Black Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run ScanBlack Friday PreviewAmazon USThe best pick may show up before FridayAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction

ASHRAE Standard 90.1-2022: What Improved and What the 9.8% Savings Figure Means

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

ASHRAE Standard 90.1-2022 is estimated to use 9.8% less national-average site energy than the 2019 edition. That figure comes from the U.S. Department of Energy (DOE) and is a modeled comparison of the two editions—not a guaranteed reduction for every building and not an estimate for the later 2025 edition.

For owners, designers and contractors, the practical change is a more demanding code baseline, new Section 11 energy-credit requirements, and revised whole-building performance paths. The edition that controls a project, however, is the one adopted and enforced by its state or local authority having jurisdiction (AHJ). Always confirm that edition, its effective date and local amendments before making design or construction decisions.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How much more efficient is ASHRAE 90.1-2022 than the 2019 standard?

DOE’s affirmative determination says buildings meeting Standard 90.1-2022 would achieve 9.8% national-average site-energy savings compared with buildings meeting Standard 90.1-2019. DOE published that conclusion in its 2024 Federal Register determination, supported by a technical analysis of the changes between editions.

The wording matters:

  • Baseline: 90.1-2019, not 90.1-2025.
  • Metric: site energy, not energy cost, source energy, emissions or peak demand.
  • Scope: a modeled national-average comparison of code-compliant commercial buildings.
  • Meaning: an estimate of the performance of the two code editions as modeled, not a promised utility-bill reduction for an individual project.

DOE’s exact conclusion is that “buildings meeting Standard 90.1-2022, as compared with buildings meeting the previous 2019 edition, would result in national average site energy savings of 9.8 percent of commercial building energy consumption.” A building’s actual result will depend on its form, climate, systems, schedules, controls, operation and maintenance, and how faithfully the design is built and commissioned.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

ASHRAE separately describes the 2022 Section 11 energy-credit provisions as enabling approximately 4% to 5% energy-cost savings. That is a feature-level estimate from ASHRAE, measured in energy cost, and must not be added to or substituted for DOE’s 9.8% site-energy result.

What is Standard 90.1, and which buildings does it cover?

Standard 90.1 establishes minimum energy-efficiency requirements for buildings other than low-rise residential buildings. Its scope reaches design and construction, provisions for operation and maintenance planning, and on-site renewable-energy use. It is a model standard; it becomes legally binding only when a government adopts it through its building or energy code.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The standard is used by code officials, architects, engineers, energy modelers, contractors, commissioning teams and owners. A project may also be required to demonstrate compliance with a state code that references a particular 90.1 edition, with amendments that change how the model text is applied.

Do not assume that the newest edition is automatically the governing requirement. ASHRAE identifies 90.1-2025 as its published edition, but a jurisdiction may still enforce an earlier edition. The permit pathway, project location, occupancy, scope of work and AHJ interpretation determine which requirements apply.

What changed in 90.1-2022?

The 2022 edition incorporates revisions intended to improve efficiency and updates the ways a project can demonstrate whole-building performance. Two changes are especially important for project teams because they affect both design choices and compliance documentation.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons

Section 11 added energy-credit requirements

Section 11 introduced additional efficiency requirements through energy credits. Instead of treating every project as identical, the credit structure provides a menu of measures that can be selected to reach the required level. ASHRAE’s overview of the 2022 changes says these provisions enable approximately 4% to 5% energy-cost savings.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

For a construction team, credits are not a late-stage checklist. They can influence envelope details, equipment selections, lighting and controls coordination, metering, renewable-energy decisions and the information that must be submitted for approval. The responsible design professional should identify the required credits early, assign each one to an accountable party and preserve evidence—drawings, schedules, calculations, product data, control sequences and commissioning records—through construction.

Because the standard text and jurisdictional amendments control the exact requirements, use the adopted edition rather than relying on a summary. A credit that appears attractive in an early model may be impractical after equipment lead times, electrical capacity, maintenance access or fire and life-safety coordination are considered.

