Black Friday PreviewAmazon USBlack Friday preview: compare before the rush hitsAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run ScanBlack Friday PreviewAmazon USThe best pick may show up before FridayAmazon US: current deals, useful picks and tech finds.See Picks×
BETTESWORTHConstruction

ADA-Compliant Temporary Pedestrian Routes: A Construction Guide

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

An ADA-compliant temporary pedestrian route keeps people with disabilities connected to the pedestrian network when construction closes, relocates, or disrupts a path. In the public right-of-way, the Access Board’s PROWAG text calls for an alternate route when a pedestrian circulation path is temporarily closed, unless creating or maintaining one is technically infeasible because of site conditions or existing physical constraints. The exact design must follow the requirements governing the project—not a generic checklist—so confirm applicable federal, state, local, permit, and contract rules before setting up the route.

What makes a temporary pedestrian route accessible?

An accessible temporary route is a continuous, usable connection around or through a construction area. It should take pedestrians to the destinations served by the disrupted route, including crossings and transit access where affected, while reducing exposure to work activity and traffic. It must also be usable by people with disabilities, including people who use wheelchairs or other mobility devices and people with vision disabilities.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Accessibility is not established by posting a detour sign or placing a row of cones. The path’s width, surface, transitions, edges, crossings, and protection from hazards all matter. So does what happens when construction advances to its next phase: a route that was usable yesterday can become blocked, too narrow, or disconnected after equipment or barricades move.

The Access Board’s PROWAG text covers temporary as well as permanent pedestrian facilities in the public right-of-way. The FHWA Manual on Uniform Traffic Control Devices (MUTCD), 11th Edition addresses temporary traffic control, including accessibility features for disrupted pedestrian facilities. State manuals and local requirements may add project-specific procedures. For example, Caltrans has construction guidance for temporary pedestrian access routes; those California practices are not automatically nationwide rules.

Popular on Amazon
Sale
DEWALT 20V MAX Cordless Drill and Impact Driver (DCK240C2) | Power Tool Combo Kit, Includes 2 Batteries, Charger and Bag
  • Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
  • Both tools are designed to fit into difficult to reach spaces
  • Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
  • Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
  • One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips

One important distinction: the cited PROWAG dimensions are useful design requirements, but the project team must determine which standards and specifications apply to the work. Do not declare a route compliant solely because it meets a single width figure.

What should you check before choosing a route?

First identify what the work blocks and who needs to get through. Survey the existing path and all the connections that make it useful before choosing whether to keep it open or divert pedestrians.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  1. Map the affected network. Mark the sidewalk or path, entrances, curb ramps, crossings, transit stops, and accessible destinations that construction may affect. Follow connections far enough to confirm that a proposed detour returns people to the existing pedestrian network rather than ending at another obstruction.
  2. Record existing conditions. Note the route’s clear width, slopes, surface, obstructions, crossing controls, and any constraints at entrances or corners. Document the accessible features already present so the temporary route can preserve useful characteristics as closely as practical.
  3. Identify important destinations and users. Consider high-use places such as schools, medical facilities, and senior centers, as well as transit connections. Iowa DOT/SUDAS advises assessing the existing level of accessibility and the project’s impacts; local input can help identify connections that a site plan might otherwise miss.
  4. Map each construction phase. Show where barriers, equipment, excavation, and temporary crossings will be in each phase. A route must be workable for the construction sequence, not just for the first day of work.
  5. Check the governing documents. Identify the responsible agency, applicable accessibility and traffic-control standards, state supplements, local permit conditions, and contract specifications. Confirm who approves the traffic-control plan and who is responsible for inspections and changes.

This survey is the basis for the route decision. If the team cannot show an unbroken path from the point of closure back to the pedestrian network, the route is not complete, even if the detour is clearly signed.

Should you keep the existing pedestrian route open?

Keep the existing route open when construction can be staged so people can pass safely and accessibly. The MUTCD favors a convenient, accessible path that replicates useful characteristics of the existing route and avoids conflicts with vehicles, equipment, and work activity.

Keeping pedestrians on the same side of the street can avoid adding a crossing, especially a midblock crossing or one without suitable controls. It may also preserve direct access to entrances and transit stops. But retaining the route is not automatically safer: work may leave too little room, put people beside moving equipment, or expose them to traffic. Check the actual space and hazards before deciding.

