DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowBlack Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
BETTESWORTHConstruction
Idaho Power

Construction Began on Idaho’s Jackpot Solar Project—Here’s Its Current Status

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Construction on Duke Energy Sustainable Solutions’ 120-megawatt Jackpot Solar project in Twin Falls County began in April 2022. The plant entered commercial service in late 2022, with Duke announcing operations on January 26, 2023. It is operating today, but it is no longer Idaho’s largest solar facility: Idaho Power’s 2025 planning documents list the 200-MW Pleasant Valley Solar project as entering service on March 2, 2025.

Where is Idaho’s Jackpot Solar project?

Jackpot Solar is in rural Twin Falls County, south of the city of Twin Falls. The project occupies approximately 952 acres and was announced as Duke Energy Sustainable Solutions’ first utility-scale renewable-energy project in Idaho.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The site was selected for a large ground-mounted solar array rather than a residential or commercial installation. Its scale allows the project to sell electricity under a long-term contract to a utility instead of serving individual property owners.

When did construction start, and who built the project?

Duke Energy Sustainable Solutions announced the construction start on April 28, 2022. SOLV Energy provided engineering and construction services, while Duke Energy Sustainable Solutions retained ownership and responsibility for operating the facility.

Popular on Amazon
ECO-WORTHY 200 Watts 12 Volt/24 Volt Solar Panel Kit with High Efficiency Monocrystalline Solar Panel and 30A PWM Charge Controller for RV, Camper, Vehicle, Caravan and Other Off Grid Applications
  • [Wide Application]: Daily Output 800wh/day under 4 hours full sunshine condition. Perfect for RV, Caravan, Marine, Camper, Electric scooter, Golf Carts, Power wheels, Trolling motor, Tool trailer, Backup power supply for cabin shed home etc.
  • [Excellent Performance]: ECO-WORTHY solar panels use high-performance monocrystalline solar cells, which can provide up to 21.5% higher efficiency sufficient light conditions.size:35.2*23.1.37in
  • [Durable]: The corrosion-resistant aluminum alloy frame is built to last for decades, withstanding 2400Pa wind and 5400Pa snow loads. IP68-rated junction box for all-weather protection.
  • [Complete and Easy]: Pre-drilled mounting holes and plug-and-play cables allow quick installation. The kit can be connected in series (24V) or parallel (12V) if you need. What you will get: 2 pcs 100W mono solar panel + 2 set of Z mounting brackets + 30A solar controller + 1 pair of 16.4ft 10 awg solar cables + 1 pair of 2-in-1 connectors + 1 pair of 4.92ft tray cable.
  • [Support]: 1 year with 24/7 tech support, if any problems or questions about the product,please do not hesitate to let us know through Amazon or call ECO-WORHTY hotline for solution.

Duke said peak construction employment would reach approximately 200 workers. That figure describes the expected maximum workforce during the build, not a permanent staffing level after the plant entered service.

The announcement also identified local economic benefits, including spending in the area and tax revenue for the Filer Consolidated School District. The Duke Energy Foundation separately provided a $15,000 grant to the Shoshone Basin Rangeland Fire Protection Association.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How large is Jackpot Solar?

Jackpot Solar has a nameplate capacity of 120 MW. Duke said the plant could generate enough electricity in a typical year to serve roughly 24,000 homes. “Nameplate capacity” is the maximum rated output of the equipment at a given moment; annual household equivalence reflects the project’s expected yearly generation and is not a promise that 24,000 homes receive power directly from the site.

Project detail Jackpot Solar
Nameplate capacity 120 MW
Site About 952 rural acres in Twin Falls County
Construction announcement April 28, 2022
Engineering and construction SOLV Energy
Owner and operator Duke Energy Sustainable Solutions
Expected annual household equivalent Roughly 24,000 homes, according to Duke
Peak construction workforce Approximately 200 workers

Is Jackpot Solar operating now?

