed contract. It does not guarantee performance, but it tests capital, capacity and character through another party’s diligence.
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
Single-job capacity reflects experience with work of that size. A firm whose completed jobs top out at $500,000 asking for a $5 million performance bond has an experience problem even if its balance sheet is tidy. Aggregate capacity counts uncompleted work, including unbonded backlog. A $5 million aggregate limit with $4.5 million already committed cannot simply absorb an additional $800,000 job without surety approval. A $1.8 million contract against a $2 million single-job limit consumes 90% of that limit.
Traditional surety review is commonly organized around character, capacity and capital: honesty and how past problems were handled; people, equipment, systems, workload and similar experience; and the money to absorb a bad job. Ask the agent whether the proposed contract fits both limits after existing commitments and whether the letter is conditional on updated statements.
For public work, the Surety & Fidelity Association of America (SFAA) says an unbonded public project is “perhaps” 10 times more likely to default, and that defaults cost 85% more to complete and take nearly twice as long. The qualifier matters, and those figures concern public construction—not a promise that a bonded residential remodeler cannot fail. Bond types have distinct purposes: a bid bond supports the bid and final-bond commitment; a performance bond guarantees contract completion; a payment bond protects subcontractors and suppliers if the contractor cannot pay.
Which outside checks corroborate the financial statements?
Use independent checks to challenge, not merely repeat, the contractor’s own package.
- Business-credit report: CCA’s 2026 guide says PAYDEX runs from 1 to 100, treats above 80 as payment within terms and below 50 as chronic slow payment, and uses a failure-risk score to estimate failure within 12 months. Those cutoffs and its estimated $50–$150 report cost are CCA’s practitioner guidance, not figures verified on the credit bureau’s own page.
- Trade references: Request five references, then call at least one supplier not supplied by the contractor. Ask average days to pay, whether payment slowed in the last 12 months and whether the account is current. Suppliers may see 90-day slowness before a financial statement does.
- Tax liens and lawsuits: Search court records, payment disputes, breach claims, tax liens and terminated contracts. Tax authorities can have priority over other creditors, including the hirer.
- UCC filings: Heavy liens on receivables can mean the contractor is borrowing against money it has not collected.
- License, entity and insurance: Verify the required state or local license, good standing, general liability and workers’ compensation certificates. Confirm that the named legal entity matches the contract.
- Safety and experience: On public and large private work, owners commonly review EMR, OSHA history, OSHA 300A summaries, comparable completed projects, references, equipment and key personnel. ConstructionBids.ai identifies the AIA A305 Contractor’s Qualification Statement as a common starting form.
How do accounting methods change the picture?
Ask which accounting method produced the statements before comparing years. Percentage-of-completion accounting recognizes revenue and cost as work is performed and is generally preferred by sureties. Cash-basis or completed-contract reporting can move a large profit from one year to another—for example, a December completion collected in January.
Tax returns and internal financial statements may legitimately differ when a contractor uses completed-contract treatment for tax and another method for management reporting. Compare the two and ask about large unexplained gaps. Delinquent filings or unpaid taxes are a serious concern because tax liens can attach to assets.
Aggressive but legal tax minimization—accelerated depreciation, large deductions or owner distributions—can reduce reported income, equity and bonding capacity. Low taxable income is not automatically evidence of failure, and a cash-basis profit is not proof of abundant cash. Have the contractor’s CPA explain the reconciliation.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
What are the most important warning signs?
Pause and seek written explanations when you see:
- Current ratio below 1.0 or a quick ratio below the applicable convention;
- two consecutive loss years;
- equity shrinking or turning negative;
- chronic overbilling, unexplained underbilling or repeated profit fade;
- a large share of receivables more than 90 days old;
- tax liens, serious payment disputes or supplier accounts that are not current;
- a bonding letter with no remaining single-job or aggregate room;
- backlog far beyond the firm’s demonstrated project size or available staff; and
- refusal to provide ordinary documents, defensiveness or inability to explain the company’s own numbers.
Some conditions call for questions rather than rejection: one low-margin year with a credible cause, debt-to-equity between 2 and 3, a compilation on a genuinely small project, or low taxable income caused by timing and depreciation. Document the answer and put protections—retainage, payment controls, progress verification, joint checks where lawful, or bonding—into the contract with legal advice.
What can a homeowner realistically do?
A homeowner generally cannot assume a right to a contractor’s tax returns, audited statements or surety file. The detailed financial ladder is designed for commercial owners, lenders, public agencies and general contractors that can make disclosure a condition of award.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
Use practical proxies instead: verify license and insurance; call a supplier reference; search liens, lawsuits and tax records; obtain several recent project references; require a written price, schedule, change-order process and payment schedule; and ask whether the contractor can obtain a performance or payment bond for a large custom build. On a lender-financed project, ask the lender or owner’s representative whether it already collects financial statements and whether a construction CPA can review them.
Evasiveness remains informative. A remodeler may reasonably decline to hand over tax returns, but should still be able to provide current insurance, licensing, references, a clear contract and a coherent explanation of how the project will be staffed and funded.
Recommended Free Tools
How should you make the final hiring decision?
Build a short scorecard rather than relying on a single “good ratio.” Compare each candidate on six axes:
- Assurance: compilation, review or audit; presence and quality of WIP and aging schedules.
- Liquidity: dollar working capital, current and quick ratios, adjusted for stale or related-party assets, plus undrawn bank capacity.
- Leverage: debt-to-equity, interest coverage, debt maturities and equity trend.
- Profit: gross, operating and net margins over three years, job-level fade and completed-job accuracy.
- Workload: backlog, remaining cost, staffing, equipment, comparable completed jobs and bonding room.
- Corroboration: surety letter, credit report, supplier calls, court and lien searches, license and insurance records.
Require a written explanation for every material exception and decide whether the contract can control the risk. A contractor with moderate ratios but transparent records, realistic WIP and ample bonding room may be safer than a fast-growing firm with attractive revenue and opaque estimates. Conversely, no amount of polished paperwork compensates for a company that cannot explain where the cash, equity or project capacity has gone.
Frequently Asked Questions
How recent should a contractor’s financial statements be?
Ask for the latest year-end statements plus interim numbers when the year is more than a few months old. Sureties commonly expect year-end statements within 90 to 120 days of the fiscal year-end; older statements should be supplemented with current WIP, aging and bank information.
Can a contractor have a healthy current ratio and still fail?
Yes. Current assets may be dominated by receivables that will not be collected, related-party balances or prepaid costs. Check the quick ratio, aged receivables, available bank line, WIP profit fade and upcoming payroll and subcontractor obligations.
What is the difference between a performance bond and a payment bond?
A performance bond addresses completion of the contractor’s promised work. A payment bond protects eligible subcontractors and suppliers if the contractor does not pay; a bid bond supports the bidder’s commitment to sign the contract and provide required final bonds.
Should I reject a contractor that uses cash-basis accounting?
Not automatically, especially for a small private project. Ask the CPA to reconcile cash-basis or completed-contract figures to the company’s operational WIP, backlog, receivables and obligations; sureties generally prefer percentage-of-completion statements for larger programs.
What should I put in the contract if the financial review is inconclusive?
Use project controls that limit exposure: milestone payments tied to verified progress, retainage where appropriate, prompt lien waivers, notice requirements for payment disputes, rights to updated financial or bonding information, and clear termination and replacement provisions. Have a construction lawyer adapt them to your state’s lien and payment laws.