Whole-building performance paths were revised

ASHRAE revised the whole-building Energy Cost Budget Method and Performance Rating Method. These are alternative compliance paths that evaluate a proposed building against a modeled baseline rather than checking every prescriptive item in isolation. The revisions affect how the baseline and proposed models are assembled, how measures are represented and how results are documented.

ASHRAE’s technical article on the 2022 performance-path changes is useful for understanding the direction of the revisions. It is not a substitute for the adopted standard, addenda and local instructions. A model that satisfies a designer’s copy of 90.1-2022 may still fail if the AHJ requires a different software version, reporting format, baseline interpretation or amendment.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

How should a project team use the 2022 energy-credit and performance provisions?

Use a documented compliance plan before construction documents are complete. The following sequence reduces redesign and prevents a performance path from becoming an unverifiable promise.

  1. Confirm the governing rule. Ask the AHJ or code consultant which 90.1 edition is adopted, whether it is embedded in another energy code, when it became effective and what local amendments apply.
  2. Choose the compliance route. Decide whether the project will follow the applicable prescriptive provisions, the Energy Cost Budget Method, the Performance Rating Method or another route allowed by the adopted code.
  3. Assign responsibility for each requirement. Put envelope, HVAC, lighting, controls, electrical, renewable-energy and documentation items on a responsibility matrix. Identify the design professional who will make the final compliance determination.
  4. Lock assumptions early. Record building area, schedules, occupancy, climate data, ventilation assumptions, equipment efficiencies, setpoints and control sequences. Changes to these assumptions can alter both credit eligibility and modeled results.
  5. Coordinate procurement with compliance. Confirm that specified equipment and assemblies are available at the required efficiency and that substitutions will be reviewed for code and model impacts before approval.
  6. Document installation. Preserve submittals, shop drawings, control diagrams, test reports and photographs where they support a credit or modeled input. A compliant design cannot be demonstrated if the record does not show what was installed.
  7. Verify operation. Include functional testing and owner training where the compliance approach relies on controls, sequences, sensors or scheduled operation. The standard’s energy objective depends on systems operating as designed.
  8. Submit the final package. Provide the calculations, model reports, credit forms and construction evidence required by the AHJ. Keep the approved basis of compliance with the project record for future alterations and inspections.

What does the 9.8% number not tell you?

The DOE estimate does not predict a particular building’s utility bills. Site energy is the energy delivered to and consumed at the building—such as electricity or fuel at the site. Source energy accounts for upstream production and delivery losses. Energy cost depends on tariffs and rates. Emissions depend on the electricity-generation mix and fuel factors. These measures can move in different directions.

The estimate also does not isolate one product or one provision. It reflects the modeled effect of the edition as a whole. A project that uses a performance path may achieve compliance with a different mix of measures than a project using prescriptive requirements, while both satisfy the same adopted edition.

Finally, 9.8% is an average across DOE’s modeled national building stock. Climate, operating hours, plug loads, vacancy, maintenance and occupant behavior can make the difference between editions larger or smaller at a particular site. Present the number as an evidence-based national estimate, not as a payback calculation or a guaranteed savings claim.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What does DOE’s determination require from states?

Federal law requires DOE to review published commercial-building energy standards and determine whether an updated edition improves energy efficiency. DOE’s 2024 determination found that 90.1-2022 improves efficiency relative to 90.1-2019. The determination directs states to review their commercial energy-code provisions and, as necessary, update them to meet or exceed the revised standard.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

The Federal Register notice set March 6, 2026 as the deadline for state certification. That federal timetable does not by itself tell a contractor which text controls a permit. States may adopt through legislation, regulation or a code update, and local enforcement, amendments and effective dates still matter.

For a live project, obtain the adopted code citation from the AHJ or the project’s code consultant. Do not write “90.1-2022 applies” solely because DOE issued a determination or because ASHRAE has published a newer edition.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How is 90.1-2025 different from the 2022 savings comparison?