Yes. Idaho Power’s 2025 Integrated Resource Plan records commercial operations beginning in December 2022. Duke Energy Sustainable Solutions announced the project’s commercial operation on January 26, 2023. The two dates describe the same transition into service from different reporting points: the utility’s planning record identifies the operating month, while Duke’s release supplied the later public announcement date.

Also popular on Amazon
Renogy 100W 12V Solar Panel Starter Kit with 30A PWM Controller | Complete kit includes Monocrystalline solar panel, Charger Controller, cables, Z-brackets. For RVs, campers, off-grid.
  • 【Efficient Performance】This Starter Kit can generate an average of 500Wh of electricity per day (varies with sunlight). The solar panel boasts a 22.5% cell efficiency, 1.3% higher than other counterparts. Each panel dispatched from our facility undergoes 100% EL testing, ensuring that your panel is completely free from any hidden cracks.
  • 【Market-Leading Service Plan】Enjoy worry-free usage with our market-leading service plan, providing 10 years of coverage for solar panel material and workmanship, along with a 2-year plan for the charge controller. Additionally, benefit from a 25-year service plan for the power output of the panel.
  • 【Exceptional Safety】Certified by UL 61730, CSA C22.2#61730, IEC 61730/IEC 61215, our solar panel withstands 2400Pa wind and 5400Pa snow loads. Featuring IP65-rated J-box and IP67-rated solar connectors, rest assured, it can tackle any weather challenge.
  • 【Remote Monitoring】The Wanderer PWM Charge Controller features an RS232 Bluetooth port. By adding a Renogy BT-1 Bluetooth Module, you can remotely monitor your solar system on the Renogy DC Home app. Keep track of voltage and current at any time, and receive timely warnings for over-voltage, under-voltage, and over-discharge.
  • 【Excellent Compatibility】The solar kit with the Wanderer 30A PWM Charge Controller, supports expansion up to 400W with additional solar panels and is compatible with AGM, Gel, Flooded, and Lithium batteries.

The project therefore should be described as an operating solar plant, not a project still under construction.

How does Idaho Power buy Jackpot Solar’s electricity?

Idaho Power agreed to purchase the project’s output through a 20-year power-purchase agreement. Under that arrangement, the utility receives the electricity generated by the facility for the contract term, while the project’s renewable-energy credits (RECs) also go to Idaho Power.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

A REC represents the environmental attributes associated with producing one megawatt-hour of renewable electricity. Assigning the RECs to Idaho Power allows the utility to account for the project’s renewable generation in its resource planning and clean-energy reporting; the electricity and the REC are separate accounting elements of the contract.

Jackpot Solar contributes to Idaho Power’s stated goal of providing 100% clean energy by 2045. The project is one resource within that broader system target, rather than a standalone guarantee that every customer’s electricity is supplied exclusively by solar power.

Was Jackpot Solar Idaho’s largest solar facility?

It was described that way when construction began and when the project entered service, but “largest” is time-sensitive. Idaho Power’s 2025 plan lists Pleasant Valley Solar at 200 MW and records its commercial operation date as March 2, 2025. That capacity exceeds Jackpot Solar’s 120 MW, and Sundt’s project description calls Pleasant Valley the largest contracted solar facility in the Idaho Power system.

Project Capacity Status and date Location
Jackpot Solar 120 MW Operating; commercial operations recorded December 2022, publicly announced January 26, 2023 Twin Falls County
Pleasant Valley Solar 200 MW Operating March 2, 2025 Not stated in the cited planning record
Pleasant Valley Solar 2 125 MWac Commissioned by July 2026 Not stated in the cited project update
Blacks Creek Energy Center 400 MWac Construction begun by July 2026 Ada County

In July 2026, rPlus Energies reported that Pleasant Valley Solar 2 had been commissioned and construction had begun on the 400-MWac Blacks Creek Energy Center in Ada County. The company said the two projects represented more than $750 million in investment and hundreds of construction jobs. Those developments show why a project’s ranking can change quickly as larger facilities are commissioned.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What did the project mean for the local community?