If the path cannot remain open safely, design an alternate route that connects both ends of the closure and serves affected destinations. Depending on site conditions, options may include a temporary walkway, a signed detour, or alternate assistance. Compare them for continuity, extra crossings, transit access, usable width and surface, detectability, vehicle and work-zone exposure, available right-of-way, duration, and maintenance needs. Iowa DOT/SUDAS discusses route-control, detour, and alternate-assistance approaches; the MUTCD emphasizes convenience, accessibility, and hazard control.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Do not redirect pedestrians into a work area, an unprotected conflict with traffic, or a midblock crossing simply because it is the shortest path. Where a route brings people closer to vehicles, assess whether channelization is adequate or whether a temporary traffic barrier is needed.

How do you design the alternate route?

Design it as a continuous pedestrian connection, not as isolated pieces of temporary sidewalk. The route should begin before the closure becomes a barrier, guide people around the work, and reconnect them to the original network or accessible destination.

Also popular on Amazon
Sale
Nicpro Mechanical Carpenter Pencils for Construction (Black, Red) With Case | Deep Hole Marker Pencil Set Includes Sharpener and 26 Refills, Comfortable Grip, Heavy Duty Woodworking Tools for Architect
  • Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
  • Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
  • Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
  • Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
  • Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
  1. Lay out the full path. Include the approach to the closure, the temporary segment, transitions at both ends, any crossings, and the connection back to the network. Include transit-stop access if construction affects it.
  2. Keep the usable path clear. Locate signs, barricades, equipment, stored materials, and construction activity so they do not narrow or block the space pedestrians need. Check the full route rather than measuring only its most open section.
  3. Account for crossings and connections. If pedestrians must cross, evaluate where and how they will do so under the governing traffic-control plan. Do not create an unprotected crossing or leave a temporary route disconnected from curb ramps or other accessible connections.
  4. Plan for phase changes. Identify what will move when the work advances and how the alternate route will remain continuous during the transition. Update route information and controls when the layout changes.

The MUTCD says temporary facilities for disrupted, closed, or relocated pedestrian facilities in a temporary traffic-control zone must be detectable and include accessibility features consistent with those in the existing facility. That principle applies to the route as a whole: a smooth path that ends at an inaccessible crossing is not a usable alternate route.

How wide does the temporary route need to be?

The Access Board’s PROWAG text gives a minimum continuous clear width of 48 inches for pedestrian access routes. When the clear width is less than 60 inches, it specifies 60-by-60-inch passing spaces at intervals no greater than 200 feet.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Guidance Width and passing-space figures How to apply it
Access Board PROWAG text 48 inches minimum continuous clear width; if under 60 inches, 60-by-60-inch passing spaces at intervals no greater than 200 feet Confirm the standard and details applicable to the project before design or approval.
Caltrans construction guidance 60 inches as a target, 48 inches minimum, and 60-by-60-inch passing spaces at least every 200 feet when 60 inches cannot be maintained This is California guidance for its context, not a universal specification. Check the current manual and project requirements.

These figures are not interchangeable with a casual measurement of the distance between two objects. The relevant question is the continuous clear space available to pedestrians after accounting for channelizers, barricade feet, signs, and other obstructions. Verify the measurement and all required details against the governing standard and project documents.

Where a route is narrower than 60 inches, passing spaces need to be placed at the prescribed intervals, not merely wherever the work zone happens to open up. The passing space must provide the dimensions specified by the applicable standard. Because the route may change during construction, recheck width and passing locations after barriers or equipment are moved.

What surface, slopes, and transitions should you provide?

Use a smooth, continuous, hard surface that remains firm, stable, and slip-resistant under the conditions expected on site. The MUTCD warns against curbs and abrupt changes in grade or terrain that can trip people or create barriers. Caltrans guidance describes firm, stable, slip-resistant surfacing and includes slope limits for its context.

Temporary ramps and transitions should work for wheelchair users and people using other mobility devices. Avoid abrupt edges, loose material, mud, standing hazards, and deteriorated or uneven surfaces. Where a route crosses a change in level, check the ramp and transition dimensions and slopes against the applicable standards and the approved plans rather than assuming a field-built ramp is acceptable.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Rain, deliveries, excavation, and routine construction traffic can change a surface after installation. Include surface condition in regular inspections, and repair or replace portions that become unstable, slippery, blocked, or uneven. Where the route must remain open during work, coordinate the repair so the temporary fix does not create a new barrier.

How do you make the closure and route detectable?