90.1-2025 is a later published edition, not the edition used in DOE’s 9.8% comparison. ASHRAE reports that the 2025 edition incorporates 105 addenda. That fact describes the scale of the revision history; it does not establish a percentage of savings.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

No DOE savings determination for 90.1-2025 is established by the evidence for this article. Therefore, do not describe 2025 as delivering 9.8% savings, and do not extrapolate the 2022-versus-2019 result to it. Use the ASHRAE 90.1-2025 scope information and the current standard text for requirements, then check the jurisdiction’s adoption status.

In July 2026, ASHRAE announced a future direction that keeps energy efficiency and cost-justified requirements as 90.1’s primary focus. It also said the committee plans to move optional operational-carbon concepts introduced in the 2025 edition to a separate publication. That is a stated plan, not a completed revision or a change that should be treated as current code.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

What are the most common compliance mistakes?

  • Quoting 9.8% without the baseline. Always name both editions: 2022 versus 2019.
  • Calling site-energy savings “cost savings.” Use the metric supplied by the source; ASHRAE’s 4%–5% figure is a separate energy-cost estimate tied to Section 11.
  • Applying 2025 requirements automatically. The published edition and the legally adopted edition may differ.
  • Choosing credits after design is fixed. Late selections can trigger equipment changes, structural conflicts or unavailable products.
  • Treating a model as proof of installation. Field substitutions and control changes must be reviewed and documented.
  • Ignoring addenda and amendments. Use the complete adopted text and the AHJ’s required forms and software instructions.
  • Promising project-level savings. A national modeled average is not a guarantee for an individual building.

Where can you verify the requirements?

Start with the authority that issues the permit, then obtain the exact ASHRAE edition incorporated by that jurisdiction. The DOE Building Energy Codes Program determinations page explains the federal review process; the DOE technical support document provides the analysis behind the 2022 determination. ASHRAE’s Standard 90.1 page identifies the current publication and access route.

For construction administration, keep one controlled copy of the adopted standard, all referenced addenda, jurisdictional amendments, approved compliance calculations and the final record of installed systems. That package is more useful than a generic statement that a project is “90.1 compliant.”

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What should a contractor take away?

90.1-2022 represents a measurable step beyond 90.1-2019 in DOE’s modeled national analysis: 9.8% less site energy on average. Its practical impact comes from the combined edition, including Section 11 energy credits and revised whole-building performance paths, not from a single piece of equipment.

Use the 9.8% figure to explain the policy-level improvement, not to promise a building owner a specific bill reduction. For a project decision, the controlling questions are which edition the AHJ has adopted, which compliance path the design team selected, what evidence each requirement needs and whether the installed building matches the approved design.

Frequently Asked Questions

Is the 9.8% figure a guaranteed reduction in my building’s energy bills?

No. It is DOE’s modeled national-average site-energy difference between 90.1-2022 and 90.1-2019. Actual consumption and bills depend on climate, occupancy, schedules, equipment, controls, maintenance and utility rates.

Does Standard 90.1 apply to a single-family or low-rise residential project?

Standard 90.1 is written for buildings other than low-rise residential buildings. The applicable residential or commercial code depends on the project’s classification and the jurisdiction’s adopted code, so confirm the scope with the AHJ.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Where can I get the edition of 90.1 that controls my permit?

Ask the permitting authority or project code consultant for the adopted citation, effective date and amendments. Then use the corresponding ASHRAE text and any required state or local compliance forms rather than relying on a newer edition sold by the publisher.

Can a project claim both the 9.8% site-energy savings and the 4%–5% Section 11 savings?

Those figures describe different things and should not be combined. The 9.8% figure is DOE’s whole-edition site-energy comparison, while the approximately 4%–5% figure is ASHRAE’s estimate for energy-cost savings enabled by the 2022 Section 11 credits.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.