Managing stormwater runoff from a large retail parking lot requires a treatment train, not a single drain or underground tank. Reduce unnecessary pavement, preserve or add landscaped areas, direct runoff through bioretention or other filtration, use permeable pavement where site conditions permit, and detain excess flow before a controlled discharge. The right combination depends on soil infiltration, groundwater, slope, utilities, receiving waters, climate, traffic loads, and local post-construction rules. Confirm the applicable state, municipal, watershed, and NPDES requirements before fixing dimensions or claiming compliance.
Parking pavement increases both runoff speed and volume and can carry sediment, litter, metals, hydrocarbons, and other pollutants to a storm sewer or stream. A coordinated plan can reduce flooding at entrances and loading areas, protect downstream property, and make maintenance obligations predictable.
As an Amazon Associate I earn from qualifying purchases.
Why does a large retail parking lot create a stormwater problem?
Rain and snowmelt that flow across pavement and rooftops instead of soaking into soil become stormwater runoff. The U.S. Environmental Protection Agency explains that streets, parking lots, and roofs generate runoff from impervious surfaces that do not allow infiltration (EPA overview of urbanization and stormwater runoff). A shopping center concentrates several sources in one drainage area: parking stalls, drive aisles, loading docks, trash enclosures, fuel or service areas, building roofs, and sometimes runoff entering from adjacent parcels.
Pavement sends water to inlets faster than natural ground cover would. The resulting peak flow can overwhelm catch basins, pipes, culverts, or downstream channels. The same flow picks up tire and brake residue, fine sediment, trash, deicing material, and leaked vehicle fluids. A design that merely moves that water to an outfall may prevent a puddle on the lot while worsening erosion or water-quality problems downstream.
Popular on Amazon
- Ergonomically Designed: Work in tight areas with a compact design that gets into tough spots
- Both tools are designed to fit into difficult to reach spaces
- Complete a wide range of applications with a high-performance motor that delivers up to 300 UWO, and an impact driver delivering up to 1,400 in-lbs of torque
- Both the DEWALT impact driver and drill driver feature integrated LED work lights with a convenient 20-second delay, ensuring enhanced visibility in dimly lit or challenging work areas
- One-Handed Loading - Keep one hand free with a 1/4 in. hex chuck that accepts 1 in. bit tips
For that reason, treat runoff in stages: prevent or reduce it at the source, spread and infiltrate or filter what remains, store the larger storms, and release flow safely. Each stage has a different job, and local approval criteria determine how much volume, peak flow, and pollutant load the project must address.
Do I need a stormwater permit or post-construction approval?
Possibly. EPA’s NPDES program covers stormwater discharges from regulated municipal separate storm sewer systems, industrial activities, and construction activities. A redevelopment or expansion can trigger construction-permit coverage and post-construction requirements even when the completed lot is not itself an industrial facility. The controlling requirements come from the state, municipality, watershed authority, and the receiving-water program, not from a universal national parking-lot standard.
Do these 3 things before closing this tab:
1Clear out junk files and repair common Windows errors2Scan for outdated or missing drivers - takes under a minute3Repair Windows errors before they cause bigger problemsBefore selecting a basin, paver section, or underground chamber, obtain the jurisdiction’s current requirements for:
- the design storm and allowable post-development peak discharge;
- retention, infiltration, or water-quality volume;
- drawdown time and overflow routing;
- setbacks from buildings, property lines, wells, and groundwater;
- water-quality treatment for pollutants of concern;
- erosion and sediment control during construction;
- accessibility, fire-lane, and emergency-vehicle clearances; and
- an operations and maintenance agreement, inspection schedule, and reporting format.
EPA’s post-construction BMP menu is a useful starting point, but it does not replace the permit or the engineer’s calculations for your jurisdiction. Keep the permit determination, drainage report, calculations, drawings, easements, and maintenance agreement together so the owner and future operators know what was approved.
What should be done before choosing a drainage system?
Start with a site investigation and drainage map. A parking lot that looks uniform on an aerial image may have separate subcatchments, buried utilities, poor soils, or an outfall that backs up during the same storm that floods the stalls.