People who are blind or have low vision need to detect both the closed path and the edges of the alternate route. Place a cane-detectable barrier across the full width of a closed path, and use continuous detectable edging where channelization defines the temporary walkway.

Also popular on Amazon
Push to Unlock, Katerk 6pcs 1/4 inch Hex Shank Screwdriver Bit Holder | Aluminum Alloy Drill Bit Holder Keychain Quick-Change Extension Bar Drill Screw Adapter, Black Carabiner, Tool Gifts for Men
  • 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
  • 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
  • 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
  • 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
  • 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.

The MUTCD cautions against using tape, rope, or plastic chain strung between devices to control pedestrian movement because these materials are not detectable and accessible. A visual sign alone may not tell a person with a vision disability that the route has changed or where to go. Consider the MUTCD’s discussion of audible, tactile, or other nonvisual information when planning how people will receive route information.

Check detectability from the pedestrian’s approach, not just from the contractor’s viewpoint. A barrier must clearly close the route, while edging must be continuous enough to guide people along the alternate path. Inspect the arrangement after devices are moved or damaged; a gap can send someone toward the hazard the route is meant to avoid.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What protection is needed from traffic and construction?

Choose barricades, channelizing devices, fencing, or temporary traffic barriers based on vehicle speeds, the likelihood of vehicle intrusion, work activity, and site geometry. The MUTCD says that when significant vehicle-incursion potential exists, pedestrians should be rerouted or temporary traffic barriers installed. Any shielding barrier must suit site conditions.

A wooden railing or ordinary fence is not a substitute for a crashworthy temporary traffic barrier when that level of protection is needed. Conversely, a large barrier is not automatically appropriate everywhere; its placement and effect on the usable pedestrian route must also be considered. Have the responsible project designer or agency make the site-specific traffic-control decision.

Separate pedestrians from construction operations as well as from roadway hazards. Keep equipment, materials, and active work out of the clear route, and prevent vehicles from entering the pedestrian space. The route should not depend on workers being present to warn people away from an unprotected conflict.

How should you inspect and maintain the route?

Inspect the route before opening it and regularly while it is in service. The MUTCD calls for regular inspection of work activity areas to maintain effective pedestrian traffic control. Caltrans describes pre-opening inspection and weekly checks for applicable Caltrans projects, using specific forms; that schedule and paperwork should not be assumed to apply to every project.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Use the inspection interval, authority, and documentation required by the responsible agency and contract. At a minimum, the inspection should look for conditions that can make the route inaccessible or unsafe:

  • Obstructions or narrowing from signs, equipment, stored materials, or construction activity.
  • Missing, displaced, or damaged barricades and detectable edging.
  • Surface deterioration, loose material, mud, standing hazards, or abrupt edges.
  • Lighting problems, inaccessible crossings, or a connection that has become disconnected.
  • New conflicts created by a changed work phase or vehicle movement.

Record defects and corrective actions according to project requirements, assign responsibility for repairs, and verify that the route is usable again after a fix. Inspect after layout changes and relevant incidents or damage, not only on a calendar schedule. If construction shifts the closure, update the route and its information before the previous arrangement becomes misleading.

Also popular on Amazon
Sale
Toolwiz Magnetic Pick Up Sweeper 17-inch Wide, 8.8 Lbs Magnet Pull Force | 8.8 Lbs, Rolling Magnetic Sweeper, Heavy Duty Magnet Pickup with Smooth Wheels, Yard Tools, Clean Nails for Construction
  • Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
  • Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
  • Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
  • Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
  • Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.

What if an alternate route is technically infeasible?

The cited PROWAG text allows an alternate means of providing access for pedestrians with disabilities when establishing or maintaining an alternate route is technically infeasible because of site conditions or existing physical constraints. This is a limited, site-specific provision—not a general convenience exception.

Document the actual constraint and involve the responsible agency and qualified project designer. Consider whether changing the construction staging, retaining part of the existing route, or choosing another path could avoid the constraint. If an alternate route cannot be established or maintained, determine what alternate means of access is required and how it will be communicated and delivered under the governing standards and project approvals.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Do not treat a lack of planning, a preferred work sequence, or a desire to reduce cost as proof of technical infeasibility. Nor should a project team assume that an informal assistance arrangement satisfies the requirement without the responsible authority’s review.

What should the project team document?