The construction plan brought a temporary workforce of about 200 people at its peak and created demand for local goods and services. Duke also cited tax revenue benefiting the Filer Consolidated School District. The $15,000 foundation grant to the Shoshone Basin Rangeland Fire Protection Association supported a local fire-protection organization, adding a direct community contribution beyond construction spending.

After construction, the plant’s economic profile shifts from a large temporary workforce to long-term operations, maintenance, property-tax and contracted-energy activity. The available project announcements do not state a permanent employee count or a separate annual tax total.

Also popular on Amazon
Portable Solar Generator 300W Portable Power Station with 60W Solar Panel | 110V Pure Sine Wave 280Wh Battery Solar Power Pack with USB QC3.0 DC AC Outlet for Camping Smart Device RV Van Outdoor-Orange
  • Portable Generator with 60W Solar Panel Included: with a big battery pack, ZeroKor 300W solar powered generator are powerful enough to charge smartphones,tablets,laptops,headphones or other outdoor small camping supplies(Tips:Using electrical appliances over 300W may damage the portable solar generator, especially some devices that are prone to heat or built-in air compressor such as coffee maker,Hair dryer, water pump etc )
  • Multiple Charging outlets for camping gear with SOS Flashlight: with 2* 300W Max wall AC outlets, 1* DC port (9V-12.6V/10A max ), 3* 5V/3A Max USB ports, 1*quick charge USB port (5V/3A 9V/2A Max), Flashlight with reading mode and SOS mode for your outdoor Adventures, our portable solar power station offers a versatile charging solution,allowing you to charge your outdoor smart devices directly from a wall AC outlet
  • Multiple Charging Optional, Solar Panel Charger 60W Included: ZeroKor portable power bank generator can be recharged by Home AC outlet, DC5521 13V-23V Solar Panel (Portable Power Station built-in MPPT), 12V Carport. Take the portable solar power bank generator with you on-the-go and never worry about power shortage,the portable AC outlet design makes it more suitable for Tent camping OFF-Grid
  • Built in BMS(Battery Management System) : ZeroKor portable power station features short circuit protection, over-current protection, over-voltage protection, overload protection and overheating protection. The built-in cooling fan system will automatically start and stop according to the portable battery pack internal temperature during use. Acting as a portable solar power bank, it accommodates multiple devices simultaneously, making it perfect for indoor and outdoor use
  • HIGH CONVERSION EFFICIENCY: ZeroKor solar panels 60W monocrystalline solar cell have a high conversion efficiency of 20.5%, and its performance is better than that of polycrystalline solar panels under the condition of insufficient light

Why does Jackpot Solar matter to Idaho’s power system?

The project adds 120 MW of utility-scale renewable generation under a 20-year utility contract, giving Idaho Power a known source of solar energy and associated RECs over a defined period. It also marked Duke Energy Sustainable Solutions’ entry into Idaho’s utility-scale renewable market.

Solar output varies with daylight and weather, so a 120-MW rating does not mean the plant supplies 120 MW continuously. Idaho Power must balance this resource with other generation, storage, transmission and customer demand as it pursues its 2045 clean-energy objective.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Frequently Asked Questions

Does Jackpot Solar include battery storage?

The project announcements and planning references identify the solar generation capacity and power-purchase agreement but do not state that a battery-storage system is included. It should therefore be described as a 120-MW solar project, without assuming co-located storage.

Who receives the renewable-energy credits from Jackpot Solar?

Idaho Power receives the project’s RECs under the 20-year power-purchase agreement. That allocation lets the utility claim the associated renewable attributes in its accounting rather than leaving them with the project owner.

How long will Idaho Power’s contract for Jackpot Solar last?

The power-purchase agreement has a 20-year term. The cited announcements do not specify the exact calendar date on which that term ends.

Is Jackpot Solar the same as the Jackpot facility in Nevada?

The project covered here is in Twin Falls County, Idaho, south of Twin Falls. Its location and Idaho Power contract distinguish it from similarly named projects in other states.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 18, 2026 10:33 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.