- Delineate every drainage area. Map parking rows, drive aisles, roofs, loading docks, dumpster pads, landscape areas, adjacent properties, inlets, manholes, pipes, easements, outfalls, and the receiving water. Confirm which areas actually drain to each inlet rather than relying only on old plans.
- Document existing failures. Photograph ponding, overflowing inlets, eroded shoulders, sediment deposits, clogged grates, trash accumulation, damaged curbs, and water entering stores or loading bays. Review maintenance logs, prior complaints, flood claims, and records of catch-basin cleaning.
- Characterize the ground. Test infiltration and compaction, identify seasonal high groundwater and bedrock, and check for contaminated soil. Record slopes, fill, pavement subgrade, and constructability limits. A soil that infiltrates on a test day may perform differently when compacted or seasonally saturated.
- Locate conflicts. Survey water, sewer, gas, electric, communications, irrigation, lighting, foundations, sign bases, tree roots, and snow-storage areas. Reserve inspection and maintenance access before placing a cell or chamber.
- Set project targets. Translate the local permit into required retention volume, treatment flow, peak-discharge limit, drawdown, emergency overflow, and inspection documentation. Identify whether a downstream stream, wetland, combined sewer, or flood-prone property imposes additional constraints.
How can the lot reduce runoff before adding infrastructure?
The least expensive gallon to manage is the gallon never generated. EPA describes “green parking” as a combination of right-sizing parking, alternative surfaces, and green infrastructure (EPA Green Parking BMP). For an existing center, unused or rarely occupied stalls can become landscape islands, infiltration areas, tree zones, or pedestrian space instead of remaining connected pavement.
Recommended Free Tools
Parking demand deserves a current, site-specific study rather than an automatic ratio. EPA’s reproduced Kimley-Horn (2016) table reports 3.60 spaces per 1,000 square feet under a ULI standard, 2.65 under an ITE standard, and actual-demand ranges of 0.36 to 3.0 spaces per 1,000 square feet across 12 municipalities. Those figures are planning evidence, not a substitute for counts by day, season, tenant mix, event schedule, shared parking, accessible-space obligations, and delivery needs.
Also popular on Amazon
- Valued Carpenter Pencil Set: You will get 2 pcs solid carpenter pencils with 26 piece 2.8 mm refills, 1 replaceable sharpener, 1 plastic storage box.The complete carpenter pencils combination allows you to finish your work faster and more easily
- Deep Hole Marker Pencil: The deep-hole construction pencils adopts 45mm elongated tip design, which is more convenient to mark in the small hole or in other tight areas that other carpenter markers cannot reach
- Carpenter Pencils with Sharpener: The sharpener is screwed into the top of the work pencil, which won't get lost either. Built-in pencil sharpener that keep the lead with pointed and smooth to Improves line of sight in fine work
- Stronger Solid Lead: This work pencil is matched with a 2.8 mm thick lead , which is much thicker and stronger during the drawing process of construction work, it will not break or damage easily
- Marks on Various Surfaces: 3 colors solid construction pencil can marks on various surfaces,such as metal, plastic, wood, paper etc. Ideals for woodworkers, contractors, craftsmen, builders, merchants and masons
Source controls can include consolidating parking, shortening unnecessary pavement, breaking large paved fields into landscaped bays, disconnecting roof downspouts to planted areas where permitted, and preserving existing trees and soil. Maintain safe sight lines, accessible routes, fire access, cart paths, snow storage, and truck turning radii while doing so. Every area removed from direct connection reduces the amount and speed of water that later BMPs must handle.
Which stormwater BMPs fit a retail parking lot?
No single BMP performs every function. Compare candidates by runoff-volume reduction, peak-flow control, pollutant treatment, land area, soil and groundwater suitability, utility conflicts, traffic loading, construction disruption, lifecycle maintenance, safety, and approval risk.
