Black Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run ScanBlack Friday PreviewAmazon USThe best pick may show up before FridayAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction

Beaverton High School’s New Campus: What the Oregon Project Actually Delivers

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

The Beaverton High School replacement in Beaverton, Oregon, opened its new building in August 2026, but the campus project is not finished: demolition of the former school and other site work are continuing, with overall completion scheduled for summer 2027. The project is described as a potential K–12 design model because it combines seismic features, varied learning and career-training spaces, and student amenities. That is a design ambition, not a proven outcome: the available sources do not report comparative evaluations or post-opening performance data.

The new facility replaces a school whose history dates to 1916, according to the district. Its opening gives students and staff a new building for the 2026–27 school year, while construction activity continues elsewhere on campus. That distinction matters: the school building is in use, but demolition, parking and athletic-field work are still part of the broader project.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is the Beaverton High School project?

It is a phased replacement of Beaverton High School, funded through Beaverton School District’s bond program. The district identifies the project as a new high school of approximately 292,000 square feet, designed for 1,500 students. Building Design + Construction (BD+C) reported a 300,500-square-foot building and the same capacity in its 2025 project coverage. Those area figures differ and should be understood as source-specific estimates rather than a single reconciled measurement.

The district’s Beaverton High School bond project page lists a $253 million project budget. BD+C’s 2025 account distinguishes $221 million for construction from $253 million in total replacement-school costs, including design, permitting and project management. These are different cost scopes, not necessarily conflicting totals: the construction figure covers a narrower category, while the total includes associated project costs. The district’s current project page also gives $253 million as the budget.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

BD+C described the replacement as Beaverton’s most ambitious K–12 project to date and reported that it was funded within a $753 million bond passed in May 2022. Those statements provide context about the project’s scale and funding; they do not establish the building’s long-term cost efficiency or educational impact.

When did the new school open, and what remains unfinished?

The new building opened in August 2026, and students and staff are using it during the 2026–27 school year. The district’s September 21, 2026 update says Phase 2 work remains underway and identifies summer 2027 as the planned completion point for the overall project.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The work is divided into phases rather than a single opening date. Phase 1 allowed the school community to move into the new building. Phase 2 includes demolition of the old building, parking and bus drop-off work, and conversions of athletic fields, including baseball and softball field work. The district’s September 2026 project update says the completed Phase 1 lets students and staff make the new campus their own and enjoy the 2026–27 school year.

For families, staff and visitors, the practical takeaway is to distinguish the building’s operational status from the campus construction schedule. The school is open, but routes, parking arrangements and outdoor facilities may be affected by remaining work. The district update establishes that these activities are ongoing; it does not provide a permanent post-construction circulation plan or exact completion dates for each individual site feature.

How is the building designed for earthquakes and controlled access?

Seismic resilience and access control are among the project’s documented design priorities. The district lists seismic reinforcement and identifies the school as a community earthquake evacuation center. BD+C describes a higher-than-required seismic standard and integrated seismic joints intended to let separate building segments move independently.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

That structural approach is relevant in a school made up of multiple connected areas: joints can accommodate movement between segments rather than treating the whole building as one uninterrupted structure. The sources describe the design intent, however, not a post-opening seismic test, a guarantee against damage, or measured safety performance. The evacuation-center designation likewise identifies a planned community role; it should not be read as evidence that the facility has already been evaluated in an emergency.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

BD+C also reports a single controlled entry, strategic restrictions on access, and no access from the school to the adjacent Farmington Road thoroughfare. These are architectural and circulation choices intended to manage how people enter and move around the site. The available descriptions do not provide a detailed security plan, explain every access procedure, or establish how the design performs in practice after occupancy.

What learning and career-training spaces does the school include?

The program extends beyond standard classrooms, with dedicated facilities for science, special education, career and technical education (CTE), arts, athletics, and student support. The district lists 36 general-education classrooms, eight science classrooms, three special-education classrooms and four CTE classrooms, along with two CTE labs.

Those counts help clarify the mix of spaces, but they do not describe enrollment by program, class size, course offerings or staffing. CTE rooms and labs are identified as containing career-training infrastructure in BD+C’s account; the sources do not specify the equipment in each lab or which technical pathways students will be able to pursue. The design provides settings intended for career-oriented instruction, while the educational program ultimately depends on how the district uses and staffs them.