Keep a record that lets the responsible agency, contractor, and field personnel understand what route is approved and how it must be maintained. The exact documents depend on the project, but useful items to confirm in the applicable contract and agency procedures include:

  • The approved traffic-control plan and the temporary pedestrian route for each construction phase.
  • The affected connections and destinations, including crossing and transit-stop access where relevant.
  • Applicable route dimensions and design criteria, including any passing-space locations.
  • Device and barrier choices, with the site conditions that informed protection decisions.
  • Inspection responsibilities, required frequency, forms or records, and the process for correcting defects.
  • How changes to the route will be approved, installed, and communicated.

These records do not make an unsuitable route compliant by themselves. They make it easier to keep the actual field layout aligned with the approved design and the requirements that govern the work.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

How do you choose pedestrian-control equipment?

Equipment should be selected to serve a defined function: closing a path, channelizing pedestrians, providing detectable edging, or protecting people from vehicle intrusion. The appropriate category depends on the site and traffic-control plan; a product listing alone cannot establish that an item is accessible, approved, or suitable for a particular work zone.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Before selecting equipment, confirm its detectability, dimensions, stability, and compatibility with the planned clear width. Determine whether vehicle risk calls for a crashworthy temporary traffic barrier and verify any agency approval requirements. The MUTCD cautions that shielding barriers must fit site conditions, while Iowa DOT/SUDAS distinguishes device categories and ties selection to pedestrian and vehicle safety.

For a specific project, follow the contract, agency-approved plans, and applicable standards rather than relying on a generic product description. The responsible designer or agency must resolve whether the combination of devices and layout provides the needed access and protection.

Also popular on Amazon
Damaged Screw Extractor Set,Christmas Stocking Stuffers for Adults Men Him | Gifts for Men,Mens Gifts for Dad,Husband,Stripped Screws Bolt Drill Bit Tools for Easy Removal of Rusty Broken Screw
  • APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
  • The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
  • HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
  • EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
  • Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts

What is the practical pre-opening checklist?

Before pedestrians are directed onto the temporary route, confirm that the field layout matches the approved plan and remains connected from end to end.

  • The route avoids the closed work area and reconnects to the pedestrian network and affected accessible destinations.
  • Required clear width and passing spaces are maintained along the full usable route.
  • The surface is smooth, stable, slip-resistant, and free of abrupt edges and obstructions.
  • Transitions and temporary ramps meet the governing project requirements.
  • The closure is blocked with a cane-detectable barrier, and route channelization has continuous detectable edging where required.
  • Signs and route information do not rely on visual cues alone where nonvisual information is needed.
  • Crossings, transit access, and connections to curb ramps are usable and consistent with the approved traffic-control plan.
  • Pedestrians are appropriately separated from vehicles, equipment, and active work.
  • Inspection responsibility and the procedure for responding to a defect are clear.

This checklist is a field coordination aid, not a substitute for design review or applicable standards. The project’s route, exposure to traffic, slopes, surfaces, signals, transit connections, and agency rules determine what is required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Who is responsible for determining compliance?

The project team should not make a blanket compliance claim from a generic online guide. A qualified project designer and the responsible agency must apply the currently governing accessibility and traffic-control requirements to the actual work zone, including state supplements, local permit conditions, and contract specifications.

That review should account for the route’s complete geometry and operation, not just the temporary walkway segment. A site-specific plan is especially important where pedestrians are routed close to moving traffic, must cross a street, encounter significant grade changes, or need continued access to transit or important destinations.

Frequently Asked Questions

Do I need an accessible detour if the sidewalk is closed only overnight?

The cited guidance does not establish a duration-based exemption. Confirm the requirements for the specific closure with the responsible agency and project documents, and plan the route for the period pedestrians will encounter the obstruction.

Can a temporary pedestrian route use the roadway shoulder?

The available data does not establish a blanket approval for shoulders. Whether that location is suitable depends on site geometry, traffic exposure, route continuity, and the agency-approved traffic-control plan; have the responsible designer assess it before directing pedestrians there.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Who approves a temporary pedestrian access route?

Approval authority depends on the project and jurisdiction. Check the permit, contract, and agency procedures to identify who reviews the traffic-control plan and who can authorize field changes.

What should I do if construction blocks the approved detour unexpectedly?

Treat a blocked route as an immediate access and safety issue: alert the responsible project and agency contacts, protect pedestrians from the hazard, and establish an approved usable alternative before directing people onward. Then document the obstruction and corrective action under the project’s reporting requirements.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 14, 2026 12:04 pm GMT+0000.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.