| Practice | Main job | Good fit | Limits and cautions |
|---|---|---|---|
| Bioretention or rain garden | Filters runoff through engineered soil and vegetation; may infiltrate or drain through an underdrain | Parking islands, landscaped setbacks, and pavement edges downslope of stalls | Needs space, pretreatment, vegetation care, and an underdrain where native soils are poorly permeable |
| Permeable pavement | Reduces directly connected impervious area and allows infiltration through the surface | New or reconstructed stalls, overflow parking, pedestrian zones, and selected drive aisles | Requires engineered subgrade, structural-load checks, clogging prevention, vacuum or other maintenance, and groundwater separation |
| Vegetated swale or filter strip | Slows, conveys, settles, and filters sheet flow | Gentle slopes and defined drainage paths | Less suitable for steep grades or concentrated high flows; needs stable overflow and healthy vegetation |
| Detention basin or wetland | Stores runoff and releases it slowly, with possible additional treatment | Sites with available surface land | Requires land, embankment and outlet design, safety controls, and sediment and vegetation maintenance |
| Underground retention or detention | Stores runoff below the lot and controls peak discharge | Dense commercial sites where a pond or wetland will not fit | Primarily a flow-control measure; commonly needs pretreatment and separate water-quality BMPs, plus inspection access |
How should bioretention be laid out in a parking lot?
Bioretention is often the most visible and adaptable part of a retail treatment train. EPA identifies commercial parking lots as excellent locations and recommends placing cells adjacent to and downslope of impervious surfaces (EPA bioretention toolbox). Parking islands, parcel setbacks, building landscaping, and the low side of a drive aisle can all work when they have enough soil volume and maintenance access.
Quick wins for a faster PC:
Clear out junk files and repair common Windows errorsFree Scan →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Repair Windows errors before they cause bigger problemsFix Now →Use curb cuts, depressed curb openings, or a stone diaphragm to spread inflow across the cell rather than concentrating it at one eroding point. Include a pretreatment strip, forebay, grate, or sediment sump where parking-lot solids could clog the media. Keep utilities, light poles, sign foundations, cart corrals, tree roots, and snow piles out of the excavation and maintenance path. Provide a defined overflow that safely returns excess water to a stable conveyance or approved outlet.
EPA’s schematic shows approximately 6 inches of ponding, 2–3 inches of mulch, 2.5–4 feet of filter media, and a 6-inch perforated pipe in an 8-inch gravel jacket. These are schematic examples, not universal prescriptions. The engineer must select media conductivity, ponding depth, storage, underdrain elevation, liner or infiltration configuration, and vegetation for local standards, pollutant goals, groundwater, and loading conditions.
Where existing soils have limited permeability—typically less than 0.5 inches per hour according to EPA—an underdrain should connect to a downstream drainage system or approved outlet. An underdrain does not eliminate the need to protect the cell from sediment or to verify that the receiving system can accept the discharge. Long-term ponding, exposed roots, mulch migration, and failed curb openings are signs that the cell needs inspection and correction.
Can permeable pavers or porous pavement handle commercial parking?
They can, but only when the pavement section and site conditions are engineered for the actual traffic. EPA identifies pervious concrete, porous asphalt, and pervious interlocking concrete pavers as permeable parking surfaces. A product name alone does not establish structural capacity, infiltration performance, accessibility, or permit compliance.
Also popular on Amazon
- 【Great Compatibility】This Katerk 1/4 inch hex shank bit holder is specifically designed for 1/4 inch hex shank drill bits. It's compatible with most 1/4 fast hex handles, hex sockets, various electric screwdrivers, and handheld screwdrivers. The bit holder makes it a valuable addition for any handyman.
- 【Secure and Safe】Built with a secure backup nut design, each drill bit holder securely locks onto your bits, ensuring they stay firmly in place. Additionally, our bit holder incorporates a high-quality steel ball rolling design that holds up to several kilograms of weight, ensuring your various drill bits don't fall off.
- 【Easy One-Handed Operation】The bit holder for impact driver allows you to change bits single-handedly, simplifying your workflow. Its multi-color design further allows for quick identification of the drill bit you need.
- 【Compact and Convenient】Thanks to its compact size, this 1/4 inch bit holder is easy to carry around. The bit holder allows for easy attachment to various tools, making this a convenient addition to your construction accessories. The Katerk bit holder is cast from high-quality alloy material, promising a long product lifespan. Despite its rugged strength, the bit holder remains lightweight, making it portable.
- 【Cool Christmas Gift For Men Stocking Stuffers】 This screwdriver bit holder, driver bit holder, impact bit holder, can be given as a gift to your loved one, especially for anyone involved in construction or electrical work. It's a must-have for stocking stuffers for men and women, tools gifts for dad, tech gadgets for men, gifts for dad, gifts for him, gifts for husband, gifts for boyfriend, cool gadgets for men, and cool gifts for dad.