Other reported spaces include a black-box theater with acoustic cedar cladding, a pottery room, breakout study zones and an enclosed student courtyard. These features support different activities—performance, making, informal collaboration and time outside the main classroom sequence—rather than requiring every school task to take place in a conventional room. The existence of varied spaces is documented; the sources do not measure how frequently students use them or whether they change learning outcomes.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

How does the project address student health, comfort and accessibility?

The district lists natural light and fresh air, accessibility, a health clinic, and a yoga studio among the building’s features. These choices place physical comfort, access and student support alongside academic facilities in the project brief. A naturally lit gymnasium with a second-level track is also reported by BD+C, as are the enclosed courtyard and breakout study areas.

The health clinic is a notable element because it gives the campus a dedicated space for student health services. The sources do not state what clinical services are offered, who operates the clinic, or its hours, so those details should be confirmed with the school or district rather than inferred from the facility’s presence. Similarly, the listed accessibility features indicate a design priority but do not substitute for a technical accessibility audit or user feedback.

The district also lists solar panels. Their presence is a documented building feature, but the available project material does not state system capacity, annual generation, energy-use intensity, utility savings or emissions reductions. A solar installation can contribute to a building’s energy strategy; without those figures, it is not possible to quantify its effect or compare the school’s energy performance with another facility.

Which sports and campus improvements are complete?

The new building’s sports-related amenities include a naturally lit gymnasium and its second-level track. BD+C also reports new tennis courts and athletic-field improvements, including new football-field turf. The district’s September 2026 update, however, places baseball and softball fields among the Phase 2 work still underway.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

That separation avoids treating every athletic improvement as complete simply because the school building has opened. Some facilities are described as part of the new campus, while particular field work remains in the construction phase. The update does not provide a complete feature-by-feature inventory of what is open to students as of a given date, so current access to a specific field or court should be checked with the district.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

Who designed and built the replacement school?

BD+C identifies BRIC Architecture as architect of record, Walker Macy as designer, KPFF as structural engineer, and Skanska as contractor. Those attributions describe the reported project team and roles. They do not, by themselves, establish an evaluation of the firms’ work or the building’s delivered performance.

BD+C’s September 2025 account presented the project as being positioned as a K–12 design model, drawing attention to its seismic approach, program variety and student amenities. “Model” is best read as a claim about design ambition or potential influence. The sources available here are project descriptions and district updates, not an independent comparison of schools or a post-occupancy study.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What can—and cannot—be concluded about the school as a design model?

The project offers a documented combination of features that other school-planning discussions can examine: seismic reinforcement and movement joints; controlled entry and restricted access; a substantial mix of general, science, special-education and CTE rooms; arts and wellness spaces; and community-oriented emergency and event functions. These elements explain why the project has drawn attention as a design example.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

They do not yet answer the outcome questions that would establish whether it is a successful model. The supplied sources do not provide post-occupancy measurements of safety, energy use, maintenance costs, classroom utilization, accessibility in practice, learning results or total cost performance. Nor do they compare Beaverton with another school built to a similar standard. A careful assessment can therefore describe what was designed and what is operating, while reserving judgment on performance until comparable evidence is available.

The most useful distinction is between design intent and verified results. Seismic joints and access choices document an approach; they do not prove safety outcomes. Solar panels document an installation; they do not quantify energy savings. A range of specialized spaces demonstrates a varied program; it does not prove changes in achievement. The project’s opening is a milestone, and the planned summer 2027 completion will close the remaining construction phase, but neither event is itself an outcomes evaluation.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

Frequently Asked Questions

How many students can the new Beaverton High School hold?

The district and BD+C both give the school a capacity of 1,500 students. That is a stated design capacity, not a report of current enrollment or daily attendance.

When was the original Beaverton High School built?

The district says the original school dates to 1916. The new replacement building opened in August 2026, while demolition of the old building is part of the remaining campus work.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Are public tours of the new Beaverton High School available?

The district’s September 2026 update announced community tours for 2027, but the supplied information does not give dates, registration details or visitor requirements. Check the district’s bond-project updates for current tour arrangements.

Has the new school been proven to improve learning or withstand an earthquake?

The available material documents design features and the school’s intended community evacuation role, but it does not report post-opening earthquake testing or measured learning outcomes. Those conclusions would require evidence beyond project descriptions.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.