Halloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsPC HealthRecommendedCrashes, freezes, slowdowns? Check your PC nowSpot repairable issues before they interrupt work.Check PCHalloween DealsAmazon USOctober picks are moving - compare before checkoutAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction
building investigations

Construction Authority names developer, contractor and engineers behind collapsed Eastleigh building

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Kenya’s National Construction Authority (NCA) recorded 9th Street Plaza Limited as developer, Stromax Holdings E.A Limited as contractor, Emmanuel Mwangi Maina as project architect and Joseph Muturi Mugu as structural engineer for the multi-storey building that collapsed in Eastleigh, Nairobi, on Friday, October 23, 2026. The project was registered on July 30, 2025, for 9th Street in Kamukunji Sub-County. That registry identifies the parties attached to the proposed development; it does not establish that any of them caused the collapse or is legally liable. Rescue operations and investigations were continuing, and casualty figures changed between reporting updates.

Who did the NCA name in connection with the Eastleigh building?

The NCA listed four parties in its project record. Their recorded roles were:

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Party Role recorded by the NCA What the record establishes
9th Street Plaza Limited Developer The company was recorded as the developer for the proposed project.
Stromax Holdings E.A Limited Contractor The company was recorded as the contractor.
Emmanuel Mwangi Maina Project architect The individual was recorded as the architect attached to the project.
Joseph Muturi Mugu Structural engineer The individual was recorded as the structural engineer.

The registration was for a proposed development on 9th Street, Eastleigh, in Nairobi’s Kamukunji Sub-County. An NCA listing is an administrative project record, not a finding of negligence, a conclusion about professional conduct or proof of responsibility for a structural failure.

When and where did the building collapse?

Citizen Digital reported that the multi-storey structure collapsed on Friday, October 23, 2026. Rescue teams and preliminary investigators went to the site after the collapse. The NCA said the location had been cordoned off while a multi-agency team coordinated rescue work and began preliminary investigations.

Popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

In a statement reproduced by Citizen Digital, the authority said: “The immediate priority is the safety of the public. The site has been cordoned off, and a multi-agency team is on the ground coordinating rescue efforts and conducting preliminary investigations.”

Was the building approved and occupied legally?

Public accounts had not been reconciled by the latest reports. The Eastleigh Voice reported Nairobi Governor Johnson Sakaja as saying that the structure did not have an occupation certificate, a document required before a building is occupied.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

A separate account described a review of county records in which an application for a building of more than 15 floors had not been approved. That account conflicts with the earlier description that the project had construction approval but lacked an occupation certificate. Until an official record resolves the discrepancy, both statements should be treated as attributed claims rather than a settled approval history.

The NCA reports reviewed in the coverage did not say whether the authority had inspected the building before the collapse, whether earlier violations had been reported or whether enforcement action had been taken.

Also popular on Amazon
Sale
DEWALT 20V MAX Drill and Impact Driver (DCK240C2) | Includes 2 Batteries, Charger and Bag (
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

How many people were missing or rescued?

The figures came from different stages of the emergency response and should not be combined into one final toll.

  • The Kenya Red Cross said 66 of 67 construction workers had been accounted for in its 2026 update.
  • The same Kenya Red Cross update said 31 missing-person reports were being checked. A missing-person report is an allegation requiring verification, not a confirmed count of people trapped in the building.
  • An earlier update from Kenya’s Interior Ministry referred to seven people reported missing.
  • Wrivid reported conflicting rescue totals: some accounts said two people had been rescued, while a later Eastleigh Voice update reported a third survivor.

These differences reflect rolling reports from an active rescue scene. A verified final number depends on authorities reconciling worker lists, missing-person reports, hospital records and on-site searches.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What investigations are under way?

The Engineers Board of Kenya opened an investigation into factors that may have contributed to the collapse and the role of the engineers involved, according to Wrivid. The reviewed reports did not contain findings from that inquiry.

Police also indicated that criminal accountability remained possible but had not been determined. Nairobi Regional Police Commander Issa Mohamud said: “Whoever is the owner, whoever authorised the building, all of them may be charged appropriately, but that will come after thorough investigations are done.” His statement described a possible future course, not an announcement of arrests or charges.