Before procurement, document:
- design traffic, delivery vehicles, fire apparatus, and turning movements;
- surface, bedding, base, subbase, and subgrade thicknesses;
- subgrade preparation and compaction limits;
- infiltration or underdrain configuration and groundwater separation;
- edge restraints, accessible routes, slopes, crossfalls, and detectable warnings;
- sediment protection during adjacent construction;
- winter treatment, snowplow compatibility, and salt strategy; and
- inspection, vacuum sweeping, and repair responsibilities.
Keep muddy construction traffic and landscaping soil off the finished surface. A permeable section that is clogged before opening day will not deliver its design infiltration. Divert heavily sediment-laden areas, such as unpaved construction entrances or loading zones, to pretreatment or conventional inlets unless the approved design specifically addresses them. Permeable pavement may reduce runoff volume, but it still needs overflow routing for storms that exceed its storage or infiltration capacity.
When is underground detention the right answer?
Underground systems use large pipes, chambers, or tanks beneath the parking area to store runoff and release it at a controlled rate. EPA notes that they are useful where land for a pond or wetland is expensive or unavailable and can help maintain predevelopment peak-flow conditions (EPA underground retention/detention fact sheet).
The trade-off is important: underground storage primarily controls flow; it is not designed specifically to enhance water quality. Pair it with inlet protection, sediment pretreatment, bioretention, filters, or another approved treatment practice. Otherwise, sediment and trash can occupy storage, clog outlet controls, and create a difficult confined-space cleaning problem.
Design access points that allow inspection and sediment removal without dismantling the parking lot. Show invert elevations, bypasses, isolation valves where needed, high-water alarms if required, outlet-control details, and a safe emergency overflow. Coordinate excavation with utilities, groundwater, pavement loading, fire lanes, and future resurfacing. The operations plan should state who inspects the system, how often, what depth of sediment triggers removal, where material goes, and how the owner documents completion.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
What does a complete treatment train look like?
A typical retail arrangement might route roof downspouts and clean pavement to landscaped bioretention islands, send overflow through a vegetated swale or filter strip, and then discharge to a detention basin or underground chamber. A loading dock or trash enclosure may need a separate inlet, grate, sump, or approved pretreatment because it receives a higher sediment and pollutant load. Permeable stalls can reduce the volume entering the downstream system, while a controlled outlet handles the remaining peak flow.
Another site may use only a few components: right-size the parking field, convert surplus stalls to planted islands, use permeable pavement in overflow rows, and route the design storm to a compact detention system. A constrained urban parcel may need underground storage plus proprietary or conventional filtration, while a suburban parcel may fit a surface basin and wetland. The correct arrangement follows the drainage map and permit targets, not a standard package.
How should larger-than-design storms and flooding be handled?
Every system needs a safe route for water beyond the treatment or storage volume. Grade pavement away from storefront thresholds, electrical equipment, loading doors, and neighboring property. Set overflow elevations so a blocked inlet or full cell does not send water through a building. Show the exceedance path on the civil plans and verify that it does not cross an accessible route, fire lane, or pedestrian gathering area.
Also popular on Amazon
- Toolwiz 17-inch magnetic sweeper maintaining a load capacity of up to 8.8 pounds provides a perfect solution to the problem of clearing small ferrous metal objects, such as nails, tacks, bolts, and metal shavings from workshops or garage floors.
- Convenient and portable:17” is good for home, small workshop, or small yard as it is space-saving and more reachable for narrow areas. Perfect for collecting nails or small parts in the car, under the table, and in other nooks or crannies.
- Upgraded Handle Design: The handle features a sturdy, non-telescopic design to completely prevent slipping during use. By simply adding or removing the extension poles, the height can be adjusted to 3 different lengths: 18.9" (48 cm), 32.5" (82.5 cm), and 42.5" (108 cm) from ground to top. This customizable height helps prevent back bending and muscle strain, making your cleaning tasks effortless
- Flexible wheels: Upgrade wheel screws to avoid being too tight to spin or too loose. More comfortable 3-inch rubber wheels roll smoothly on carpet, grass, concrete, and hardwood floors. Just push and pull this rolling magnet-sweeper to pick up metal nails easily.
- Lightweight materials: The magnetic nail sweeper's compact and lightweight design makes the sweeping can be done anywhere you want, Push or pull it under the furniture, passing through the workshop floor, driveway, mud, grass, and gravel.
For existing flooding, separate hydraulic causes before adding capacity. A blocked grate, settled pavement, undersized outlet, downstream tailwater, or a collapsed pipe can mimic a shortage of storage. Clean and CCTV-inspect the conveyance where appropriate, survey actual elevations, and check whether an outfall is submerged during the problem storm. Correcting a maintenance failure may be faster than rebuilding the entire lot, but it does not remove the need to meet post-construction water-quality requirements.
PC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11Outdated Drivers Are Slowing You Down
One free scan finds every outdated or missing driver and matches the right update for your exact hardware.Free scan · exact hardware matchWhat construction practices protect the finished BMPs?
Construction sequencing is part of stormwater design. Stabilize entrances, maintain perimeter controls, and keep sediment-laden runoff away from completed bioretention media, underdrains, permeable pavement, and underground chambers. Install pretreatment and erosion controls before opening exposed soil. Do not use a completed cell as a sediment basin unless the approved plan expressly allows it and the media can be restored.
Protect excavated infiltration areas from compaction by equipment and stockpiles. Verify subgrade elevations and infiltration assumptions before placing aggregate or media. Inspect underdrain connections, cleanouts, overflow structures, and chamber access before covering them. At substantial completion, remove construction sediment, replace damaged vegetation or mulch, clean inlets, and record as-built elevations and materials. Provide the owner with warranties, product data, inspection points, and a marked maintenance plan.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What maintenance keeps a retail stormwater system working?
Operations and maintenance is a permanent part of the system, not post-project housekeeping. Assign responsibility to the property owner, manager, association, or contractor and provide a funding mechanism for recurring work.
- After major storms: inspect inlets, curb cuts, overflow routes, basins, and outlet controls for debris, erosion, standing water, and damage.
- Routinely: remove litter and sediment before it reaches media, swales, or chambers; keep grates clear; and document observations with dates and photographs.
- Bioretention: check for prolonged ponding, bare soil, clogged inflows, dead plants, mulch displacement, and compaction. Replace vegetation and mulch as needed without covering inlets or overflow elevations.
- Permeable pavement: inspect for sediment clogging, ponding, broken units, and settlement; use the specified vacuum or other approved cleaning method and avoid sealing products that block infiltration.
- Basins and swales: maintain stable side slopes, mow or trim according to the planting design, remove invasive growth, and remove sediment when storage or flow paths are reduced.
- Underground systems: inspect through every access point, check outlet controls, measure sediment, and remove accumulated material under the documented plan. Follow confined-space procedures where applicable.
Snow storage, deicing salts, shopping-cart traffic, utility work, resurfacing, and tenant changes can damage BMPs or alter drainage. Include those activities in the property’s site-management rules and require approval before covering, paving over, or relocating a treatment feature.
What common mistakes cause parking-lot drainage projects to fail?
- Designing from rainfall alone. Ignoring groundwater, soil compaction, tailwater, utilities, and receiving-water limits produces a system that works only on paper.
- Using detention as the entire solution. Storage can reduce peak flow while untreated sediment and hydrocarbons continue downstream. Add source control and water-quality treatment.
- Sending concentrated flow into a rain garden. Use spreaders, curb openings, pretreatment, erosion protection, and a stable overflow.
- Placing infiltration features in contaminated or saturated soil. Test soil and groundwater and follow local separation and contamination rules.
- Ignoring maintenance access. A hidden chamber, buried cleanout, or blocked island cannot be inspected or repaired economically.
- Overbuilding parking. Excess pavement increases both construction cost and the stormwater volume that must be managed. Validate demand before finalizing the layout.
- Allowing construction sediment onto permeable surfaces. Protect, isolate, and clean the surface before opening the lot.
What should be included in the final stormwater package?