Also popular on Amazon
Sale
Push to Unlock,Katerk 6pcs 1/4 inch Hex Shank Aluminum Alloy Screwdriver Bit Holder Light-Weight Quick-Change Extension Bar Keychain Drill Screw Adapter Portable,Black Carabiner,Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

No regulator or court had announced a cause of the collapse, a finding of professional misconduct, an arrest, a charge, a prosecution or a judgment in the reports available for this developing incident.

What can be established about each named party?

The NCA record establishes who was attached to the project in the four listed capacities. It does not, by itself, show the terms of any contract, who supervised particular construction activities, whether designs were changed, whether materials met specifications, or whether inspections were passed.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • Developer: The listed developer would ordinarily be the project’s commissioning party, but the NCA record does not establish ownership arrangements or decision-making at the site.
  • Contractor: The listed contractor was the company recorded for construction work; the record does not establish which work packages it performed or whether subcontractors were involved.
  • Architect: The listed architect was attached to the project in the design role; the record does not establish the scope of architectural services or site supervision.
  • Structural engineer: The listed engineer was attached to the structural role; the Engineers Board inquiry is intended to examine the engineering issues and professional role.

Those distinctions matter because registration is evidence of an administrative designation, while liability requires findings based on technical evidence, records and due process.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What happens next in the Eastleigh case?

Authorities must first complete search and rescue work and confirm who was on the site. Investigators can then compare approved drawings, county and NCA records, construction stages, inspection documentation, material evidence and professional sign-offs. The Engineers Board’s process and any police investigation may produce separate findings, and neither should be treated as conclusive until the responsible authority publishes its results.

Also popular on Amazon
Sale
2 Pack Carpenter Pencils Mechanical Pencils with 12 Refills, (2 Colors) | Construction Pencils with Built-in Sharpener, Long Nib Deep Hole Pencil Marker, Heavy Duty Woodworking Pencil for Architect
  • Long Nib and Deep Hole Marker: Our mechanical carpenter pencil with 45mm nib is designed for easy marking of deep holes or narrow areas. These construction pencils are the great choice for woodworking tools, construction tools, carpenter tools, contractor tools, wood carpentry tools and architect tools
  • Extra Refills in 2 Colors for Versatile Marking: The construction mechanical pencil comes with 12 extra 2.8mm refills, including 6 red and 6 black refills. The black refill is suitable for light surfaces, while the red wax is perfect for dark surfaces. Our carpenter mechanical pencil makes sure that you'll have an ample supply for extended use
  • Built-in Sharpener: Our construction pencil comes with a built-in sharpener to ensure the mechanical pencil tip is always sharp and ready for use. Never buy an extra pencil sharpener again. A great tool for any woodworker pencil, contractor pencils. The refill can easily be extended or retracted with a simple click of the pencils mechanical, allowing you to work more efficiently and accurately
  • Portable Clip Design: Our deep hole construction pencil features a portable clip design, easy to carry and attach to your pocket or tool box, so that you can keep the carpenter pencils mechanical close at hand, making it a convenient tool to have on the go. Great gifts choice for carpenters
  • Stronger Pencil Lead: The black refills are made of lead, sturdy and smooth. The red refills are made of wax, clear and light. These marking pencils are much thicker and stronger than normal pencils during the marking process of construction work, suitable for various surfaces, such as glasses, metal, boards, floors, walls, furniture, etc. The written marks can be easily wiped with a wet paper towel when needed

Because the incident occurred on October 23, 2026, early statements may change as records are checked. The safest reading of the current information is that the NCA has identified the project parties, while the cause of the collapse, the approval history and any legal responsibility remain unresolved.

Frequently Asked Questions

Why do reports give different numbers for people missing or rescued?

Emergency figures are updated as teams check worker registers, family reports and hospitals. “Accounted for,” “reported missing” and “rescued” describe different stages and categories, so they cannot be added together without a final reconciliation.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is an occupation certificate?

It is the authorization required before a completed building is occupied. A statement that a structure lacked one addresses permission to occupy; it does not, on its own, prove why the structure failed.

Can an NCA project listing be used as proof that a party is guilty?

No. The listing shows which developer, contractor and professionals were recorded for the project. Investigators and courts would need separate technical and documentary evidence to establish fault or liability.

Have any people been charged over the collapse?

No arrest or charge was confirmed in the reports reviewed. Police said charges could follow thorough investigations, while the Engineers Board inquiry was still in progress.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Leave a Reply

Your email address will not be published. Required fields are marked *

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.