A construction-ready package should show the drainage areas, existing and proposed contours, inlets, pipes, outfalls, utility conflicts, easements, BMP footprints, overflow routes, access points, and maintenance limits. Include hydrologic and hydraulic calculations, infiltration and groundwater data, treatment and storage volumes, outlet controls, emergency overflow elevations, and construction-phase erosion and sediment controls.
Add specifications for soil media, aggregate, plants, permeable pavement, underdrains, geotextiles, structures, and inspection requirements. Include a phasing plan that prevents sediment from entering completed work, an as-built survey requirement, acceptance criteria, and an operations manual naming the responsible party. The final review should reconcile civil, landscape, architectural, traffic, accessibility, fire, utility, and environmental requirements rather than treating stormwater as a separate drawing set.
Also popular on Amazon
- APPLY TO MOST DRILLS : 6 pieces screw extractors work with any drill and all the screw size or bolt (3-12mm), These extractor tools are used to reverse the damaged screw counterclockwise until it is released
- The DIY Tools for Men-Men won't know they need screw extractor set until they have one! This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and Unique tool gifts for men women. The must have stocking stuffers for men, gifts for dad, husband, father, him, guy teens, adult, Boyfriend, son on Birthdays, Christmas, Fathers Day or anniversary. Perfect Holiday Gifts Guide
- HIGH QUALITY - This damaged screw remover tool kit is made from High-Speed Steel H.S.S 4341# , which have high hardness of 63hrc, it's durable and easily to remove any damaged screws.
- EASY TO USE: Just two simple steps to get the job done - drill a hole with a cutting size using the right size screw extractor and easily remove the screw or bolt using the removal tool Hardness 63-65HRC: Titanium hardened steel material, more durable than most screw extractors on the market, better hardness and durability than others, buy with confidence and complete peace of mind
- Cool Gadgets for Men Dad Christmas Birthday Gifts for Men and Women - Men won't know they need screw extractor sets until they have one! Every screw has the potential to rust and break, which can create a situation where it cannot be removed. Owning it, there will be no anxiety about rusty screws. This screw extractor set is GIFTS WRAP AVAILABLE, can be gifted to your loved ones as it reflects a fresh trend with fun and practical. Amazing and unique tool gifts for men women. A must have stocking stuffer for men on birthdays, Christmas, Father's Day or anniversaries, a gifts for dads, husbands, fathers, him, adults, boyfriends, sons. The best and most practical and surprising Christmas gifts
For official design references, consult EPA’s stormwater management practices, the Green Parking BMP, the bioretention toolbox, and the NPDES post-construction menu. Use them to inform the design, then apply the standards and approval process that govern the specific retail site.
How we choose the right combination
The selection process is based on the site’s drainage and constraints: first reduce connected pavement and parking demand, then match each remaining flow path with infiltration, filtration, conveyance, and storage practices. Soil and groundwater testing, traffic loading, available land, utility conflicts, construction disruption, safety, lifecycle maintenance, receiving-water sensitivity, and local permit targets determine which BMPs stay in the final plan. The best design is the one the site can safely build, inspect, maintain, and document for its full service life.
Free tools Windows power users keep installed
One-click scans. No signup required.
Frequently Asked Questions
How often should a retail parking lot’s stormwater BMPs be inspected?
Inspection frequency is set by the approved maintenance plan and local permit, with additional checks after major storms and before seasonal high-use periods. The plan should define observable triggers—such as blocked inlets, prolonged ponding, sediment depth, or damaged vegetation—rather than relying on a calendar alone.
Can a retail center discharge parking-lot runoff to a nearby stream?
A nearby stream is not automatically an acceptable outfall. The owner must verify the receiving water, discharge point, allowable flow and pollutant limits, easements, and any NPDES or watershed conditions before connecting or modifying an outlet.
What happens if infiltration testing shows very low soil permeability?
The design can use underdrained bioretention, lined filtration, detention, or underground storage with a controlled outlet instead of relying on native-soil infiltration. Low permeability also increases the importance of drawdown calculations, underdrain access, and a safe overflow route.
Is converting parking spaces to landscape always allowed?
No. The revised layout still has to satisfy zoning, accessible-parking counts, fire access, delivery circulation, snow storage, sight-distance, and tenant requirements. Use a current parking-demand and code review before removing or restriping stalls.